X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0656061416020

Well Details

Well ID: 0656061416020
Loading map...
Location: 02/16-14-065-06W6/0
Location Alias: 02/16-14-65-06 W6M
Location Alias 2: 02/16-14-065-06 W6/00
Country: Canada
Province: Alberta
Township: 065
Meridian: 6
Range: 06
Section: 14
County/Municipality: Municipal District of Greenview No. 16
Well Name: PARA HZ 102 WAPITI 16-14-65-6
Operator Name: Paramount Resources Ltd.
License Number: 0480432
License Date: 2016-09-23
License Status: Amended
Spud Date: 2017-03-01
Final Drill Date: 2017-04-28
Well Total Depth: 6275.00 m
Surface Hole Latitude: 54.602751
Surface Hole Longitude: -118.792047

For data sources see[1][2]

Well History

Date Event
2016-09-23 Obtained License
2017-03-01 Lost Circulation Occurred
2017-03-04 Direction Drilling Operation Performed - Deviate
2017-03-04 Surface Casing Operation Performed
2017-04-11 Intermediate Casing Operation Performed
2017-04-14 Direction Drilling Operation Performed - Horizontal
2017-04-15 Well Log Performed
2017-04-28 Finished Drilling
2017-04-28 Well Mode changed to Drilled and Cased
2017-04-29 Well Log Performed
2017-05-04 Production Casing Operation Performed
2017-05-05 Rig Released
2017-07-05 Perforation Treatment Performed - Multi-Stage Fracture
2017-07-06 Perforation Treatment Performed - Jet Perforation
2017-07-07 Perforation Treatment Performed - Multi-Stage Fracture
2017-07-09 Perforation Treatment Performed - Jet Perforation
2017-07-09 Perforation Treatment Performed - Multi-Stage Fracture
2017-07-10 Perforation Treatment Performed - Jet Perforation
2017-07-10 Perforation Treatment Performed - Multi-Stage Fracture
2017-07-11 Perforation Treatment Performed - Jet Perforation
2017-07-11 Perforation Treatment Performed - Multi-Stage Fracture
2017-07-12 Perforation Treatment Performed - Jet Perforation
2017-07-12 Perforation Treatment Performed - Multi-Stage Fracture
2017-07-13 Perforation Treatment Performed - Jet Perforation
2017-07-13 Perforation Treatment Performed - Multi-Stage Fracture
2017-07-14 Perforation Treatment Performed - Jet Perforation
2017-07-14 Perforation Treatment Performed - Multi-Stage Fracture
2017-07-15 Perforation Treatment Performed - Jet Perforation
2017-07-15 Perforation Treatment Performed - Multi-Stage Fracture
2017-07-16 Perforation Treatment Performed - Jet Perforation
2017-07-16 Perforation Treatment Performed - Multi-Stage Fracture
2017-07-17 Perforation Treatment Performed - Jet Perforation
2017-07-17 Perforation Treatment Performed - Multi-Stage Fracture
2017-07-18 Perforation Treatment Performed - Jet Perforation
2017-07-18 Perforation Treatment Performed - Multi-Stage Fracture
2017-07-19 Perforation Treatment Performed - Jet Perforation
2017-07-19 Perforation Treatment Performed - Multi-Stage Fracture
2017-07-20 Perforation Treatment Performed - Jet Perforation
2017-07-20 Perforation Treatment Performed - Multi-Stage Fracture
2017-07-21 Perforation Treatment Performed - Jet Perforation
2017-07-21 Perforation Treatment Performed - Multi-Stage Fracture
2017-07-22 Perforation Treatment Performed - Jet Perforation
2017-07-22 Perforation Treatment Performed - Multi-Stage Fracture
