X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0656043216000

Well Details

Well ID: 0656043216000
Loading map...
Location: 00/16-32-065-04W6/0
Location Alias: 00/16-32-65-04 W6M
Location Alias 2: 00/16-32-065-04 W6/00
Country: Canada
Province: Alberta
Township: 065
Meridian: 6
Range: 04
Section: 32
County/Municipality: Municipal District of Greenview No. 16
Well Name: PARA HZ KARR 16-32-65-4
Operator Name: Paramount Resources Ltd.
License Number: 0479686
License Date: 2016-06-16
License Status: Issued
Spud Date: 2016-07-30
Final Drill Date: 2016-09-26
Well Total Depth: 6070.00 m
Surface Hole Latitude: 54.673846
Surface Hole Longitude: -118.609103

For data sources see[1][2]

Well History

Date Event
2016-06-16 Obtained License
2016-08-01 Surface Casing Operation Performed
2016-08-08 Direction Drilling Operation Performed - Deviate
2016-08-18 Intermediate Casing Operation Performed
2016-09-14 Direction Drilling Operation Performed - Horizontal
2016-09-15 Well Log Performed
2016-09-26 Finished Drilling
2016-09-26 Well Log Performed
2016-09-26 Well Mode changed to Drilled and Cased
2016-09-27 Well Log Performed
2016-10-08 Liner Casing Operation Performed
2016-10-08 Perforation Treatment Performed - Open-Hole Completion
2016-10-11 Rig Released
2017-02-19 Perforation Treatment Performed - Multi-Stage Fracture
2017-02-20 Perforation Treatment Performed - Multi-Stage Fracture
2017-02-22 Perforation Treatment Performed - Jet Perforation
2017-02-23 Perforation Treatment Performed - Jet Perforation
2017-02-23 Perforation Treatment Performed - Multi-Stage Fracture
2017-02-25 Perforation Treatment Performed - Jet Perforation
2017-02-25 Perforation Treatment Performed - Multi-Stage Fracture
2017-02-26 Perforation Treatment Performed - Multi-Stage Fracture
2017-02-27 Perforation Treatment Performed - Jet Perforation
2017-02-28 Perforation Treatment Performed - Jet Perforation
2017-02-28 Perforation Treatment Performed - Multi-Stage Fracture
2017-03-01 Perforation Treatment Performed - Jet Perforation
2017-03-01 Perforation Treatment Performed - Multi-Stage Fracture
2017-03-02 Perforation Treatment Performed - Jet Perforation
2017-03-02 Perforation Treatment Performed - Multi-Stage Fracture
2017-03-03 Perforation Treatment Performed - Jet Perforation
2017-03-03 Perforation Treatment Performed - Multi-Stage Fracture
2017-03-04 Perforation Treatment Performed - Jet Perforation
2017-03-04 Perforation Treatment Performed - Multi-Stage Fracture
2017-03-05 Perforation Treatment Performed - Jet Perforation
2017-03-05 Perforation Treatment Performed - Multi-Stage Fracture
2017-03-07 Perforation Treatment Performed - Jet Perforation
2017-03-07 Perforation Treatment Performed - Multi-Stage Fracture
2017-03-08 Perforation Treatment Performed - Jet Perforation
2017-03-08 Perforation Treatment Performed - Multi-Stage Fracture
2017-03-09 Perforation Treatment Performed - Multi-Stage Fracture
