X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0664182708002

Well Details

Well ID: 0664182708002
Loading map...
Location: 00/08-27-066-18W4/2
Location Alias: 00/08-27-66-18 W4M
Location Alias 2: 00/08-27-066-18 W4/02
Country: Canada
Province: Alberta
Township: 066
Meridian: 4
Range: 18
Section: 27
County/Municipality: Athabasca County
Well Name: CNRL PRECAM ATMORE 8-27-66-18
Operator Name: Canadian Natural Resources Limited
License Number: 0097375
License Date: 1982-09-10
License Status: RecCertified
Spud Date: 1982-09-14
Final Drill Date: 1982-09-17
Well Total Depth: 563.60 m
Surface Hole Latitude: 54.737397
Surface Hole Longitude: -112.628235

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1982-09-10 Obtained License
1982-09-17 Finished Drilling
1982-09-17 Lost Circulation Occurred
1982-09-18 Production Casing Operation Performed
1982-10-20 Perforation Treatment Performed - Jet Perforation
1982-10-22 Perforation Treatment Performed - Casing Patch (Over Perfs)
1982-10-22 Perforation Treatment Performed - Jet Perforation
1982-10-24 Perforation Treatment Performed - Casing Patch (Over Perfs)
1982-10-27 Perforation Treatment Performed - Open-Hole Completion
1982-10-28 Perforation Treatment Performed - Jet Perforation
1982-11-13 Well Mode changed to Drilled and Cased
1984-09-05 Well Began Production
1984-09-05 Well Fluid changed to Gas
1984-09-05 Well Mode changed to Flowing
1988-03-02 Well Log Performed
1988-03-03 Perforation Treatment Performed - Casing Patch (Over Perfs)
1988-03-03 Well Fluid changed to Gas
1988-03-03 Well Mode changed to Abandoned Zone
1988-03-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1988-03-04 Perforation Treatment Performed - Jet Perforation
1988-03-04 Plug Back Performed
1988-03-24 Well Log Performed
1988-03-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1988-03-25 Perforation Treatment Performed - Jet Perforation
1988-03-25 Plug Back Performed
1989-12-12 Well Log Performed
1989-12-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-12-13 Plug Back Performed
1989-12-15 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1982-10-20 Perforation 512.20 512.70 13
1988-03-03 Casing Patch 416.00 420.70 0
1988-03-04 Packing Device Capped w/Cement 533.00 541.00 0
1988-03-04 Perforation 512.20 513.20 13
1988-03-25 Packing Device Capped w/Cement 499.00 507.00 0
1988-03-25 Perforation 487.00 489.00 13
1989-12-13 Packing Device Capped w/Cement 468.00 476.00 0
1982-10-22 Casing Patch 512.20 512.70 0
1982-10-22 Perforation 481.50 483.50 13
1982-10-22 Perforation 487.00 488.20 13
1982-10-24 Casing Patch 487.00 488.20 0
1982-10-24 Casing Patch 481.50 483.50 0
1982-10-27 Open Hole/Barefoot Completion 558.00 563.60 0
1982-10-28 Perforation 419.50 420.70 13
1982-10-28 Perforation 416.00 417.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 2194 0.0 0.0 0.0
1985 7601 0.0 0.0 0.0
1986 7087 0.0 0.0 0.0
1987 4787 0.0 0.0 0.0
1988 945 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1982-09-17 Lost Circulation 561.00 561.00

For data sources see[6]

References