2017-07-23 Perforation Treatment Performed - Jet Perforation
2017-07-23 Perforation Treatment Performed - Multi-Stage Fracture
2017-07-24 Perforation Treatment Performed - Jet Perforation
2017-07-24 Perforation Treatment Performed - Multi-Stage Fracture
2017-07-25 Perforation Treatment Performed - Jet Perforation
2017-07-25 Perforation Treatment Performed - Multi-Stage Fracture
2017-07-26 Perforation Treatment Performed - Jet Perforation
2017-07-26 Perforation Treatment Performed - Multi-Stage Fracture
2017-07-27 Perforation Treatment Performed - Jet Perforation
2017-07-27 Perforation Treatment Performed - Multi-Stage Fracture
2017-07-28 Perforation Treatment Performed - Jet Perforation
2017-07-28 Perforation Treatment Performed - Multi-Stage Fracture
2017-08-30 Well Began Production
2017-08-30 Well Fluid changed to Gas
2017-08-30 Well Mode changed to Flowing
2017-09-29 Well Log Performed
2018-07-01 Well Fluid changed to Gas
2018-07-01 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-03-01 Fox Drilling Inc. 7 N/A Set Surface

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-03-04 567.30 Deviate (5 - 79 degrees)
2017-04-14 3299.30 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-07-05 Multi-Stage Fracture 6111.60 6111.70 0
2017-07-05 Multi-Stage Fracture 5749.60 5749.70 0
2017-07-16 Perforation 4894.50 4895.00 20
2017-07-16 Perforation 4884.50 4885.00 20
2017-07-16 Perforation 4874.50 4875.00 20
2017-07-16 Perforation 4863.50 4864.00 20
2017-07-16 Multi-Stage Fracture 4863.50 4895.00 0
2017-07-16 Perforation 4854.50 4855.00 20
2017-07-16 Perforation 4844.50 4845.00 20
2017-07-16 Perforation 4834.50 4835.00 20
2017-07-16 Perforation 4824.50 4825.00 20
2017-07-16 Multi-Stage Fracture 4824.50 4855.00 0
2017-07-05 Multi-Stage Fracture 5709.90 5710.00 0
2017-07-16 Perforation 4814.50 4815.00 20
2017-07-16 Perforation 4804.50 4805.00 20
2017-07-16 Perforation 4794.50 4795.00 20
2017-07-16 Perforation 4784.50 4785.00 20
2017-07-16 Multi-Stage Fracture 4784.50 4815.00 0
2017-07-17 Perforation 4774.50 4775.00 20
2017-07-17 Perforation 4764.50 4765.00 20
2017-07-17 Perforation 4754.50 4755.00 20
2017-07-17 Perforation 4744.50 4745.00 20
2017-07-17 Multi-Stage Fracture 4744.50 4775.00 0
2017-07-05 Multi-Stage Fracture 5669.90 5670.00 0
2017-07-17 Perforation 4734.50 4735.00 20
2017-07-17 Perforation 4724.50 4725.00 20
2017-07-17 Perforation 4714.50 4715.00 20
2017-07-17 Perforation 4704.50 4705.00 20
2017-07-17 Multi-Stage Fracture 4704.50 4735.00 0
2017-07-18 Perforation 4694.50 4695.00 20
2017-07-18 Perforation 4684.50 4685.00 20
2017-07-18 Perforation 4673.50 4674.00 20
2017-07-18 Perforation 4664.50 4665.00 20
2017-07-18 Multi-Stage Fracture 4664.50 4695.00 0
2017-07-05 Multi-Stage Fracture 5629.20 5629.30 0
2017-07-18 Perforation 4654.50 4655.00 20
2017-07-18 Perforation 4644.50 4645.00 20
2017-07-18 Perforation 4633.50 4634.00 20
2017-07-18 Perforation 4624.50 4625.00 20
2017-07-18 Multi-Stage Fracture 4624.50 4655.00 0
2017-07-18 Perforation 4614.50 4615.00 20
2017-07-18 Perforation 4604.50 4605.00 20
2017-07-18 Perforation 4594.50 4595.00 20
2017-07-18 Perforation 4584.50 4585.00 20
