If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0664223615032 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.762015,"lon":-113.189972,"icon":""}]} |
Location: 03/15-36-066-22W4/2 | |
Location Alias: 03/15-36-66-22 W4M | |
Location Alias 2: 03/15-36-066-22 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 066 | |
Meridian: 4 | |
Range: 22 | |
Section: 36 | |
County/Municipality: Athabasca County | |
Well Name: RENAISSANCE 03 ATHAE 15-36-66-22 | |
Operator Name: Husky Oil Operations Limited | |
License Number: 0194071 | |
License Date: 1996-11-26 | |
License Status: Suspension | |
Spud Date: 1996-12-03 | |
Final Drill Date: 1996-12-06 | |
Well Total Depth: 604.00 m | |
Surface Hole Latitude: 54.762015 | |
Surface Hole Longitude: -113.189972 |
Date | Event |
---|---|
1996-11-26 | Obtained License |
1996-12-04 | Direction Drilling Operation Performed - Deviate |
1996-12-04 | Surface Casing Operation Performed |
1996-12-06 | Finished Drilling |
1996-12-06 | Lost Circulation Occurred |
1996-12-06 | Well Log Performed |
1996-12-06 | Well Mode changed to Drilled and Cased |
1996-12-07 | Production Casing Operation Performed |
1996-12-07 | Well Log Performed |
1996-12-08 | Rig Released |
1996-12-11 | Perforation Treatment Performed - Open-Hole Completion |
1996-12-13 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1997-01-15 | Well Log Performed |
1997-02-12 | Well Began Production |
1997-02-12 | Well Fluid changed to Gas |
1997-02-12 | Well Mode changed to Flowing |
1997-12-11 | Perforation Treatment Performed - Jet Perforation |
1997-12-12 | Perforation Treatment Performed - Jet Perforation |
1998-03-10 | Perforation Treatment Performed - Jet Perforation |
1998-07-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1998-07-18 | Perforation Treatment Performed - Jet Perforation |
1998-07-18 | Well Fluid changed to Gas |
1998-07-18 | Well Mode changed to Flowing |
1999-02-09 | Perforation Treatment Performed - Jet Perforation |
2001-01-01 | Well Fluid changed to Gas |
2001-01-01 | Well Mode changed to Pumping |
2016-09-07 | Well Fluid changed to Gas |
2016-09-07 | Well Mode changed to Suspended |
2019-10-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2019-10-06 | Perforation Treatment Performed - Cement Squeeze |
2019-10-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2019-10-08 | Perforation Treatment Performed - Cement Squeeze |
2019-10-08 | Plug Back Performed |
2019-10-08 | Well Fluid changed to Gas |
2019-10-08 | Well Mode changed to Abandoned Zone |
2019-10-10 | Perforation Treatment Performed - Cement Squeeze |
2019-10-12 | Perforation Treatment Performed - Cement Squeeze |
2019-10-13 | Well Log Performed |
2019-10-15 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2019-10-15 | Perforation Treatment Performed - Jet Perforation |
2019-10-15 | Plug Back Performed |
2019-10-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2019-10-18 | Perforation Treatment Performed - Remedial Casing |
2019-10-19 | Perforation Treatment Performed - Jet Perforation |
2019-10-19 | Well Log Performed |
2019-10-29 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2019-10-29 | Perforation Treatment Performed - Remedial Casing |
