X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0664263111000

Well Details

Well ID: 0664263111000
Loading map...
Location: 00/11-31-066-26W4/0
Location Alias: 00/11-31-66-26 W4M
Location Alias 2: 00/11-31-066-26 W4/00
Country: Canada
Province: Alberta
Township: 066
Meridian: 4
Range: 26
Section: 31
County/Municipality: Municipal District of Lesser Slave River No. 124
Well Name: SABRE ANDERSON BIG BEND 11-31-66-26
Operator Name: Sabre Energy Ltd.
License Number: 0036113
License Date: 1969-04-08
License Status: Suspension
Spud Date: 1969-04-10
Final Drill Date: 1969-04-15
Well Total Depth: 842.50 m
Surface Hole Latitude: 54.757348
Surface Hole Longitude: -113.929843

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1969-04-08 Obtained License
1969-04-15 Finished Drilling
1969-04-17 Drill Stem Test Performed
1969-04-18 Production Casing Operation Performed
1969-04-19 Well Mode changed to Drilled and Cased
1971-03-15 Perforation Treatment Performed - Jet Perforation
1971-03-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1971-03-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1971-03-17 Perforation Treatment Performed - Jet Perforation
1971-03-18 Perforation Treatment Performed - Cement Squeeze
1971-03-19 Perforation Treatment Performed - Jet Perforation
1971-03-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1971-03-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1971-04-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-05-10 Well Began Production
1972-05-10 Well Fluid changed to Gas
1972-05-10 Well Mode changed to Flowing
1972-11-27 Perforation Treatment Performed - Cement Squeeze
1972-11-27 Well Fluid changed to Gas
1972-11-27 Well Mode changed to Suspended
1972-11-28 Perforation Treatment Performed - Jet Perforation
1972-11-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-01-28 Perforation Treatment Performed - Jet Perforation
1974-01-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-04-18 Well Fluid changed to Gas
1974-04-18 Well Mode changed to Flowing
1975-08-31 Well Fluid changed to Gas
1975-08-31 Well Mode changed to Suspended
1977-11-11 Well Fluid changed to Gas
1977-11-11 Well Mode changed to Flowing
1993-06-08 Well Fluid changed to Gas
1993-06-08 Well Mode changed to Suspended
1994-09-01 Well Fluid changed to Gas
1994-09-01 Well Mode changed to Flowing
1994-09-03 Well Fluid changed to Gas
1994-09-03 Well Mode changed to Suspended
1999-05-05 Well Log Performed
2001-11-02 Perforation Treatment Performed - Bridge Plug No Cement Required
2001-11-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-11-20 Perforation Treatment Performed - Cement Plug
2001-11-20 Perforation Treatment Performed - Jet Perforation
2001-11-20 Plug Back Performed
2001-11-20 Well Log Performed
2001-11-21 Perforation Treatment Performed - Jet Perforation
2001-11-21 Well Log Performed
2001-11-22 Perforation Treatment Performed - Cement Plug
2001-11-22 Perforation Treatment Performed - Cement Squeeze

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1971-03-15 Perforation 763.20 764.10 7
1971-03-19 Perforation 789.40 791.90 7
1971-03-20 Acid Treatment 789.40 809.50 0
1971-03-21 Acid Treatment 789.40 794.90 0
1971-03-21 Acid Treatment 808.60 812.30 0
1971-04-01 Acid Treatment 808.60 812.30 0
1972-11-27 Cement Squeeze 789.40 812.30 0
1972-11-28 Perforation 789.40 791.60 7
1972-11-28 Perforation 793.10 794.90 7
1972-11-29 Acid Treatment 789.40 794.90 0
1974-01-28 Perforation 808.60 809.50 7
1971-03-16 Acid Treatment 763.20 764.10 0
1974-01-28 Perforation 811.10 812.30 7
1974-01-29 Acid Treatment 808.60 812.30 0
2001-11-02 Bridge Plug, No Cement 800.00 800.50 0
2001-11-20 Cement Plug 792.00 800.00 0
2001-11-20 Packing Device Capped w/Cement 759.00 775.00 0
2001-11-20 Packing Device Capped w/Cement 572.00 780.00 0
2001-11-20 Perforation 365.00 366.00 14
2001-11-21 Perforation 301.00 302.00 14
2001-11-22 Cement Squeeze 365.00 366.00 0
2001-11-22 Cement Plug 229.00 321.00 0
1971-03-17 Perforation 816.60 817.20 7
1971-03-17 Acid Treatment 816.60 817.20 0
1971-03-18 Cement Squeeze 816.60 817.20 0
1971-03-18 Cement Squeeze 763.20 764.10 0
1971-03-19 Perforation 811.10 812.30 7
1971-03-19 Perforation 808.60 809.50 7
1971-03-19 Perforation 793.10 794.90 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1972 784 0.0 0.0 0.0
1974 3418 0.0 0.0 0.0
1975 1975 0.0 0.0 0.0
1977 736 0.0 0.0 0.0
1978 8313 0.0 0.0 0.0
1979 4911 0.0 0.0 0.0
1980 3563 0.0 0.0 0.0
1981 2814 0.0 0.0 0.0
1982 2252 0.0 0.0 0.0
1984 6931 0.0 0.0 0.0
1985 6527 0.0 0.0 0.0
1986 6199 0.0 0.0 0.0
1987 2728 0.0 0.0 0.0
1988 3888 0.0 0.0 0.0
1989 6687 0.0 0.0 0.0
1990 7024 0.0 0.0 0.0
1991 8178 0.0 0.0 0.0
1992 8743 0.0 0.0 0.0
1993 3720 0.0 0.0 0.0
1994 24 0.0 0.0 0.0

For data sources see[5]

References