2017-07-18 Multi-Stage Fracture 4584.50 4615.00 0
2017-07-05 Multi-Stage Fracture 5588.60 5588.70 0
2017-07-18 Perforation 4574.50 4575.00 20
2017-07-18 Perforation 4564.50 4565.00 20
2017-07-18 Perforation 4554.50 4555.00 20
2017-07-18 Perforation 4544.50 4545.00 20
2017-07-19 Multi-Stage Fracture 4544.50 4575.00 0
2017-07-19 Perforation 4534.50 4535.00 20
2017-07-19 Perforation 4524.50 4525.00 20
2017-07-19 Perforation 4514.50 4515.00 20
2017-07-19 Perforation 4504.50 4505.00 20
2017-07-19 Multi-Stage Fracture 4504.50 4535.00 0
2017-07-06 Perforation 5574.50 5575.00 20
2017-07-19 Perforation 4494.50 4495.00 20
2017-07-19 Perforation 4483.50 4484.00 20
2017-07-19 Perforation 4474.50 4475.00 20
2017-07-19 Perforation 4464.50 4465.00 20
2017-07-19 Multi-Stage Fracture 4464.50 4495.00 0
2017-07-19 Perforation 4454.50 4455.00 20
2017-07-19 Perforation 4444.50 4445.00 20
2017-07-19 Perforation 4434.50 4435.00 20
2017-07-19 Perforation 4424.50 4425.00 20
2017-07-20 Multi-Stage Fracture 4424.50 4455.00 0
2017-07-06 Perforation 5564.00 5564.50 20
2017-07-20 Perforation 4414.50 4415.00 20
2017-07-20 Perforation 4404.50 4405.00 20
2017-07-20 Perforation 4394.50 4395.00 20
2017-07-20 Perforation 4384.50 4385.00 20
2017-07-20 Multi-Stage Fracture 4384.50 4415.00 0
2017-07-20 Perforation 4374.50 4375.00 20
2017-07-20 Perforation 4364.50 4365.00 20
2017-07-20 Perforation 4354.50 4355.00 20
2017-07-20 Perforation 4344.50 4345.00 20
2017-07-20 Multi-Stage Fracture 4344.50 4375.00 0
2017-07-06 Perforation 5553.50 5554.00 20
2017-07-21 Perforation 4334.50 4335.00 20
2017-07-21 Perforation 4324.50 4325.00 20
2017-07-21 Perforation 4314.50 4315.00 20
2017-07-21 Perforation 4304.50 4305.00 20
2017-07-21 Multi-Stage Fracture 4304.50 4335.00 0
2017-07-21 Perforation 4294.50 4295.00 20
2017-07-21 Perforation 4284.50 4285.00 20
2017-07-21 Perforation 4274.50 4275.00 20
2017-07-21 Perforation 4264.50 4265.00 20
2017-07-21 Multi-Stage Fracture 4264.50 4295.00 0
2017-07-06 Perforation 5543.00 5543.50 20
2017-07-21 Perforation 4254.50 4255.00 20
2017-07-21 Perforation 4244.50 4245.00 20
2017-07-21 Perforation 4234.50 4235.00 20
2017-07-21 Perforation 4224.50 4225.00 20
2017-07-21 Multi-Stage Fracture 4224.50 4255.00 0
2017-07-21 Perforation 4214.50 4215.00 20
2017-07-21 Perforation 4204.50 4205.00 20
2017-07-21 Perforation 4193.50 4194.00 20
2017-07-22 Multi-Stage Fracture 4193.50 4215.00 0
2017-07-22 Perforation 4174.50 4175.00 20
2017-07-07 Multi-Stage Fracture 5543.00 5575.00 0
2017-07-22 Perforation 4164.50 4165.00 20
2017-07-22 Perforation 4154.50 4155.00 20
2017-07-22 Perforation 4144.50 4145.00 20
2017-07-22 Multi-Stage Fracture 4144.50 4175.00 0
2017-07-22 Perforation 4133.50 4134.00 20
2017-07-22 Perforation 4124.50 4125.00 20
2017-07-22 Perforation 4114.50 4115.00 20
2017-07-22 Perforation 4104.50 4105.00 20
2017-07-22 Multi-Stage Fracture 4104.50 4134.00 0
2017-07-22 Perforation 4094.50 4095.00 20
2017-07-05 Multi-Stage Fracture 6071.20 6071.30 0
2017-07-09 Perforation 5534.50 5535.00 20
2017-07-22 Perforation 4085.50 4086.00 20
2017-07-22 Perforation 4074.50 4075.00 20
2017-07-22 Perforation 4064.50 4065.00 20
2017-07-23 Multi-Stage Fracture 4064.50 4095.00 0