2017-03-14 Perforation Treatment Performed - Jet Perforation
2017-03-14 Perforation Treatment Performed - Multi-Stage Fracture
2017-03-15 Perforation Treatment Performed - Jet Perforation
2017-03-15 Perforation Treatment Performed - Multi-Stage Fracture
2017-03-16 Perforation Treatment Performed - Jet Perforation
2017-03-16 Perforation Treatment Performed - Multi-Stage Fracture
2017-03-17 Perforation Treatment Performed - Jet Perforation
2017-03-17 Perforation Treatment Performed - Multi-Stage Fracture
2017-03-18 Perforation Treatment Performed - Jet Perforation
2017-03-18 Perforation Treatment Performed - Multi-Stage Fracture
2017-03-21 Perforation Treatment Performed - Jet Perforation
2017-03-22 Perforation Treatment Performed - Jet Perforation
2017-03-22 Perforation Treatment Performed - Multi-Stage Fracture
2017-03-23 Perforation Treatment Performed - Jet Perforation
2017-03-23 Perforation Treatment Performed - Multi-Stage Fracture
2017-03-24 Perforation Treatment Performed - Jet Perforation
2017-03-24 Perforation Treatment Performed - Multi-Stage Fracture
2017-03-27 Perforation Treatment Performed - Jet Perforation
2017-03-27 Perforation Treatment Performed - Multi-Stage Fracture
2017-03-28 Perforation Treatment Performed - Jet Perforation
2017-03-28 Perforation Treatment Performed - Multi-Stage Fracture
2017-03-29 Perforation Treatment Performed - Jet Perforation
2017-03-29 Perforation Treatment Performed - Multi-Stage Fracture
2017-03-30 Perforation Treatment Performed - Jet Perforation
2017-03-30 Perforation Treatment Performed - Multi-Stage Fracture
2017-03-31 Perforation Treatment Performed - Jet Perforation
2017-03-31 Perforation Treatment Performed - Multi-Stage Fracture
2017-04-01 Perforation Treatment Performed - Jet Perforation
2017-04-01 Perforation Treatment Performed - Multi-Stage Fracture
2017-04-01 Well Began Production
2017-04-01 Well Fluid changed to Gas
2017-04-01 Well Mode changed to Flowing
2017-04-02 Perforation Treatment Performed - Jet Perforation
2017-04-02 Perforation Treatment Performed - Multi-Stage Fracture
2017-04-03 Perforation Treatment Performed - Jet Perforation
2017-04-03 Perforation Treatment Performed - Multi-Stage Fracture
2017-04-04 Perforation Treatment Performed - Jet Perforation
2017-04-04 Perforation Treatment Performed - Multi-Stage Fracture
2017-04-05 Perforation Treatment Performed - Jet Perforation
2017-04-05 Perforation Treatment Performed - Multi-Stage Fracture
2017-08-27 Well Log Performed
2019-11-01 Well Fluid changed to Gas
2019-11-01 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2016-08-07 Fox Drilling Inc. 4 N/A Drill To LD
2016-09-12 Fox Drilling Inc. 4 N/A Resumption
2016-07-30 Fox Drilling Inc. 4 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2016-08-08 714.60 Deviate (5 - 79 degrees)
2016-09-14 2827.40 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2016-10-08 Open Hole/Barefoot Completion 6061.00 6070.00 0
