If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0664222616000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.74592,"lon":-113.213471,"icon":""}]} |
Location: 00/16-26-066-22W4/0 | |
Location Alias: 00/16-26-66-22 W4M | |
Location Alias 2: 00/16-26-066-22 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 066 | |
Meridian: 4 | |
Range: 22 | |
Section: 26 | |
County/Municipality: Athabasca County | |
Well Name: RENAISSANCE ATHAE 16-26-66-22 | |
Operator Name: Husky Oil Operations Limited | |
License Number: 0155429 | |
License Date: 1993-01-04 | |
License Status: Suspension | |
Spud Date: 1993-01-13 | |
Final Drill Date: 1993-01-18 | |
Well Total Depth: 641.00 m | |
Surface Hole Latitude: 54.745920 | |
Surface Hole Longitude: -113.213471 |
Date | Event |
---|---|
1993-01-04 | Obtained License |
1993-01-14 | Surface Casing Operation Performed |
1993-01-16 | Well Log Performed |
1993-01-17 | Production Casing Operation Performed |
1993-01-18 | Finished Drilling |
1993-01-18 | Perforation Treatment Performed - Open-Hole Completion |
1993-01-18 | Well Log Performed |
1993-01-18 | Well Mode changed to Drilled and Cased |
1993-01-19 | Rig Released |
1993-02-02 | Perforation Treatment Performed - Cement Plug |
1993-02-13 | Perforation Treatment Performed - Jet Perforation |
1993-04-01 | Well Began Production |
1993-04-01 | Well Fluid changed to Gas |
1993-04-01 | Well Mode changed to Flowing |
1993-11-11 | Perforation Treatment Performed - Jet Perforation |
1993-11-12 | Well Fluid changed to Gas |
1993-11-12 | Well Mode changed to Flowing |
1995-05-25 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1995-05-25 | Perforation Treatment Performed - Jet Perforation |
1995-05-25 | Plug Back Performed |
1995-05-25 | Well Fluid changed to Gas |
1995-05-25 | Well Mode changed to Abandoned Zone |
1996-11-30 | Perforation Treatment Performed - Jet Perforation |
1999-12-17 | Perforation Treatment Performed - Jet Perforation |
2004-11-30 | Perforation Treatment Performed - Cement Squeeze |
2004-11-30 | Plug Back Performed |
2004-11-30 | Well Log Performed |
2004-12-03 | Perforation Treatment Performed - Jet Perforation |
2004-12-03 | Well Log Performed |
2016-09-11 | Perforation Treatment Performed - Cement Plug |
2018-02-15 | Perforation Treatment Performed - Jet Perforation |
2018-02-16 | Well Log Performed |
2018-02-17 | Perforation Treatment Performed - Jet Perforation |
2018-02-17 | Well Log Performed |
2018-02-19 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2018-02-19 | Perforation Treatment Performed - Cement Plug |
2018-02-19 | Perforation Treatment Performed - Remedial Casing |
2018-02-20 | Perforation Treatment Performed - Jet Perforation |
2018-02-20 | Well Log Performed |
2018-02-22 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2018-02-22 | Perforation Treatment Performed - Cement Plug |
2018-02-22 | Perforation Treatment Performed - Remedial Casing |
2018-02-23 | Perforation Treatment Performed - Jet Perforation |
2018-02-23 | Well Log Performed |
2018-02-26 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2018-02-26 | Perforation Treatment Performed - Cement Plug |
2018-02-26 | Perforation Treatment Performed - Remedial Casing |
2018-07-24 | Well Log Performed |
2018-07-29 | Well Log Performed |
2018-08-01 | Well Log Performed |
2018-08-09 | Well Log Performed |
2018-08-15 | Well Log Performed |
2018-08-19 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1993-01-18 | Open Hole/Barefoot Completion | 585.50 | 641.00 | 0 |
1995-05-25 | Perforation | 449.50 | 450.50 | 13 |
1996-11-30 | Perforation | 435.00 | 436.00 | 13 |
1996-11-30 | Perforation | 437.50 | 438.30 | 13 |
1999-12-17 | Perforation | 395.50 | 396.00 | 14 |
2004-11-30 | Cement Squeeze | 395.50 | 396.00 | 0 |
2004-12-03 | Perforation | 435.00 | 436.00 | 13 |
2004-12-03 | Perforation | 437.50 | 438.30 | 13 |
2016-09-11 | Cement Plug | 333.90 | 470.30 | 0 |
2018-02-15 | Perforation | 432.00 | 435.00 | 17 |
2018-02-17 | Perforation | 432.00 | 435.00 | 20 |
1993-02-02 | Cement Plug | 543.00 | 636.00 | 0 |
2018-02-19 | Remedial Casing Cementing | 432.00 | 435.00 | 0 |
2018-02-19 | Cement Plug | 429.00 | 435.00 | 0 |
2018-02-19 | Packing Device Capped w/Cement | 421.00 | 429.00 | 0 |
2018-02-20 | Perforation | 394.00 | 397.00 | 17 |
2018-02-20 | Perforation | 394.00 | 397.00 | 20 |
2018-02-22 | Remedial Casing Cementing | 394.00 | 397.00 | 0 |
2018-02-22 | Cement Plug | 391.10 | 397.00 | 0 |
2018-02-22 | Packing Device Capped w/Cement | 378.60 | 391.10 | 0 |
2018-02-23 | Perforation | 280.00 | 283.00 | 17 |
2018-02-23 | Perforation | 280.00 | 283.00 | 20 |
1993-02-13 | Perforation | 532.00 | 533.00 | 13 |
2018-02-26 | Remedial Casing Cementing | 280.00 | 283.00 | 0 |
2018-02-26 | Cement Plug | 272.40 | 283.00 | 0 |
2018-02-26 | Packing Device Capped w/Cement | 268.30 | 272.40 | 0 |
1993-11-11 | Perforation | 483.50 | 485.00 | 13 |
1993-11-11 | Perforation | 496.00 | 497.50 | 13 |
1993-11-11 | Perforation | 503.00 | 504.50 | 13 |
1995-05-25 | Packing Device Capped w/Cement | 522.00 | 530.00 | 0 |
1995-05-25 | Packing Device Capped w/Cement | 472.00 | 480.00 | 0 |
1995-05-25 | Perforation | 454.00 | 456.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1993 | 6034 | 0.0 | 0.0 | 0.0 |
1994 | 3522 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2016-09-13 | No Incident Encountered | 0.00 | 0.00 |
2018-02-27 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]