2017-07-23 Perforation 4054.50 4055.00 20
2017-07-23 Perforation 4044.50 4045.00 20
2017-07-23 Perforation 4034.50 4035.00 20
2017-07-23 Perforation 4024.50 4025.00 20
2017-07-23 Multi-Stage Fracture 4024.50 4055.00 0
2017-07-23 Perforation 4014.50 4015.00 20
2017-07-09 Perforation 5524.50 5525.00 20
2017-07-23 Perforation 4004.50 4005.00 20
2017-07-23 Perforation 3994.50 3995.00 20
2017-07-23 Perforation 3984.50 3985.00 20
2017-07-23 Multi-Stage Fracture 3984.50 4015.00 0
2017-07-23 Perforation 3974.50 3975.00 20
2017-07-23 Perforation 3964.50 3965.00 20
2017-07-23 Perforation 3954.50 3955.00 20
2017-07-23 Perforation 3945.50 3946.00 20
2017-07-23 Multi-Stage Fracture 3945.50 3975.00 0
2017-07-23 Perforation 3934.50 3935.00 20
2017-07-09 Perforation 5514.50 5515.00 20
2017-07-23 Perforation 3924.50 3925.00 20
2017-07-23 Perforation 3914.50 3915.00 20
2017-07-23 Perforation 3904.50 3905.00 20
2017-07-24 Multi-Stage Fracture 3904.50 3935.00 0
2017-07-24 Perforation 3894.50 3895.00 20
2017-07-24 Perforation 3884.50 3885.00 20
2017-07-24 Perforation 3874.50 3875.00 20
2017-07-24 Perforation 3864.50 3865.00 20
2017-07-24 Multi-Stage Fracture 3864.50 3895.00 0
2017-07-24 Perforation 3854.50 3855.00 20
2017-07-09 Perforation 5504.50 5505.00 20
2017-07-24 Perforation 3844.50 3845.00 20
2017-07-24 Perforation 3834.50 3835.00 20
2017-07-24 Perforation 3824.50 3825.00 20
2017-07-24 Multi-Stage Fracture 3824.50 3855.00 0
2017-07-24 Perforation 3814.50 3815.00 20
2017-07-24 Perforation 3803.50 3804.00 20
2017-07-24 Perforation 3794.50 3795.00 20
2017-07-24 Perforation 3784.50 3785.00 20
2017-07-24 Multi-Stage Fracture 3784.50 3815.00 0
2017-07-25 Perforation 3774.50 3775.00 20
2017-07-09 Multi-Stage Fracture 5504.50 5535.00 0
2017-07-25 Perforation 3764.50 3765.00 20
2017-07-25 Perforation 3753.50 3754.00 20
2017-07-25 Perforation 3744.50 3745.00 20
2017-07-25 Multi-Stage Fracture 3744.50 3775.00 0
2017-07-25 Perforation 3734.50 3735.00 20
2017-07-25 Perforation 3724.50 3725.00 20
2017-07-25 Perforation 3714.50 3715.00 20
2017-07-25 Perforation 3706.50 3707.00 20
2017-07-25 Multi-Stage Fracture 3706.50 3735.00 0
2017-07-25 Perforation 3694.50 3695.00 20
2017-07-09 Perforation 5495.00 5495.50 20
2017-07-25 Perforation 3684.50 3685.00 20
2017-07-25 Perforation 3674.50 3675.00 20
2017-07-25 Perforation 3664.50 3665.00 20
2017-07-25 Multi-Stage Fracture 3664.50 3695.00 0
2017-07-26 Perforation 3654.50 3655.00 20
2017-07-26 Perforation 3644.50 3645.00 20
2017-07-26 Perforation 3634.50 3635.00 20
2017-07-26 Perforation 3624.50 3625.00 20
2017-07-26 Multi-Stage Fracture 3624.50 3655.00 0
2017-07-26 Perforation 3614.50 3615.00 20
2017-07-09 Perforation 5485.00 5485.50 20
2017-07-26 Perforation 3604.50 3605.00 20
2017-07-26 Perforation 3594.50 3595.00 20
2017-07-26 Perforation 3584.50 3585.00 20
2017-07-26 Multi-Stage Fracture 3584.50 3615.00 0
2017-07-26 Perforation 3574.50 3575.00 20
2017-07-26 Perforation 3564.50 3565.00 20
2017-07-26 Perforation 3554.50 3555.00 20
2017-07-26 Perforation 3544.50 3545.00 20
2017-07-27 Multi-Stage Fracture 3544.50 3575.00 0
2017-07-27 Perforation 3534.50 3535.00 20
2017-07-09 Perforation 5475.00 5475.50 20
