X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0656052501000

Well Details

Well ID: 0656052501000
Loading map...
Location: 00/01-25-065-05W6/0
Location Alias: 00/01-25-65-05 W6M
Location Alias 2: 00/01-25-065-05 W6/00
Country: Canada
Province: Alberta
Township: 065
Meridian: 6
Range: 05
Section: 25
County/Municipality: Municipal District of Greenview No. 16
Well Name: PARA HZ KARR 1-25-65-5
Operator Name: Paramount Resources Ltd.
License Number: 0474618
License Date: 2015-02-13
License Status: Amended
Spud Date: 2015-05-22
Final Drill Date: 2015-06-18
Well Total Depth: 5540.00 m
Surface Hole Latitude: 54.673905
Surface Hole Longitude: -118.608951

For data sources see[1][2]

Well History

Date Event
2015-02-13 Obtained License
2015-05-23 Surface Casing Operation Performed
2015-05-31 Direction Drilling Operation Performed - Deviate
2015-06-05 Intermediate Casing Operation Performed
2015-06-07 Direction Drilling Operation Performed - Horizontal
2015-06-18 Finished Drilling
2015-06-18 Well Log Performed
2015-06-18 Well Mode changed to Drilled and Cased
2015-06-23 Liner Casing Operation Performed
2015-06-23 Perforation Treatment Performed - Open-Hole Completion
2015-06-23 Well Log Performed
2015-06-26 Rig Released
2015-07-21 Perforation Treatment Performed - Multi-Stage Fracture
2015-07-22 Perforation Treatment Performed - Multi-Stage Fracture
2015-07-23 Perforation Treatment Performed - Multi-Stage Fracture
2015-07-24 Perforation Treatment Performed - Multi-Stage Fracture
2015-07-25 Perforation Treatment Performed - Multi-Stage Fracture
2015-07-26 Perforation Treatment Performed - Multi-Stage Fracture
2015-07-27 Perforation Treatment Performed - Multi-Stage Fracture
2015-07-28 Well Fluid changed to Gas
2015-07-28 Well Mode changed to Testing
2015-08-01 Well Began Production
2015-08-01 Well Fluid changed to Gas
2015-08-01 Well Mode changed to Flowing
2018-01-19 Well Fluid changed to Gas
2018-01-19 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2015-05-31 2529.70 Deviate (5 - 79 degrees)
2015-06-07 2860.90 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-06-23 Open Hole/Barefoot Completion 5530.00 5540.00 0
2015-07-23 Multi-Stage Fracture 4837.90 4838.70 0
2015-07-23 Multi-Stage Fracture 4754.40 4755.20 0
2015-07-23 Multi-Stage Fracture 4671.10 4671.90 0
2015-07-24 Multi-Stage Fracture 4587.70 4588.50 0
2015-07-24 Multi-Stage Fracture 4504.60 4505.40 0
2015-07-24 Multi-Stage Fracture 4421.50 4422.30 0
2015-07-24 Multi-Stage Fracture 4338.10 4338.90 0
2015-07-25 Multi-Stage Fracture 4254.70 4255.50 0
2015-07-25 Multi-Stage Fracture 4171.30 4172.10 0
2015-07-25 Multi-Stage Fracture 4087.90 4088.70 0
2015-07-21 Multi-Stage Fracture 5521.00 5522.30 0
2015-07-25 Multi-Stage Fracture 4004.90 4005.70 0
2015-07-25 Multi-Stage Fracture 3921.50 3922.30 0
2015-07-25 Multi-Stage Fracture 3838.00 3838.80 0
2015-07-26 Multi-Stage Fracture 3754.60 3755.40 0
2015-07-26 Multi-Stage Fracture 3671.80 3672.60 0
2015-07-26 Multi-Stage Fracture 3588.60 3589.40 0
2015-07-26 Multi-Stage Fracture 3492.60 3493.40 0
2015-07-26 Multi-Stage Fracture 3396.70 3397.50 0
2015-07-27 Multi-Stage Fracture 3338.60 3339.40 0
2015-07-27 Multi-Stage Fracture 3242.50 3243.30 0
2015-07-22 Multi-Stage Fracture 5420.50 5421.30 0
2015-07-27 Multi-Stage Fracture 3146.50 3147.40 0
2015-07-27 Multi-Stage Fracture 3075.90 3076.70 0
2015-07-27 Multi-Stage Fracture 2992.60 2993.40 0
2015-07-27 Multi-Stage Fracture 2909.10 2909.90 0
2015-07-27 Multi-Stage Fracture 2825.70 2826.50 0
2015-07-22 Multi-Stage Fracture 5337.40 5338.30 0
2015-07-22 Multi-Stage Fracture 5254.10 5254.90 0
2015-07-22 Multi-Stage Fracture 5170.70 5171.60 0
2015-07-22 Multi-Stage Fracture 5087.50 5088.30 0
2015-07-23 Multi-Stage Fracture 5004.60 5005.40 0
2015-07-23 Multi-Stage Fracture 4921.20 4922.00 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-07-21 2015-07-27 2,775 4,856 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 35.804 N/A
40/70 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 29.7776 N/A
DWP-412 Calfrac Activator Non-Hazardous Ingredients Trade Secret 100 0.2647 N/A
DWP-966 Calfrac Bactericide/Biocide Bronopol 52-51-7 100 0.0193 N/A
Methanol 67-56-1 100 0.0185 N/A
Water 7732-18-5 100 0.0185 N/A
DWP-913 Calfrac Clay Control Non-Hazardous Ingredients Trade Secret 100 0.0333 N/A
Nitrogen Calfrac Energizing Fluid Nitrogen 7727-37-9 100 40.1508 N/A
DWP-421 Calfrac Surfactant 2-Propanol 67-63-0 100 0.7754 N/A
Fatty amine I 8725 100 0.7752 N/A
Fatty amine II 8725 100 0.7752 N/A
Non-Hazardous Ingredients Trade Secret 100 0.7754 N/A
Water 7732-18-5 100 0.7754 N/A

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-07-07 2015-07-15 Surface Water - Runoff 6663

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 3276 0.0 0.0 0.0
2016 8083 0.0 0.0 0.0
2017 2920 0.0 0.0 0.0
2018 970 0.0 0.0 0.0
2019 1196 0.0 0.0 0.0
2020 791 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-06-29 No Incident Encountered 0.00 0.00
2015-07-27 No Incident Encountered 0.00 0.00
2015-08-05 No Incident Encountered 0.00 0.00

For data sources see[9]

References