X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0656052501030

Well Details

Well ID: 0656052501030
Loading map...
Location: 03/01-25-065-05W6/0
Location Alias: 03/01-25-65-05 W6M
Location Alias 2: 03/01-25-065-05 W6/00
Country: Canada
Province: Alberta
Township: 065
Meridian: 6
Range: 05
Section: 25
County/Municipality: Municipal District of Greenview No. 16
Well Name: PARA HZ 103 KARR 1-25-65-5
Operator Name: Paramount Resources Ltd.
License Number: 0480302
License Date: 2016-09-07
License Status: Amended
Spud Date: 2017-03-14
Final Drill Date: 2017-05-09
Well Total Depth: 5838.00 m
Surface Hole Latitude: 54.676623
Surface Hole Longitude: -118.613299

For data sources see[1][2]

Well History

Date Event
2016-09-07 Obtained License
2017-03-16 Surface Casing Operation Performed
2017-03-18 Direction Drilling Operation Performed - Deviate
2017-03-26 Intermediate Casing Operation Performed
2017-04-27 Direction Drilling Operation Performed - Horizontal
2017-05-09 Finished Drilling
2017-05-09 Well Log Performed
2017-05-09 Well Mode changed to Drilled and Cased
2017-05-11 Production Casing Operation Performed
2017-05-13 Rig Released
2017-09-20 Perforation Treatment Performed - Multi-Stage Fracture
2017-09-21 Perforation Treatment Performed - Multi-Stage Fracture
2017-09-22 Perforation Treatment Performed - Multi-Stage Fracture
2017-09-29 Perforation Treatment Performed - Fractured
2017-09-29 Perforation Treatment Performed - Jet Perforation
2017-09-30 Perforation Treatment Performed - Fractured
2017-09-30 Perforation Treatment Performed - Jet Perforation
2017-10-01 Perforation Treatment Performed - Fractured
2017-10-01 Perforation Treatment Performed - Jet Perforation
2017-10-02 Perforation Treatment Performed - Fractured
2017-10-02 Perforation Treatment Performed - Jet Perforation
2017-10-03 Perforation Treatment Performed - Fractured
2017-10-03 Perforation Treatment Performed - Jet Perforation
2017-10-04 Perforation Treatment Performed - Fractured
2017-10-04 Perforation Treatment Performed - Jet Perforation
2017-10-05 Perforation Treatment Performed - Fractured
2017-10-05 Perforation Treatment Performed - Jet Perforation
2017-10-08 Perforation Treatment Performed - Fractured
2017-10-08 Perforation Treatment Performed - Jet Perforation
2017-10-09 Perforation Treatment Performed - Fractured
2017-10-09 Perforation Treatment Performed - Jet Perforation
2017-10-10 Perforation Treatment Performed - Fractured
2017-10-10 Perforation Treatment Performed - Jet Perforation
2017-10-11 Perforation Treatment Performed - Fractured
2017-10-11 Perforation Treatment Performed - Jet Perforation
2017-10-12 Perforation Treatment Performed - Fractured
2017-10-12 Perforation Treatment Performed - Jet Perforation
2017-10-13 Perforation Treatment Performed - Fractured
2017-10-13 Perforation Treatment Performed - Jet Perforation
2017-10-14 Perforation Treatment Performed - Fractured
2017-10-14 Perforation Treatment Performed - Jet Perforation
2017-10-15 Perforation Treatment Performed - Fractured
2017-10-15 Perforation Treatment Performed - Jet Perforation
2017-10-16 Perforation Treatment Performed - Fractured
2017-10-16 Perforation Treatment Performed - Jet Perforation
2017-10-17 Perforation Treatment Performed - Fractured
2017-10-17 Perforation Treatment Performed - Jet Perforation
2017-10-18 Perforation Treatment Performed - Fractured
2017-10-18 Perforation Treatment Performed - Jet Perforation
2017-10-19 Perforation Treatment Performed - Fractured
2017-10-19 Perforation Treatment Performed - Jet Perforation
2017-10-20 Perforation Treatment Performed - Fractured
2017-10-20 Perforation Treatment Performed - Jet Perforation
2017-10-21 Perforation Treatment Performed - Fractured
2017-10-21 Perforation Treatment Performed - Jet Perforation
2017-10-22 Perforation Treatment Performed - Fractured
2017-10-22 Perforation Treatment Performed - Jet Perforation
2017-10-23 Perforation Treatment Performed - Fractured
2017-10-23 Perforation Treatment Performed - Jet Perforation
2017-11-13 Well Began Production
2017-11-13 Well Fluid changed to Gas
2017-11-13 Well Mode changed to Flowing
2018-09-13 Well Fluid changed to Gas
2018-09-13 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-03-14 Fox Drilling Inc. 3 N/A Set Surface