2017-07-27 Perforation 3524.50 3525.00 20
2017-07-27 Perforation 3514.50 3515.00 20
2017-07-27 Perforation 3504.50 3505.00 20
2017-07-27 Multi-Stage Fracture 3504.50 3535.00 0
2017-07-27 Perforation 3494.50 3495.00 20
2017-07-27 Perforation 3484.50 3485.00 20
2017-07-27 Perforation 3474.50 3475.00 20
2017-07-27 Perforation 3465.50 3466.00 20
2017-07-27 Multi-Stage Fracture 3465.50 3495.00 0
2017-07-27 Perforation 3454.50 3455.00 20
2017-07-09 Perforation 5464.50 5465.00 20
2017-07-27 Perforation 3444.50 3445.00 20
2017-07-27 Perforation 3434.50 3435.00 20
2017-07-27 Perforation 3424.50 3425.00 20
2017-07-28 Multi-Stage Fracture 3424.50 3455.00 0
2017-07-28 Perforation 3413.50 3414.00 20
2017-07-28 Perforation 3404.50 3405.00 20
2017-07-28 Perforation 3394.50 3395.00 20
2017-07-28 Perforation 3384.50 3385.00 20
2017-07-28 Multi-Stage Fracture 3384.50 3414.00 0
2017-07-28 Perforation 3374.50 3375.00 20
2017-07-09 Multi-Stage Fracture 5464.50 5495.50 0
2017-07-28 Perforation 3365.50 3366.00 20
2017-07-28 Perforation 3354.50 3355.00 20
2017-07-28 Perforation 3344.50 3345.00 20
2017-07-28 Multi-Stage Fracture 3344.50 3375.00 0
2017-07-28 Perforation 3334.50 3335.00 20
2017-07-28 Perforation 3324.50 3325.00 20
2017-07-28 Perforation 3314.50 3315.00 20
2017-07-28 Perforation 3304.50 3305.00 20
2017-07-28 Multi-Stage Fracture 3304.50 3335.00 0
2017-07-05 Multi-Stage Fracture 6031.00 6031.10 0
2017-07-10 Perforation 5454.50 5455.00 20
2017-07-10 Perforation 5444.50 5445.00 20
2017-07-10 Perforation 5434.50 5435.00 20
2017-07-10 Perforation 5424.50 5425.00 20
2017-07-10 Multi-Stage Fracture 5424.50 5455.00 0
2017-07-10 Perforation 5414.50 5415.00 20
2017-07-10 Perforation 5404.50 5405.00 20
2017-07-10 Perforation 5394.50 5395.00 20
2017-07-10 Perforation 5383.50 5384.00 20
2017-07-11 Multi-Stage Fracture 5383.50 5415.00 0
2017-07-05 Multi-Stage Fracture 5990.90 5991.00 0
2017-07-11 Perforation 5374.50 5375.00 20
2017-07-11 Perforation 5364.50 5365.00 20
2017-07-11 Perforation 5353.50 5354.00 20
2017-07-11 Perforation 5344.50 5345.00 20
2017-07-11 Multi-Stage Fracture 5344.50 5375.00 0
2017-07-11 Perforation 5334.50 5335.00 20
2017-07-11 Perforation 5324.50 5325.00 20
2017-07-11 Perforation 5314.50 5315.00 20
2017-07-11 Perforation 5304.50 5305.00 20
2017-07-12 Multi-Stage Fracture 5304.50 5335.00 0
2017-07-05 Multi-Stage Fracture 5950.80 5950.90 0
2017-07-12 Perforation 5294.50 5295.00 20
2017-07-12 Perforation 5285.50 5286.00 20
2017-07-12 Perforation 5274.50 5275.00 20
2017-07-12 Perforation 5264.50 5265.00 20
2017-07-12 Multi-Stage Fracture 5264.50 5295.00 0
2017-07-12 Perforation 5254.50 5255.00 20
2017-07-12 Perforation 5245.50 5246.00 20
2017-07-12 Perforation 5234.50 5235.00 20
2017-07-12 Perforation 5224.50 5225.00 20
2017-07-12 Multi-Stage Fracture 5224.50 5255.00 0
2017-07-05 Multi-Stage Fracture 5910.70 5910.80 0
2017-07-12 Perforation 5214.50 5215.00 20
2017-07-12 Perforation 5205.50 5206.00 20
2017-07-12 Perforation 5194.50 5195.00 20
2017-07-12 Perforation 5184.50 5185.00 20
2017-07-13 Multi-Stage Fracture 5184.50 5215.00 0
2017-07-13 Perforation 5174.50 5175.00 20
2017-07-13 Perforation 5164.50 5165.00 20
