X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0664272412000

Well Details

Well ID: 0664272412000
Loading map...
Location: 00/12-24-066-27W4/0
Location Alias: 00/12-24-66-27 W4M
Location Alias 2: 00/12-24-066-27 W4/00
Country: Canada
Province: Alberta
Township: 066
Meridian: 4
Range: 27
Section: 24
County/Municipality: Municipal District of Lesser Slave River No. 124
Well Name: SABRE BIG BEND 12-24-66-27
Operator Name: Sabre Energy Ltd.
License Number: 0137107
License Date: 1988-10-21
License Status: Abandoned
Spud Date: 1988-10-23
Final Drill Date: 1988-10-29
Well Total Depth: 865.00 m
Surface Hole Latitude: 54.728662
Surface Hole Longitude: -113.958389

For data sources see[1][2]

Well History

Date Event
1988-10-21 Obtained License
1988-10-24 Surface Casing Operation Performed
1988-10-25 Direction Drilling Operation Performed - Deviate
1988-10-29 Finished Drilling
1988-11-01 Well Log Performed
1988-11-02 Production Casing Operation Performed
1988-11-02 Rig Released
1988-11-02 Well Mode changed to Drilled and Cased
1988-11-18 Well Log Performed
1989-03-29 Perforation Treatment Performed - Jet Perforation
1989-03-30 Perforation Treatment Performed - Jet Perforation
1989-04-01 Perforation Treatment Performed - Cement Squeeze
1989-04-05 Perforation Treatment Performed - Jet Perforation
1989-04-08 Perforation Treatment Performed - Nitrogen Treatment
1989-11-01 Well Began Production
1989-11-01 Well Fluid changed to Gas
1989-11-01 Well Mode changed to Flowing
1997-12-12 Well Fluid changed to Gas
1997-12-12 Well Mode changed to Suspended
1998-07-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-07-20 Perforation Treatment Performed - Jet Perforation
1998-07-20 Well Log Performed
1999-07-30 Well Fluid changed to Gas
1999-07-30 Well Mode changed to Flowing
2002-11-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-11-11 Perforation Treatment Performed - Bridge Plug No Cement Required
2002-11-11 Plug Back Performed
2002-11-11 Well Fluid changed to Gas
2002-11-11 Well Log Performed
2002-11-11 Well Mode changed to Abandoned Zone
2002-11-12 Perforation Treatment Performed - Jet Perforation
2002-11-12 Well Log Performed
2002-11-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-11-13 Perforation Treatment Performed - Jet Perforation
2002-11-13 Plug Back Performed
2002-11-13 Well Log Performed
2002-11-15 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1988-10-25 450.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1989-03-29 Perforation 789.00 793.00 14
1998-07-20 Perforation 794.50 797.00 13
2002-11-11 Bridge Plug, No Cement 783.00 783.50 0
2002-11-11 Packing Device Capped w/Cement 761.00 769.50 0
2002-11-12 Perforation 589.00 590.00 17
2002-11-13 Packing Device Capped w/Cement 562.00 570.50 0
2002-11-13 Perforation 255.00 255.50 17
1989-03-29 Perforation 794.50 797.00 14
1989-03-30 Perforation 586.00 589.00 14
1989-04-01 Cement Squeeze 586.00 589.00 0
1989-04-05 Perforation 582.50 584.50 14
1989-04-08 Nitrogen Treatment 582.50 584.50 0
1998-07-19 Acid Treatment 789.00 797.00 0
1998-07-20 Perforation 801.00 802.00 13
1998-07-20 Perforation 789.00 793.00 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1989 1464 0.0 0.0 0.0
1990 5775 0.0 0.0 0.0
1991 8086 0.0 0.0 0.0
1992 7759 0.0 0.0 0.0
1993 8283 0.0 0.0 0.0
1994 8660 0.0 0.0 0.0
1995 8658 0.0 0.0 0.0
1996 8762 0.0 0.0 0.0
1997 8201 0.0 0.0 0.0
1999 3687 0.0 0.0 0.0
2000 8651 0.0 0.0 0.0
2001 8029 0.0 0.0 0.0
2002 1064 0.0 0.0 0.0

For data sources see[6]

References