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-03-18 746.40 Deviate (5 - 79 degrees)
2017-04-27 2953.20 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-09-20 Multi-Stage Fracture 5780.60 5780.70 0
2017-09-22 Multi-Stage Fracture 5395.70 5395.80 0
2017-10-09 Perforation 4293.00 4293.50 6
2017-10-09 Perforation 4280.00 4280.50 6
2017-10-09 Perforation 4267.00 4267.50 6
2017-10-09 Fracture 4267.00 4293.50 0
2017-10-09 Perforation 4252.00 4252.50 6
2017-10-09 Perforation 4240.00 4240.50 6
2017-10-09 Perforation 4227.00 4227.50 6
2017-10-09 Fracture 4227.00 4252.50 0
2017-10-09 Perforation 4213.00 4213.50 6
2017-10-09 Perforation 4200.00 4200.50 6
2017-09-22 Multi-Stage Fracture 5354.80 5354.90 0
2017-10-09 Perforation 4187.00 4187.50 6
2017-10-09 Fracture 4187.00 4213.50 0
2017-10-09 Perforation 4171.00 4171.50 6
2017-10-09 Perforation 4159.00 4159.50 6
2017-10-09 Perforation 4147.00 4147.50 6
2017-10-09 Fracture 4147.00 4171.50 0
2017-10-10 Perforation 4133.00 4133.50 6
2017-10-10 Perforation 4120.00 4120.50 6
2017-10-10 Perforation 4107.00 4107.50 6
2017-10-10 Fracture 4107.00 4133.50 0
2017-09-22 Multi-Stage Fracture 5313.90 5314.00 0
2017-10-10 Perforation 4093.00 4093.50 6
2017-10-10 Perforation 4080.00 4080.50 6
2017-10-10 Perforation 4067.00 4067.50 6
2017-10-10 Fracture 4067.00 4093.50 0
2017-10-10 Perforation 4053.00 4053.50 6
2017-10-10 Perforation 4050.00 4050.50 6
2017-10-10 Perforation 4027.00 4027.50 6
2017-10-10 Fracture 4027.00 4053.50 0
2017-10-11 Perforation 4013.00 4013.50 6
2017-10-11 Perforation 4000.00 4000.50 6
2017-09-22 Multi-Stage Fracture 5273.10 5273.20 0
2017-10-11 Perforation 3987.00 3987.50 6
2017-10-11 Fracture 3987.00 4013.50 0
2017-10-11 Perforation 3971.00 3971.50 6
2017-10-11 Perforation 3961.00 3961.50 6
2017-10-11 Perforation 3948.00 3948.50 6
2017-10-11 Fracture 3948.00 3971.50 0
2017-10-12 Perforation 3933.00 3933.50 6
2017-10-12 Perforation 3920.00 3920.50 6
2017-10-12 Perforation 3907.00 3907.50 6
2017-10-12 Fracture 3907.00 3933.50 0
2017-09-22 Multi-Stage Fracture 5232.20 5232.30 0
2017-10-12 Perforation 3893.00 3893.50 6
2017-10-12 Perforation 3880.00 3880.50 6
2017-10-12 Perforation 3867.00 3867.50 6
2017-10-12 Fracture 3867.00 3893.50 0
2017-10-13 Perforation 3853.00 3853.50 6
2017-10-13 Perforation 3840.00 3840.50 6
2017-10-13 Perforation 3827.00 3827.50 6
2017-10-13 Fracture 3827.00 3853.50 0
2017-10-13 Perforation 3812.00 3812.50 6
2017-10-13 Perforation 3800.00 3800.50 6
2017-09-22 Multi-Stage Fracture 5191.80 5191.90 0
2017-10-13 Perforation 3787.00 3787.50 6
2017-10-13 Fracture 3787.00 3812.50 0
2017-10-14 Perforation 3773.00 3773.50 6
2017-10-14 Perforation 3760.00 3760.50 6
2017-10-14 Perforation 3747.00 3747.50 6
2017-10-14 Fracture 3747.00 3773.50 0
2017-10-14 Perforation 3732.00 3732.50 6
2017-10-14 Perforation 3718.00 3718.50 6
2017-10-14 Perforation 3708.00 3708.50 6
2017-10-14 Fracture 3708.00 3732.50 0
2017-09-22 Multi-Stage Fracture 5150.70 5150.80 0
