0665100610000

Well Details

Well ID: 0665100610000
Loading map...
Location: 00/10-06-066-10W5/0
Location Alias: 00/10-06-66-10 W5M
Location Alias 2: 00/10-06-066-10 W5/00
Country: Canada
Province: Alberta
Township: 066
Meridian: 5
Range: 10
Section: 06
County/Municipality: Big Lakes County
Well Name: 1976082 SWANHS 10-6-66-10
Operator Name: Razor Energy Corp.
License Number: 0018538
License Date: 1960-01-20
License Status: Suspension
Spud Date: 1960-06-03
Final Drill Date: 1960-06-29
Well Total Depth: 2664.00 m
Surface Hole Latitude: 54.685030
Surface Hole Longitude: -115.497731

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1960-01-20 Obtained License
1960-06-29 Finished Drilling
1960-06-29 Well Mode changed to Drilled and Cased
1960-06-30 Production Casing Operation Performed
1960-07-01 Perforation Treatment Performed - Jet Perforation
1960-07-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-07-06 Perforation Treatment Performed - Jet Perforation
1960-07-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-07-13 Well Began Production
1960-07-13 Well Fluid changed to Crude Oil
1960-07-13 Well Mode changed to Flowing
1990-03-20 Perforation Treatment Performed - Jet Perforation
1990-03-20 Well Log Performed
1990-03-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-01-16 Well Fluid changed to Crude Oil
1993-01-16 Well Mode changed to Pumping
2017-09-01 Well Fluid changed to Crude Oil
2017-09-01 Well Mode changed to Suspended
2018-07-27 Well Fluid changed to Crude Oil
2018-07-27 Well Mode changed to Pumping
2019-08-01 Well Fluid changed to Crude Oil
2019-08-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1960-07-01 Perforation 2614.60 2618.50 7
1990-03-20 Perforation 2599.60 2601.50 13
1990-03-20 Perforation 2603.30 2604.80 13
1990-03-20 Perforation 2612.10 2617.60 13
1990-03-20 Perforation 2618.20 2619.80 13
1990-03-20 Perforation 2620.70 2622.80 13
1990-03-22 Acid Treatment 2577.40 2624.00 0
1960-07-01 Perforation 2619.50 2620.70 7
1960-07-01 Perforation 2622.20 2624.00 7
1960-07-02 Acid Treatment 2614.60 2624.00 0
1960-07-06 Perforation 2585.90 2593.80 7
1960-07-07 Acid Treatment 2585.90 2593.80 0
1990-03-20 Perforation 2577.40 2578.60 13
1990-03-20 Perforation 2579.50 2580.70 13
1990-03-20 Perforation 2585.60 2593.80 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1975 228 0.0 0.0 0.0
1976 6569 0.0 0.0 0.0
1977 5388 0.0 0.0 0.0
1978 7233 0.0 0.0 0.0
1979 8419 0.0 0.0 0.0
1980 8692 0.0 0.0 0.0
1981 6900 0.0 0.0 0.0
1982 8476 0.0 0.0 0.0
1983 8035 0.0 0.0 0.0
1984 8326 0.0 0.0 0.0
1985 8345 0.0 0.0 0.0
1986 8512 0.0 0.0 0.0
1987 8666 0.0 0.0 0.0
1988 8580 0.0 0.0 0.0
1989 8620 0.0 0.0 0.0
1990 8017 0.0 0.0 0.0
1991 8750 0.0 0.0 0.0
1992 7573 0.0 0.0 0.0
1993 7646 0.0 0.0 0.0
1994 8192 0.0 0.0 0.0
1995 7622 0.0 0.0 0.0
1996 8622 0.0 0.0 0.0
1997 8254 0.0 0.0 0.0
1998 8573 0.0 0.0 0.0
1999 8551 0.0 0.0 0.0
2000 8482 0.0 0.0 0.0
2001 8112 0.0 0.0 0.0
2002 8196 0.0 0.0 0.0
2003 8625 0.0 0.0 0.0
2004 7529 0.0 0.0 0.0
2005 7074 0.0 0.0 0.0
2006 7871 0.0 0.0 0.0
2007 8600 0.0 0.0 0.0
2008 8439 0.0 0.0 0.0
2009 8334 0.0 0.0 0.0
2010 4972 0.0 0.0 0.0
2011 7182 0.0 0.0 0.0
2012 7713 0.0 0.0 0.0
2013 1102 0.0 0.0 0.0
2018 1 0.0 0.0 0.0

For data sources see[5]

References