2017-02-19 Multi-Stage Fracture 5668.80 5668.90 0
2017-03-30 Perforation 3568.60 3570.60 20
2017-03-30 Multi-Stage Fracture 3568.60 3570.60 0
2017-03-30 Perforation 3529.60 3531.60 20
2017-03-30 Multi-Stage Fracture 3529.60 3531.60 0
2017-03-30 Perforation 3491.60 3492.60 20
2017-03-30 Perforation 3479.60 3480.60 20
2017-03-30 Multi-Stage Fracture 3479.60 3492.60 0
2017-03-31 Perforation 3441.60 3442.60 20
2017-03-31 Perforation 3429.60 3430.60 20
2017-03-31 Multi-Stage Fracture 3429.60 3442.60 0
2017-02-20 Multi-Stage Fracture 5628.20 5628.30 0
2017-03-31 Perforation 3410.00 3411.00 20
2017-03-31 Perforation 3399.00 3400.00 20
2017-03-31 Multi-Stage Fracture 3399.00 3411.00 0
2017-03-31 Perforation 3360.00 3361.00 20
2017-03-31 Perforation 3350.00 3351.00 20
2017-04-01 Multi-Stage Fracture 3350.00 3361.00 0
2017-04-01 Perforation 3320.00 3321.00 20
2017-04-01 Perforation 3300.00 3301.00 20
2017-04-01 Multi-Stage Fracture 3300.00 3321.00 0
2017-04-01 Perforation 3274.00 3275.00 20
2017-02-20 Multi-Stage Fracture 5586.60 5586.70 0
2017-04-01 Perforation 3264.00 3265.00 20
2017-04-01 Multi-Stage Fracture 3264.00 3275.00 0
2017-04-01 Perforation 3234.00 3235.00 20
2017-04-01 Perforation 3224.00 3225.00 20
2017-04-01 Multi-Stage Fracture 3224.00 3235.00 0
2017-04-02 Perforation 3190.00 3191.00 20
2017-04-02 Perforation 3177.00 3178.00 20
2017-04-02 Multi-Stage Fracture 3177.00 3191.00 0
2017-04-02 Perforation 3147.00 3148.00 20
2017-04-02 Perforation 3137.00 3138.00 20
2017-02-20 Multi-Stage Fracture 5545.10 5545.20 0
2017-04-02 Multi-Stage Fracture 3137.00 3148.00 0
2017-04-02 Perforation 3108.00 3109.00 20
2017-04-02 Perforation 3097.00 3098.00 20
2017-04-03 Multi-Stage Fracture 3097.00 3109.00 0
2017-04-03 Perforation 3064.00 3065.00 20
2017-04-03 Perforation 3050.00 3051.00 20
2017-04-03 Multi-Stage Fracture 3050.00 3065.00 0
2017-04-03 Perforation 3024.00 3025.00 20
2017-04-03 Perforation 3010.00 3011.00 20
2017-04-04 Multi-Stage Fracture 3010.00 3025.00 0
2017-02-20 Multi-Stage Fracture 5503.40 5503.50 0
2017-04-04 Perforation 2975.00 2976.00 20
2017-04-04 Perforation 2962.00 2963.00 20
2017-04-04 Multi-Stage Fracture 2962.00 2976.00 0
2017-04-04 Perforation 2932.00 2933.00 20
2017-04-04 Perforation 2922.00 2923.00 20
2017-04-04 Multi-Stage Fracture 2922.00 2933.00 0
2017-04-04 Perforation 2895.00 2896.00 20
2017-04-04 Perforation 2882.00 2883.00 20
2017-04-05 Multi-Stage Fracture 2882.00 2896.00 0
2017-04-05 Perforation 2845.00 2846.00 20
2017-02-20 Multi-Stage Fracture 5461.80 5461.90 0
2017-04-05 Perforation 2834.00 2835.00 20
2017-04-05 Multi-Stage Fracture 2834.00 2846.00 0
2017-02-20 Multi-Stage Fracture 5420.20 5420.30 0
2017-02-20 Multi-Stage Fracture 5378.60 5378.70 0
2017-02-22 Perforation 5335.60 5337.60 13
2017-02-23 Multi-Stage Fracture 5335.60 5337.60 0
2017-02-19 Multi-Stage Fracture 5992.10 5992.20 0
2017-02-23 Perforation 5292.60 5294.60 13