2017-10-14 Perforation 3693.00 3693.50 6
2017-10-14 Perforation 3680.00 3680.50 6
2017-10-14 Perforation 3667.00 3667.50 6
2017-10-14 Fracture 3667.00 3693.50 0
2017-10-15 Perforation 3653.00 3653.50 6
2017-10-15 Perforation 3640.00 3640.50 6
2017-10-15 Perforation 3627.00 3627.50 6
2017-10-15 Fracture 3627.00 3653.50 0
2017-10-15 Perforation 3612.00 3612.50 6
2017-10-15 Perforation 3599.00 3599.50 6
2017-09-29 Perforation 5133.00 5133.50 6
2017-10-15 Perforation 3586.00 3586.50 6
2017-10-15 Fracture 3586.00 3612.50 0
2017-10-16 Perforation 3573.00 3573.50 6
2017-10-16 Perforation 3560.00 3560.50 6
2017-10-16 Perforation 3547.00 3547.50 6
2017-10-16 Fracture 3547.00 3573.50 0
2017-10-16 Perforation 3533.00 3533.50 6
2017-10-16 Perforation 3520.00 3520.50 6
2017-10-16 Perforation 3507.00 3507.50 6
2017-10-16 Fracture 3507.00 3533.50 0
2017-09-29 Perforation 5120.00 5120.50 6
2017-10-17 Perforation 3493.00 3493.50 6
2017-10-17 Perforation 3480.00 3480.50 6
2017-10-17 Perforation 3466.00 3466.50 6
2017-10-17 Fracture 3466.00 3493.50 0
2017-10-17 Perforation 3452.00 3452.50 6
2017-10-17 Perforation 3440.00 3440.50 6
2017-10-17 Perforation 3427.00 3427.50 6
2017-10-17 Fracture 3427.00 3452.50 0
2017-10-18 Perforation 3413.00 3413.50 6
2017-10-18 Perforation 3400.00 3400.50 6
2017-09-29 Perforation 5107.00 5107.50 6
2017-10-18 Perforation 3387.00 3387.50 6
2017-10-18 Fracture 3387.00 3413.50 0
2017-10-18 Perforation 3373.00 3373.50 6
2017-10-18 Perforation 3360.00 3360.50 6
2017-10-18 Perforation 3347.00 3347.50 6
2017-10-18 Fracture 3347.00 3373.50 0
2017-10-18 Perforation 3333.00 3333.50 6
2017-10-18 Perforation 3318.00 3318.50 6
2017-10-18 Perforation 3307.00 3307.50 6
2017-10-18 Fracture 3307.00 3333.50 0
2017-09-21 Multi-Stage Fracture 5723.30 5723.40 0
2017-09-29 Fracture 5107.00 5133.50 0
2017-10-19 Perforation 3293.00 3293.50 6
2017-10-19 Perforation 3280.00 3280.50 6
2017-10-19 Perforation 3268.00 3268.50 6
2017-10-19 Fracture 3268.00 3293.50 0
2017-10-19 Perforation 3253.00 3253.50 6
2017-10-19 Perforation 3240.00 3240.50 6
2017-10-19 Perforation 3227.00 3227.50 6
2017-10-19 Fracture 3227.00 3253.50 0
2017-10-20 Perforation 3213.00 3213.50 6
2017-10-20 Perforation 3200.00 3200.50 6
2017-09-29 Perforation 5093.00 5093.50 6
2017-10-20 Perforation 3187.00 3187.50 6
2017-10-20 Fracture 3187.00 3213.50 0
2017-10-20 Perforation 3173.00 3173.50 6
2017-10-20 Perforation 3160.00 3160.50 6
2017-10-20 Perforation 3147.00 3147.50 6
2017-10-20 Fracture 3147.00 3173.50 0
2017-10-21 Perforation 3133.00 3133.50 6
2017-10-21 Perforation 3120.00 3120.50 6
2017-10-21 Perforation 3107.00 3107.50 6
2017-10-21 Fracture 3107.00 3133.50 0
2017-09-29 Perforation 5078.00 5078.50 6
2017-10-21 Perforation 3093.00 3093.50 6
2017-10-21 Perforation 3080.00 3080.50 6
2017-10-21 Perforation 3067.00 3067.50 6
2017-10-21 Fracture 3067.00 3093.50 0
2017-10-21 Perforation 3053.00 3053.50 6
2017-10-21 Perforation 3040.00 3040.50 6
2017-10-21 Perforation 3027.00 3027.50 6
