X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0664242705000

Well Details

Well ID: 0664242705000
Loading map...
Location: 00/05-27-066-24W4/0
Location Alias: 00/05-27-66-24 W4M
Location Alias 2: 00/05-27-066-24 W4/00
Country: Canada
Province: Alberta
Township: 066
Meridian: 4
Range: 24
Section: 27
County/Municipality: Athabasca County
Well Name: CNRL STEELE 5-27-66-24
Operator Name: Canadian Natural Resources Limited
License Number: 0139396
License Date: 1989-03-22
License Status: RecCertified
Spud Date: 1989-03-30
Final Drill Date: 1989-04-03
Well Total Depth: 1093.00 m
Surface Hole Latitude: 54.738537
Surface Hole Longitude: -113.567536

For data sources see[1][2]

Well History

Date Event
1989-03-22 Obtained License
1989-03-30 Direction Drilling Operation Performed - Deviate
1989-03-30 Lost Circulation Occurred
1989-03-31 Surface Casing Operation Performed
1989-04-03 Finished Drilling
1989-04-03 Well Log Performed
1989-04-05 Well Log Performed
1989-04-06 Production Casing Operation Performed
1989-04-07 Rig Released
1989-04-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-04-08 Perforation Treatment Performed - Jet Perforation
1989-04-08 Well Log Performed
1989-04-10 Well Mode changed to Drilled and Cased
1989-11-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-11-15 Plug Back Performed
1990-07-20 Perforation Treatment Performed - Jet Perforation
1990-07-22 Perforation Treatment Performed - Remedial Casing
1990-07-24 Perforation Treatment Performed - Jet Perforation
1990-07-25 Perforation Treatment Performed - Remedial Casing
1990-07-28 Perforation Treatment Performed - Jet Perforation
1990-07-28 Well Log Performed
1990-07-30 Perforation Treatment Performed - Remedial Casing
1990-08-01 Perforation Treatment Performed - Jet Perforation
1990-08-01 Perforation Treatment Performed - Remedial Casing
1990-08-01 Well Log Performed
1990-08-07 Perforation Treatment Performed - Jet Perforation
1990-08-12 Perforation Treatment Performed - Remedial Casing
1990-08-18 Well Log Performed
1990-09-07 Perforation Treatment Performed - Cement Plug
1990-09-08 Perforation Treatment Performed - Jet Perforation
1990-09-09 Perforation Treatment Performed - Jet Perforation
1990-09-09 Perforation Treatment Performed - Remedial Casing
1990-09-10 Perforation Treatment Performed - Remedial Casing
1990-09-11 Perforation Treatment Performed - Jet Perforation
1992-10-20 Perforation Treatment Performed - Remedial Casing
1994-11-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-11-20 Perforation Treatment Performed - Jet Perforation
1995-11-20 Well Log Performed
1995-11-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-11-22 Perforation Treatment Performed - Remedial Casing
1995-11-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-11-24 Plug Back Performed
1995-11-24 Well Log Performed
1995-11-24 Well Mode changed to Abandoned
1995-11-28 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1989-03-30 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1989-04-08 Perforation 1077.00 1083.00 13
1990-08-01 Perforation 662.00 663.00 13
1990-08-01 Remedial Casing Cementing 662.00 663.00 0
1990-08-07 Perforation 362.00 363.00 13
1990-08-12 Remedial Casing Cementing 362.00 363.00 0
1990-09-07 Cement Plug 813.00 1027.50 0
1990-09-07 Cement Plug 599.00 818.00 0
1990-09-08 Perforation 314.50 315.50 13
1990-09-08 Perforation 350.00 351.00 13
1990-09-09 Perforation 245.00 246.00 13
1990-09-09 Perforation 273.50 274.50 13
1989-04-08 Acid Treatment 1077.00 1083.00 0
1990-09-09 Remedial Casing Cementing 314.50 315.50 0
1990-09-10 Remedial Casing Cementing 245.00 274.50 0
1990-09-11 Perforation 171.00 172.00 13
1992-10-20 Remedial Casing Cementing 171.00 172.00 0
1994-11-02 Packing Device Capped w/Cement 245.00 302.50 0
1995-11-20 Perforation 252.00 252.30 72
1995-11-22 Acid Treatment 252.00 252.30 0
1995-11-22 Remedial Casing Cementing 252.00 252.30 0
1995-11-24 Packing Device Capped w/Cement 222.00 230.00 0
1995-11-24 Packing Device Capped w/Cement 157.00 165.00 0
1989-11-15 Packing Device Capped w/Cement 1057.00 1065.00 0
1990-07-20 Perforation 1007.00 1008.00 13
1990-07-22 Remedial Casing Cementing 1007.00 1008.00 0
1990-07-24 Perforation 872.00 873.00 13
1990-07-25 Remedial Casing Cementing 872.00 873.00 0
1990-07-28 Perforation 712.00 713.00 13
1990-07-30 Remedial Casing Cementing 712.00 713.00 0

For data sources see[5]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1989-03-30 Lost Circulation 70.00 70.00

For data sources see[6]

References