2017-02-23 Multi-Stage Fracture 5292.60 5294.60 0
2017-02-23 Perforation 5249.60 5251.60 13
2017-02-25 Multi-Stage Fracture 5249.60 5251.60 0
2017-02-25 Perforation 5206.60 5208.60 13
2017-02-26 Multi-Stage Fracture 5206.60 5208.60 0
2017-02-27 Perforation 5163.60 5165.60 13
2017-02-28 Multi-Stage Fracture 5163.60 5165.60 0
2017-02-28 Perforation 5118.60 5120.60 13
2017-03-01 Multi-Stage Fracture 5118.60 5120.60 0
2017-02-19 Multi-Stage Fracture 5951.60 5951.70 0
2017-03-01 Perforation 5075.60 5077.60 13
2017-03-02 Multi-Stage Fracture 5075.60 5077.60 0
2017-03-02 Perforation 5034.60 5036.60 13
2017-03-03 Multi-Stage Fracture 5034.60 5036.60 0
2017-03-03 Perforation 4986.60 4988.60 13
2017-03-04 Multi-Stage Fracture 4986.60 4988.60 0
2017-03-04 Perforation 4948.60 4950.60 13
2017-03-05 Multi-Stage Fracture 4948.60 4950.60 0
2017-03-05 Perforation 4905.60 4907.60 13
2017-03-05 Multi-Stage Fracture 4905.60 4907.60 0
2017-02-19 Multi-Stage Fracture 5911.50 5911.60 0
2017-03-07 Perforation 4859.60 4861.60 13
2017-03-07 Multi-Stage Fracture 4859.60 4861.60 0
2017-03-08 Perforation 4819.60 4821.60 13
2017-03-08 Multi-Stage Fracture 4819.60 4821.60 0
2017-03-08 Perforation 4774.60 4776.60 13
2017-03-08 Multi-Stage Fracture 4774.60 4776.60 0
2017-03-08 Perforation 4733.60 4735.60 13
2017-03-09 Multi-Stage Fracture 4733.60 4735.60 0
2017-03-14 Perforation 4690.60 4692.60 13
2017-03-14 Multi-Stage Fracture 4690.60 4692.60 0
2017-02-19 Multi-Stage Fracture 5871.40 5871.50 0
2017-03-15 Perforation 4644.60 4646.60 13
2017-03-15 Multi-Stage Fracture 4644.60 4646.60 0
2017-03-16 Perforation 4604.60 4606.60 20
2017-03-16 Multi-Stage Fracture 4604.60 4606.60 0
2017-03-16 Perforation 4561.60 4563.60 20
2017-03-16 Multi-Stage Fracture 4561.60 4563.60 0
2017-03-16 Perforation 4516.60 4518.60 20
2017-03-17 Multi-Stage Fracture 4516.60 4518.60 0
2017-03-17 Perforation 4475.60 4477.60 20
2017-03-17 Multi-Stage Fracture 4475.60 4477.60 0
2017-02-19 Multi-Stage Fracture 5831.00 5831.10 0
2017-03-17 Perforation 4428.60 4430.60 20
2017-03-17 Multi-Stage Fracture 4428.60 4430.60 0
2017-03-18 Perforation 4389.50 4391.50 20
2017-03-18 Multi-Stage Fracture 4389.50 4391.50 0
2017-03-21 Perforation 4344.60 4346.60 20
2017-03-22 Multi-Stage Fracture 4344.60 4346.60 0
2017-03-22 Perforation 4303.60 4305.60 20
2017-03-22 Multi-Stage Fracture 4303.60 4305.60 0
2017-03-22 Perforation 4260.60 4262.60 20
2017-03-22 Multi-Stage Fracture 4260.60 4262.60 0
2017-02-19 Multi-Stage Fracture 5791.00 5791.10 0
2017-03-22 Perforation 4217.60 4219.60 20
2017-03-23 Multi-Stage Fracture 4217.60 4219.60 0
2017-03-23 Perforation 4174.60 4176.60 20
2017-03-23 Multi-Stage Fracture 4174.60 4176.60 0
2017-03-23 Perforation 4132.60 4134.60 20
2017-03-23 Multi-Stage Fracture 4132.60 4134.60 0
2017-03-23 Perforation 4088.60 4090.60 20
2017-03-24 Multi-Stage Fracture 4088.60 4090.60 0
2017-03-24 Perforation 4045.60 4047.60 20