2017-10-21 Fracture 3027.00 3053.50 0
2017-10-22 Perforation 3013.00 3013.50 6
2017-10-22 Perforation 3000.00 3000.50 6
2017-09-29 Perforation 5066.50 5067.00 6
2017-10-22 Perforation 2987.00 2987.50 6
2017-10-22 Fracture 2987.00 3013.50 0
2017-10-22 Perforation 2973.00 2973.50 6
2017-10-22 Perforation 2960.00 2960.50 6
2017-10-22 Perforation 2947.00 2947.50 6
2017-10-22 Fracture 2947.00 2973.50 0
2017-10-23 Perforation 2933.00 2933.50 6
2017-10-23 Perforation 2920.00 2920.50 6
2017-10-23 Perforation 2907.00 2907.50 6
2017-10-23 Fracture 2907.00 2933.50 0
2017-09-29 Fracture 5066.50 5093.50 0
2017-09-29 Perforation 5053.00 5053.50 6
2017-09-29 Perforation 5040.00 5040.50 6
2017-09-29 Perforation 5027.00 5027.50 6
2017-09-29 Fracture 5027.00 5053.50 0
2017-09-30 Perforation 5013.00 5013.50 6
2017-09-21 Multi-Stage Fracture 5683.00 5683.10 0
2017-09-30 Perforation 5000.00 5000.50 6
2017-09-30 Perforation 4987.00 4987.50 6
2017-09-30 Fracture 4987.00 5013.50 0
2017-09-30 Perforation 4973.00 4973.50 6
2017-09-30 Perforation 4960.00 4960.50 6
2017-09-30 Perforation 4947.00 4947.50 6
2017-09-30 Fracture 4947.00 4973.50 0
2017-09-30 Perforation 4933.00 4933.50 6
2017-09-30 Perforation 4920.00 4920.50 6
2017-09-30 Perforation 4907.00 4907.50 6
2017-09-21 Multi-Stage Fracture 5642.20 5642.30 0
2017-09-30 Fracture 4907.00 4933.50 0
2017-10-01 Perforation 4893.00 4893.50 6
2017-10-01 Perforation 4880.00 4880.50 6
2017-10-01 Perforation 4867.00 4867.50 6
2017-10-01 Fracture 4867.00 4893.50 0
2017-10-01 Perforation 4853.00 4853.50 6
2017-10-01 Perforation 4840.00 4840.50 6
2017-10-01 Perforation 4827.00 4827.50 6
2017-10-01 Fracture 4827.00 4853.50 0
2017-10-01 Perforation 4813.00 4813.50 6
2017-09-21 Multi-Stage Fracture 5600.70 5600.80 0
2017-10-01 Perforation 4800.00 4800.50 6
2017-10-01 Perforation 4787.00 4787.50 6
2017-10-01 Fracture 4787.00 4813.50 0
2017-10-02 Perforation 4772.50 4773.00 6
2017-10-02 Perforation 4760.00 4760.50 6
2017-10-02 Perforation 4747.00 4747.50 6
2017-10-02 Fracture 4747.00 4773.00 0
2017-10-02 Perforation 4733.00 4733.50 6
2017-10-02 Perforation 4720.00 4720.50 6
2017-10-02 Perforation 4708.00 4708.50 6
2017-09-21 Multi-Stage Fracture 5559.40 5559.50 0
2017-10-02 Fracture 4708.00 4733.50 0
2017-10-02 Perforation 4693.00 4693.50 6
2017-10-02 Perforation 4680.00 4680.50 6
2017-10-02 Perforation 4667.00 4667.50 6
2017-10-02 Fracture 4667.00 4693.50 0
2017-10-03 Perforation 4653.00 4653.50 6
2017-10-03 Perforation 4640.00 4640.50 6
2017-10-03 Perforation 4627.00 4627.50 6
2017-10-03 Fracture 4627.00 4653.50 0
2017-10-03 Perforation 4613.00 4613.50 6
2017-09-21 Multi-Stage Fracture 5518.20 5518.30 0
2017-10-03 Perforation 4600.00 4600.50 6
2017-10-03 Perforation 4587.00 4587.50 6
2017-10-03 Fracture 4587.00 4613.50 0
2017-10-03 Perforation 4573.00 4573.50 6
2017-10-03 Perforation 4560.00 4560.50 6
2017-10-03 Perforation 4547.00 4547.50 6
2017-10-03 Fracture 4547.00 4573.50 0
2017-10-03 Perforation 4534.00 4534.50 6
2017-10-03 Perforation 4521.00 4521.50 6
