X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0664200311002

Well Details

Well ID: 0664200311002
Loading map...
Location: 00/11-03-066-20W4/2
Location Alias: 00/11-03-66-20 W4M
Location Alias 2: 00/11-03-066-20 W4/02
Country: Canada
Province: Alberta
Township: 066
Meridian: 4
Range: 20
Section: 03
County/Municipality: Athabasca County
Well Name: CNRL UNIT FLAT 11-3-66-20
Operator Name: Canadian Natural Resources Limited
License Number: 0010667
License Date: 1955-12-20
License Status: RecCertified
Spud Date: 1955-12-23
Final Drill Date: 1956-01-12
Well Total Depth: 746.80 m
Surface Hole Latitude: 54.683688
Surface Hole Longitude: -112.945161

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1955-12-20 Obtained License
1955-12-28 Drill Stem Test Performed
1955-12-29 Drill Stem Test Performed
1955-12-30 Drill Stem Test Performed
1956-01-05 Drill Stem Test Performed
1956-01-06 Drill Stem Test Performed
1956-01-07 Production Casing Operation Performed
1956-01-12 Drill Stem Test Performed
1956-01-12 Finished Drilling
1956-01-12 Well Mode changed to Drilled and Cased
1993-10-14 Well Log Performed
1993-11-10 Well Log Performed
1993-11-16 Perforation Treatment Performed - Jet Perforation
1993-11-16 Well Log Performed
1997-02-20 Perforation Treatment Performed - Jet Perforation
1997-02-20 Well Log Performed
1997-02-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-02-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-02-21 Well Log Performed
1997-02-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-02-24 Well Log Performed
1997-02-25 Perforation Treatment Performed - Jet Perforation
1997-02-25 Well Log Performed
1997-02-26 Perforation Treatment Performed - Jet Perforation
1997-02-26 Well Log Performed
1997-07-25 Well Began Production
1997-07-25 Well Fluid changed to Gas
1997-07-25 Well Mode changed to Flowing
2001-10-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-10-02 Perforation Treatment Performed - Jet Perforation
2001-10-02 Plug Back Performed
2001-10-02 Well Log Performed
2003-08-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-08-03 Plug Back Performed
2003-08-05 Well Log Performed
2003-08-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-08-06 Perforation Treatment Performed - Jet Perforation
2003-08-06 Plug Back Performed
2003-08-06 Well Fluid changed to Gas
2003-08-06 Well Log Performed
2003-08-06 Well Mode changed to Abandoned Zone
2003-08-07 Perforation Treatment Performed - Cement Plug
2003-08-07 Perforation Treatment Performed - Remedial Casing
2003-08-27 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1993-11-16 Perforation 568.30 571.30 13
2001-10-02 Perforation 457.30 458.30 17
2003-08-03 Packing Device Capped w/Cement 433.50 441.50 0
2003-08-03 Packing Device Capped w/Cement 447.00 455.00 0
2003-08-06 Packing Device Capped w/Cement 417.00 425.00 0
2003-08-06 Perforation 227.00 230.00 17
2003-08-07 Remedial Casing Cementing 227.00 230.00 0
2003-08-07 Cement Plug 106.00 230.00 0
1997-02-20 Perforation 596.20 596.70 13
1997-02-21 Packing Device Capped w/Cement 584.00 592.00 0
1997-02-21 Acid Treatment 568.30 571.30 0
1997-02-24 Packing Device Capped w/Cement 562.00 566.00 0
1997-02-25 Perforation 557.00 559.00 14
1997-02-26 Perforation 428.50 431.50 14
1997-02-26 Perforation 444.80 446.20 14
2001-10-02 Packing Device Capped w/Cement 547.00 555.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 3495 0.0 0.0 0.0
1998 7154 0.0 0.0 0.0
1999 6660 0.0 0.0 0.0
2000 79 0.0 0.0 0.0

For data sources see[5]

References