X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0664201507000

Well Details

Well ID: 0664201507000
Loading map...
Location: 00/07-15-066-20W4/0
Location Alias: 00/07-15-66-20 W4M
Location Alias 2: 00/07-15-066-20 W4/00
Country: Canada
Province: Alberta
Township: 066
Meridian: 4
Range: 20
Section: 15
County/Municipality: Athabasca County
Well Name: CNRL UNIT FLAT 7-15-66-20
Operator Name: Canadian Natural Resources Limited
License Number: 0029161
License Date: 1965-10-15
License Status: Abandoned
Spud Date: 1965-10-16
Final Drill Date: 1965-10-19
Well Total Depth: 623.90 m
Surface Hole Latitude: 54.709184
Surface Hole Longitude: -112.938998

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1965-10-15 Obtained License
1965-10-19 Finished Drilling
1965-10-20 Drill Stem Test Performed
1965-10-21 Drill Stem Test Performed
1965-10-21 Production Casing Operation Performed
1965-11-23 Well Mode changed to Drilled and Cased
1968-05-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-05-27 Perforation Treatment Performed - Selective Jet Perforations
1969-12-05 Well Began Production
1969-12-05 Well Fluid changed to Gas
1969-12-05 Well Mode changed to Flowing
1994-12-02 Perforation Treatment Performed - Chemical Squeeze
1995-01-31 Perforation Treatment Performed - Chemical Squeeze
1995-01-31 Well Log Performed
1996-07-01 Well Fluid changed to Gas
1996-07-01 Well Mode changed to Suspended
1997-07-22 Perforation Treatment Performed - Jet Perforation
1997-07-22 Well Log Performed
1997-07-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-10-09 Well Log Performed
1999-12-16 Perforation Treatment Performed - Jet Perforation
2010-07-28 Well Log Performed
2010-08-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-08-05 Perforation Treatment Performed - Cement Squeeze
2010-08-05 Plug Back Performed
2010-08-05 Well Fluid changed to Gas
2010-08-05 Well Mode changed to Abandoned Zone
2010-11-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-11-07 Perforation Treatment Performed - Jet Perforation
2010-11-07 Perforation Treatment Performed - Remedial Casing
2010-11-07 Well Log Performed
2011-07-21 Perforation Treatment Performed - Jet Perforation
2011-07-24 Well Log Performed
2011-07-25 Perforation Treatment Performed - Jet Perforation
2011-07-25 Well Log Performed
2011-07-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-07-27 Perforation Treatment Performed - Remedial Casing
2012-08-27 Perforation Treatment Performed - Jet Perforation
2012-08-28 Well Log Performed
2012-09-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-09-05 Perforation Treatment Performed - Remedial Casing
2012-09-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-09-15 Well Abandoned
2012-09-15 Well Fluid changed to Gas
2012-09-15 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1968-05-27 Selective Jet Perforations 552.70 555.80 0
2010-08-05 Cement Squeeze 550.30 555.80 0
2010-08-05 Packing Device Capped w/Cement 536.00 544.00 0
2010-08-05 Packing Device Capped w/Cement 208.50 220.00 0
2010-11-07 Perforation 200.00 203.00 13
2010-11-07 Remedial Casing Cementing 200.00 203.00 0
2010-11-07 Packing Device Capped w/Cement 187.00 195.00 0
2011-07-21 Perforation 200.00 203.00 13
2011-07-25 Perforation 198.00 201.00 13
2011-07-27 Remedial Casing Cementing 198.00 203.00 0
2011-07-27 Packing Device Capped w/Cement 185.00 193.00 0
1968-05-27 Acid Treatment 552.70 555.80 0
2012-08-27 Perforation 198.00 203.00 13
2012-09-04 Packing Device Capped w/Cement 212.00 220.00 0
2012-09-05 Remedial Casing Cementing 198.00 203.00 0
2012-09-15 Packing Device Capped w/Cement 188.00 196.00 0
1994-12-02 Chemical Squeeze 552.70 555.80 0
1995-01-31 Chemical Squeeze 552.70 555.80 0
1997-07-22 Perforation 558.50 561.00 18
1997-07-22 Perforation 563.00 566.00 18
1997-07-22 Perforation 568.50 569.50 18
1997-07-26 Acid Treatment 558.50 569.50 0
1999-12-16 Perforation 550.30 556.80 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1969 624 0.0 0.0 0.0
1970 8199 0.0 0.0 0.0
1971 8671 0.0 0.0 0.0
1972 8783 0.0 0.0 0.0
1973 8366 0.0 0.0 0.0
1974 8700 0.0 0.0 0.0
1975 8694 0.0 0.0 0.0
1976 6388 0.0 0.0 0.0
1977 6993 0.0 0.0 0.0
1978 8363 0.0 0.0 0.0
1979 7465 0.0 0.0 0.0
1980 5877 0.0 0.0 0.0
1981 4915 0.0 0.0 0.0
1982 3324 0.0 0.0 0.0
1983 4381 0.0 0.0 0.0
1984 5309 0.0 0.0 0.0
1985 6373 0.0 0.0 0.0
1986 4748 0.0 0.0 0.0
1987 7210 0.0 0.0 0.0
1988 6997 0.0 0.0 0.0
1989 7698 0.0 0.0 0.0
1990 5861 0.0 0.0 0.0
1991 5564 0.0 0.0 0.0
1992 8107 0.0 0.0 0.0
1993 8354 0.0 0.0 0.0
1994 6679 0.0 0.0 0.0
1997 785 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-09-15 No Incident Encountered 0.00 0.00

For data sources see[6]

References