2019-10-30 | Perforation Treatment Performed - Jet Perforation |
2019-10-30 | Well Log Performed |
2019-11-01 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2019-11-01 | Perforation Treatment Performed - Remedial Casing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1996-12-04 | 150.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1996-12-11 | Open Hole/Barefoot Completion | 595.00 | 604.00 | 0 |
1998-07-18 | Perforation | 435.00 | 437.00 | 13 |
1999-02-09 | Perforation | 507.00 | 508.00 | 13 |
2019-10-06 | Packing Device Capped w/Cement | 510.50 | 519.50 | 0 |
2019-10-06 | Cement Squeeze | 521.50 | 523.50 | 0 |
2019-10-06 | Cement Squeeze | 526.00 | 532.00 | 0 |
2019-10-08 | Cement Squeeze | 507.00 | 508.00 | 0 |
2019-10-08 | Cement Squeeze | 500.00 | 502.00 | 0 |
2019-10-08 | Packing Device Capped w/Cement | 485.50 | 496.50 | 0 |
2019-10-10 | Cement Squeeze | 451.00 | 452.00 | 0 |
2019-10-10 | Cement Squeeze | 445.50 | 447.00 | 0 |
1996-12-13 | Acid Treatment | 595.00 | 604.00 | 0 |
2019-10-12 | Cement Squeeze | 435.00 | 437.00 | 0 |
2019-10-15 | Packing Device Capped w/Cement | 423.50 | 431.50 | 0 |
2019-10-15 | Perforation | 389.50 | 392.50 | 20 |
2019-10-15 | Perforation | 389.50 | 392.50 | 17 |
2019-10-18 | Remedial Casing Cementing | 389.50 | 392.50 | 0 |
2019-10-18 | Packing Device Capped w/Cement | 378.00 | 386.00 | 0 |
2019-10-19 | Perforation | 323.00 | 326.00 | 20 |
2019-10-19 | Perforation | 323.00 | 326.00 | 17 |
2019-10-29 | Packing Device Capped w/Cement | 311.00 | 319.00 | 0 |
2019-10-29 | Remedial Casing Cementing | 323.00 | 326.00 | 0 |
1997-12-11 | Perforation | 598.00 | 604.00 | 13 |
2019-10-30 | Perforation | 178.00 | 181.00 | 20 |
2019-10-30 | Perforation | 178.00 | 181.00 | 17 |
2019-11-01 | Remedial Casing Cementing | 178.00 | 181.00 | 0 |
2019-11-01 | Packing Device Capped w/Cement | 166.00 | 174.00 | 0 |
1997-12-11 | Perforation | 500.00 | 502.00 | 13 |
1997-12-12 | Perforation | 445.50 | 447.00 | 13 |
1998-03-10 | Perforation | 526.00 | 532.00 | 13 |
1998-03-10 | Perforation | 521.50 | 523.50 | 13 |
1998-07-18 | Packing Device Capped w/Cement | 583.00 | 591.00 | 0 |
1998-07-18 | Perforation | 451.00 | 452.00 | 12 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1997 | 7921 | 0.0 | 0.0 | 0.0 |
1998 | 5987 | 0.0 | 0.0 | 0.0 |
1999 | 8490 | 0.0 | 0.0 | 0.0 |
2000 | 8756 | 0.0 | 0.0 | 0.0 |
2001 | 8554 | 0.0 | 0.0 | 0.0 |
2002 | 4114 | 0.0 | 0.0 | 0.0 |
2003 | 4986 | 0.0 | 0.0 | 0.0 |
2004 | 744 | 0.0 | 0.0 | 0.0 |
2005 | 7896 | 0.0 | 0.0 | 0.0 |
2006 | 8385 | 0.0 | 0.0 | 0.0 |
2007 | 8243 | 0.0 | 0.0 | 0.0 |
2008 | 8685 | 0.0 | 0.0 | 0.0 |
2009 | 8496 | 0.0 | 0.0 | 0.0 |
2010 | 8751 | 0.0 | 0.0 | 0.0 |
2011 | 8567 | 0.0 | 0.0 | 0.0 |
2012 | 8508 | 0.0 | 0.0 | 0.0 |
2013 | 5934 | 0.0 | 0.0 | 0.0 |
2014 | 7417 | 0.0 | 0.0 | 0.0 |
2015 | 8230 | 0.0 | 0.0 | 0.0 |
2016 | 2673 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1996-12-06 | Lost Circulation | 600.00 | 600.00 |
1998-07-18 | No Incident Encountered | 0.00 | 0.00 |
1998-07-19 | No Incident Encountered | 0.00 | 0.00 |
1999-02-08 | No Incident Encountered | 0.00 | 0.00 |
2019-11-02 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]