X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0656051804002

Well Details

Well ID: 0656051804002
Loading map...
Location: 00/04-18-065-05W6/2
Location Alias: 00/04-18-65-05 W6M
Location Alias 2: 00/04-18-065-05 W6/02
Country: Canada
Province: Alberta
Township: 065
Meridian: 6
Range: 05
Section: 18
County/Municipality: Municipal District of Greenview No. 16
Well Name: PARA HZ KARR 4-18-65-5
Operator Name: Paramount Resources Ltd.
License Number: 0432938
License Date: 2011-04-08
License Status: Suspension
Spud Date: 2011-06-04
Final Drill Date: 2011-08-15
Well Total Depth: 4647.00 m
Surface Hole Latitude: 54.632488
Surface Hole Longitude: -118.752563

For data sources see[1][2]

Well History

Date Event
2011-04-08 Obtained License
2011-07-14 Direction Drilling Operation Performed - Horizontal
2011-07-20 Well Log Performed
2011-07-26 Intermediate Casing Operation Performed
2011-08-15 Finished Drilling
2011-08-15 Well Log Performed
2011-08-15 Well Mode changed to Drilled and Cased
2011-08-16 Well Log Performed
2011-08-18 Liner Casing Operation Performed
2011-08-18 Perforation Treatment Performed - Open-Hole Completion
2011-08-19 Rig Released
2012-02-14 Perforation Treatment Performed - Multi-Stage Fracture
2012-02-15 Perforation Treatment Performed - Multi-Stage Fracture
2012-02-16 Perforation Treatment Performed - Multi-Stage Fracture
2012-02-17 Perforation Treatment Performed - Multi-Stage Fracture
2012-02-20 Well Log Performed
2012-04-15 Well Log Performed
2014-12-23 Well Began Production
2014-12-23 Well Fluid changed to Gas
2014-12-23 Well Mode changed to Flowing
2016-06-29 Well Fluid changed to Gas
2016-06-29 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-07-14 2825.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-08-18 Open Hole/Barefoot Completion 4641.00 4647.00 0
2012-02-15 Multi-Stage Fracture 4130.10 4130.90 0
2012-02-16 Multi-Stage Fracture 4062.20 4063.00 0
2012-02-16 Multi-Stage Fracture 3993.70 3994.50 0
2012-02-16 Multi-Stage Fracture 3925.60 3926.40 0
2012-02-16 Multi-Stage Fracture 3857.70 3858.50 0
2012-02-16 Multi-Stage Fracture 3789.60 3790.40 0
2012-02-16 Multi-Stage Fracture 3721.50 3722.30 0
2012-02-17 Multi-Stage Fracture 3721.50 3722.30 0
2012-02-17 Multi-Stage Fracture 3641.30 3642.10 0
2012-02-17 Multi-Stage Fracture 3561.60 3562.40 0
2012-02-14 Multi-Stage Fracture 4631.70 4633.00 0
2012-02-17 Multi-Stage Fracture 3481.40 3482.20 0
2012-02-17 Multi-Stage Fracture 3401.40 3402.20 0
2012-02-17 Multi-Stage Fracture 3333.10 3333.90 0
2012-02-14 Multi-Stage Fracture 4569.50 4570.30 0
2012-02-14 Multi-Stage Fracture 4513.70 4514.50 0
2012-02-14 Multi-Stage Fracture 4458.00 4458.80 0
2012-02-15 Multi-Stage Fracture 4402.70 4403.50 0
2012-02-15 Multi-Stage Fracture 4334.60 4335.40 0
2012-02-15 Multi-Stage Fracture 4266.30 4267.10 0
2012-02-15 Multi-Stage Fracture 4198.10 4198.90 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2014 195 0.0 0.0 0.0
2015 1104 0.0 0.0 0.0

For data sources see[6]

References