X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0665021910000

Well Details

Well ID: 0665021910000
Loading map...
Location: 00/10-19-066-02W5/0
Location Alias: 00/10-19-66-02 W5M
Location Alias 2: 00/10-19-066-02 W5/00
Country: Canada
Province: Alberta
Township: 066
Meridian: 5
Range: 02
Section: 19
County/Municipality: Municipal District of Lesser Slave River No. 124
Well Name: CNRL BIG BEND 10-19-66-2
Operator Name: Canadian Natural Resources Limited
License Number: 0061481
License Date: 1976-12-03
License Status: Suspension
Spud Date: 1977-02-22
Final Drill Date: 1977-02-25
Well Total Depth: 838.80 m
Surface Hole Latitude: 54.727461
Surface Hole Longitude: -114.286999

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-12-03 Obtained License
1977-02-25 Drill Stem Test Performed
1977-02-25 Finished Drilling
1977-02-26 Drill Stem Test Performed
1977-02-27 Drill Stem Test Performed
1977-02-28 Production Casing Operation Performed
1977-02-28 Well Mode changed to Drilled and Cased
1977-12-15 Perforation Treatment Performed - Jet Perforation
1977-12-16 Perforation Treatment Performed - Cement Squeeze
1977-12-21 Perforation Treatment Performed - Jet Perforation
1977-12-22 Perforation Treatment Performed - Cement Squeeze
1977-12-29 Perforation Treatment Performed - Jet Perforation
1977-12-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-01-04 Perforation Treatment Performed - Jet Perforation
1978-01-04 Well Mode changed to Drilled and Cased
1978-01-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-04-07 Well Began Production
1978-04-07 Well Fluid changed to Gas
1978-04-07 Well Mode changed to Flowing
1978-10-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1978-10-18 Well Fluid changed to Gas
1978-10-18 Well Mode changed to Abandoned Zone
1978-10-19 Perforation Treatment Performed - Jet Perforation
2009-03-08 Perforation Treatment Performed - Jet Perforation
2012-02-09 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1977-12-15 Perforation 796.10 796.70 7
1978-10-19 Perforation 783.90 784.60 6
1978-10-19 Perforation 608.60 608.90 6
2009-03-08 Perforation 782.10 783.30 17
2009-03-08 Perforation 783.90 784.60 17
2009-03-08 Perforation 608.60 609.30 17
1977-12-16 Cement Squeeze 796.10 796.70 0
1977-12-21 Perforation 795.50 796.10 7
1977-12-22 Cement Squeeze 795.50 796.10 0
1977-12-29 Perforation 794.60 794.90 13
1977-12-30 Acid Treatment 794.60 794.90 0
1978-01-04 Perforation 782.10 783.30 7
1978-01-17 Acid Treatment 782.10 783.30 0
1978-10-18 Packing Device Capped w/Cement 793.00 793.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1978 2746 0.0 0.0 0.0

For data sources see[5]

References