2017-03-24 Multi-Stage Fracture 4045.60 4047.60 0
2017-02-19 Multi-Stage Fracture 5750.80 5750.90 0
2017-03-24 Perforation 4000.60 4002.60 20
2017-03-24 Multi-Stage Fracture 4000.60 4002.60 0
2017-03-24 Perforation 3959.60 3961.60 20
2017-03-24 Multi-Stage Fracture 3959.60 3961.60 0
2017-03-24 Perforation 3916.60 3918.60 20
2017-03-27 Multi-Stage Fracture 3916.60 3918.60 0
2017-03-27 Perforation 3871.60 3873.60 20
2017-03-27 Multi-Stage Fracture 3871.60 3873.60 0
2017-03-27 Perforation 3830.60 3832.60 20
2017-03-28 Multi-Stage Fracture 3830.60 3832.60 0
2017-02-19 Multi-Stage Fracture 5709.70 5709.80 0
2017-03-28 Perforation 3786.60 3788.60 20
2017-03-28 Multi-Stage Fracture 3786.60 3788.60 0
2017-03-28 Perforation 3744.60 3746.60 20
2017-03-28 Multi-Stage Fracture 3744.60 3746.60 0
2017-03-29 Perforation 3701.60 3703.60 20
2017-03-29 Multi-Stage Fracture 3701.60 3703.60 0
2017-03-29 Perforation 3658.60 3660.60 20
2017-03-29 Multi-Stage Fracture 3658.60 3660.60 0
2017-03-29 Perforation 3616.60 3618.60 20
2017-03-29 Multi-Stage Fracture 3616.60 3618.60 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-02-19 2017-04-05 2,742 49,016 N/A
2 2017-02-19 2017-04-04 2,742 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 85.9573 N/A
40/70 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 13.2848 N/A
15% HCl Calfrac Acid Hydrochloric acid 7647-01-0 100 0.5064 N/A
Water 7732-18-5 100 0.5064 N/A
DWP-944 Calfrac Bactericide/Biocide Acetamide. 2.2-dibromo-2-cyano 10222-01-2 100 0.0104 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0104 N/A
DWP-913 Calfrac Clay Control Non-Hazardous Ingredients Trade Secret 100 0.0688 N/A
CI-9100G Calfrac Corrosion Inhibitor Alcohols. C12-15. ethoxylated 68131-39-5 100 0.0002 N/A
Cinnamaldehyde 104-55-2 100 0.0002 N/A
Dipropylene glycol monomethyl ether 34590-94-8 100 0.0002 N/A
Ethylene Glycol 107-21-1 100 0.0002 N/A
Formic acid 64-18-6 100 0.0002 N/A
Isopropyl alcohol 67-63-0 100 0.0002 N/A
Tar bases. quinoline derivs. 68513-87-1 100 0.0002 N/A
Tar bases. quinolone derivs.. benzyl chloride-quarternized 72480-70-7 100 0.0002 N/A
DAP-131 Calfrac Demulsifier 2-Propanol 67-63-0 100 0.0003 N/A
Inorganic acid 8692 100 0.0003 N/A
Sulfonated hydrocarbon 8692 100 0.0003 N/A
DWP-959 Calfrac Demulsifier Methanol 67-56-1 100 0.0703 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0703 N/A
CalVisc Calfrac Friction Reducer Non-Hazardous Ingredients Trade Secret 100 0.0986 N/A
2 DWP-690 Calfrac Breaker Hydrogen peroxide 7722-84-1 100 0.0166 N/A
Water 7732-18-5 100 0.0166 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2016-12-12 2016-12-21 Surface Water - River 46678

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 4701 0.0 0.0 0.0
2018 8187 0.0 0.0 0.0
2019 8559 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-10-11 No Incident Encountered 0.00 0.00
2017-04-05 No Incident Encountered 0.00 0.00

For data sources see[10]

References