2017-10-03 Fracture 4521.00 4534.50 0
2017-09-21 Multi-Stage Fracture 5477.70 5477.80 0
2017-10-04 Perforation 4493.00 4493.50 6
2017-10-04 Perforation 4480.00 4480.50 6
2017-10-04 Perforation 4467.00 4467.50 6
2017-10-04 Fracture 4467.00 4493.50 0
2017-10-04 Perforation 4453.00 4453.50 6
2017-10-04 Perforation 4440.00 4440.50 6
2017-10-04 Perforation 4427.00 4427.50 6
2017-10-04 Fracture 4427.00 4453.50 0
2017-10-04 Perforation 4413.00 4413.50 6
2017-10-04 Perforation 4400.00 4400.50 6
2017-09-21 Multi-Stage Fracture 5436.80 5436.90 0
2017-10-04 Perforation 4387.00 4387.50 6
2017-10-04 Fracture 4387.00 4413.50 0
2017-10-05 Perforation 4373.00 4373.50 6
2017-10-05 Perforation 4360.00 4360.50 6
2017-10-05 Perforation 4347.00 4347.50 6
2017-10-05 Fracture 4347.00 4373.50 0
2017-10-08 Perforation 4333.00 4333.50 6
2017-10-08 Perforation 4320.00 4320.50 6
2017-10-08 Perforation 4307.00 4307.50 6
2017-10-08 Fracture 4307.00 4333.50 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-09-20 2017-10-23 2,780 51,841 N/A
2 2017-09-20 2017-09-20 2,780 0 N/A
3 2017-10-14 2017-10-16 2,780 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 87.1501 N/A
40/70 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 9.7892 N/A
50/140 Sand (Domestic) Calfrac Crystalline silica (Quartz) 14808-60-7 100 2.4467 N/A
15% HCl Calfrac Acid Hydrochloric acid 7647-01-0 100 0.4302 N/A
Water 7732-18-5 100 0.4302 N/A
DWP-944 Calfrac Bactericide/Biocide Acetamide. 2.2-dibromo-2-cyano 10222-01-2 100 0.0108 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0108 N/A
CI-9100G Calfrac Corrosion Inhibitor Alcohols. C12-15. ethoxylated 68131-39-5 100 0.0002 N/A
Cinnamaldehyde 104-55-2 100 0.0002 N/A
Dipropylene glycol monomethyl ether 34590-94-8 100 0.0002 N/A
Ethylene Glycol 107-21-1 100 0.0002 N/A
Formic acid 64-18-6 100 0.0002 N/A
Isopropyl alcohol 67-63-0 100 0.0002 N/A
Tar bases. quinoline derivs. 68513-87-1 100 0.0002 N/A
Tar bases. quinolone derivs.. benzyl chloride-quarternized 72480-70-7 100 0.0002 N/A
DWP-959 Calfrac Demulsifier Methanol 67-56-1 100 0.0811 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0811 N/A
CalVisc Calfrac Friction Reducer Non-Hazardous Ingredients Trade Secret 100 0.0913 N/A
2 DWP-690 Calfrac Breaker Hydrogen peroxide 7722-84-1 100 0.0022 N/A
Water 7732-18-5 100 0.0022 N/A
3 CalSurf 9400 Calfrac Well Services Surfactant Ethoxylated Alcohols Trade Secret 100 0.0793 N/A
Methanol 67-56-1 100 0.0793 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0793 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-09-23 2017-10-23 Surface Water - River 28649
2017-09-23 2017-10-23 Surface Water - River 21651
2017-09-23 2017-10-23 Oilfield Produced Water 2809

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 702 0.0 0.0 0.0
2018 5836 0.0 0.0 0.0
2019 8508 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-05-17 No Incident Encountered 0.00 0.00
2017-12-11 No Incident Encountered 0.00 0.00

For data sources see[10]

References