2017-07-13 Perforation 5154.50 5155.00 20
2017-07-13 Perforation 5144.50 5145.00 20
2017-07-13 Multi-Stage Fracture 5144.50 5175.00 0
2017-07-05 Multi-Stage Fracture 5870.50 5870.60 0
2017-07-13 Perforation 5134.50 5135.00 20
2017-07-13 Perforation 5124.50 5125.00 20
2017-07-13 Perforation 5114.50 5115.00 20
2017-07-13 Perforation 5104.50 5105.00 20
2017-07-13 Multi-Stage Fracture 5104.50 5135.00 0
2017-07-14 Perforation 5094.50 5095.00 20
2017-07-14 Perforation 5084.50 5085.00 20
2017-07-14 Perforation 5074.50 5075.00 20
2017-07-14 Perforation 5064.50 5065.00 20
2017-07-14 Multi-Stage Fracture 5064.50 5095.00 0
2017-07-05 Multi-Stage Fracture 5829.90 5830.00 0
2017-07-14 Perforation 5054.50 5055.00 20
2017-07-14 Perforation 5044.50 5045.00 20
2017-07-14 Perforation 5034.50 5035.00 20
2017-07-14 Perforation 5024.50 5025.00 20
2017-07-14 Multi-Stage Fracture 5024.50 5055.00 0
2017-07-14 Perforation 5014.50 5015.00 20
2017-07-14 Perforation 5004.50 5005.00 20
2017-07-14 Perforation 4994.50 4995.00 20
2017-07-14 Perforation 4984.50 4985.00 20
2017-07-14 Multi-Stage Fracture 4984.50 5015.00 0
2017-07-05 Multi-Stage Fracture 5789.70 5789.80 0
2017-07-15 Perforation 4974.50 4975.00 20
2017-07-15 Perforation 4964.50 4965.00 20
2017-07-15 Perforation 4954.50 4955.00 20
2017-07-15 Perforation 4944.50 4945.00 20
2017-07-15 Multi-Stage Fracture 4944.50 4975.00 0
2017-07-15 Perforation 4934.50 4935.00 20
2017-07-15 Perforation 4924.50 4925.00 20
2017-07-15 Perforation 4914.50 4915.00 20
2017-07-15 Perforation 4904.50 4905.00 20
2017-07-15 Multi-Stage Fracture 4904.50 4935.00 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-07-05 2017-07-28 3,136 41,782 N/A
2 2017-07-05 2017-07-05 3,136 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 84.9795 N/A
40/70 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 14.5516 N/A
15% HCl Calfrac Acid Hydrochloric acid 7647-01-0 100 0.3269 N/A
Water 7732-18-5 100 0.3269 N/A
DWP-944 Calfrac Bactericide/Biocide Acetamide. 2.2-dibromo-2-cyano 10222-01-2 100 0.0114 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0114 N/A
DWP-913 Calfrac Clay Control Non-Hazardous Ingredients Trade Secret 100 0.0403 N/A
CI-9100G Calfrac Corrosion Inhibitor Alcohols. C12-15. ethoxylated 68131-39-5 100 0.0001 N/A
Cinnamaldehyde 104-55-2 100 0.0001 N/A
Dipropylene glycol monomethyl ether 34590-94-8 100 0.0001 N/A
Ethylene Glycol 107-21-1 100 0.0001 N/A
Formic acid 64-18-6 100 0.0001 N/A
Isopropyl alcohol 67-63-0 100 0.0001 N/A
Tar bases. quinoline derivs. 68513-87-1 100 0.0001 N/A
Tar bases. quinolone derivs.. benzyl chloride-quarternized 72480-70-7 100 0.0001 N/A
CalVisc Calfrac Friction Reducer Non-Hazardous Ingredients Trade Secret 100 0.0865 N/A
2 Nitrogen Calfrac Energizing Fluid Nitrogen 7727-37-9 100 0.0166 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-04-04 2017-06-14 Surface Water - River 43428

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 2441 0.0 0.0 0.0
2018 7708 0.0 0.0 0.0
2019 7159 0.0 0.0 0.0
2020 1463 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-03-01 Lost Circulation 35.00 171.00
2017-07-28 No Incident Encountered 0.00 0.00

For data sources see[10]

References