X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0665022210000

Well Details

Well ID: 0665022210000
Loading map...
Location: 00/10-22-066-02W5/0
Location Alias: 00/10-22-66-02 W5M
Location Alias 2: 00/10-22-066-02 W5/00
Country: Canada
Province: Alberta
Township: 066
Meridian: 5
Range: 02
Section: 22
County/Municipality: Municipal District of Lesser Slave River No. 124
Well Name: CNRES BIG BEND 10-22-66-2
Operator Name: Canadian Natural Resources Limited
License Number: 0189126
License Date: 1996-06-27
License Status: Amended
Spud Date: 1996-07-04
Final Drill Date: 1996-07-07
Well Total Depth: 839.00 m
Surface Hole Latitude: 54.728424
Surface Hole Longitude: -114.214174

For data sources see[1][2]

Well History

Date Event
1996-06-27 Obtained License
1996-07-04 Well Log Performed
1996-07-05 Surface Casing Operation Performed
1996-07-07 Finished Drilling
1996-07-07 Well Log Performed
1996-07-08 Production Casing Operation Performed
1996-07-08 Rig Released
1996-07-08 Well Mode changed to Drilled and Cased
1996-08-01 Well Log Performed
1996-08-02 Perforation Treatment Performed - Jet Perforation
1996-08-02 Well Log Performed
1996-08-03 Perforation Treatment Performed - Jet Perforation
1999-03-04 Perforation Treatment Performed - Jet Perforation
1999-03-04 Well Log Performed
1999-03-04 Well Mode changed to Drilled and Cased
1999-04-01 Well Began Production
1999-04-01 Well Fluid changed to Gas
1999-04-01 Well Mode changed to Flowing
2001-06-20 Well Log Performed
2001-07-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-07-10 Perforation Treatment Performed - Jet Perforation
2001-07-10 Plug Back Performed
2001-07-10 Well Fluid changed to Gas
2001-07-10 Well Log Performed
2001-07-10 Well Mode changed to Abandoned Zone
2001-07-11 Perforation Treatment Performed - Jet Perforation
2001-07-11 Well Log Performed
2003-07-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-07-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-07-31 Perforation Treatment Performed - Jet Perforation
2003-07-31 Plug Back Performed
2003-07-31 Well Log Performed
2003-08-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-08-01 Plug Back Performed
2003-08-08 Well Log Performed
2003-08-09 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-08-02 Perforation 783.50 784.50 13
2003-07-31 Packing Device Capped w/Cement 739.00 747.00 0
2003-07-31 Perforation 717.50 718.50 20
2003-08-01 Packing Device Capped w/Cement 703.00 711.00 0
2003-08-09 Perforation 576.50 578.00 17
1996-08-02 Perforation 787.80 788.80 13
1996-08-03 Perforation 778.00 780.00 13
1999-03-04 Perforation 587.00 588.00 20
1999-03-04 Perforation 593.00 594.30 20
2001-07-10 Packing Device Capped w/Cement 769.00 777.00 0
2001-07-10 Perforation 754.00 755.50 20
2001-07-11 Perforation 761.60 763.00 20
2003-07-30 Packing Device Capped w/Cement 752.00 760.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 4035 0.0 0.0 0.0

For data sources see[5]

References