X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0665100612000

Well Details

Well ID: 0665100612000
Loading map...
Location: 00/12-06-066-10W5/0
Location Alias: 00/12-06-66-10 W5M
Location Alias 2: 00/12-06-066-10 W5/00
Country: Canada
Province: Alberta
Township: 066
Meridian: 5
Range: 10
Section: 06
County/Municipality: Big Lakes County
Well Name: 1976082 SWANHS 12-6-66-10
Operator Name: Razor Energy Corp.
License Number: 0018508
License Date: 1960-01-14
License Status: Suspension
Spud Date: 1960-02-03
Final Drill Date: 1960-03-02
Well Total Depth: 2686.20 m
Surface Hole Latitude: 54.684620
Surface Hole Longitude: -115.509452

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1960-01-14 Obtained License
1960-03-02 Finished Drilling
1960-03-02 Well Mode changed to Drilled and Cased
1960-03-03 Production Casing Operation Performed
1960-03-09 Perforation Treatment Performed - Jet Perforation
1960-03-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-03-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1960-03-14 Perforation Treatment Performed - Jet Perforation
1960-03-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-03-20 Perforation Treatment Performed - Cement Squeeze
1960-03-21 Perforation Treatment Performed - Jet Perforation
1960-03-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-03-25 Well Began Production
1960-03-25 Well Fluid changed to Crude Oil
1960-03-25 Well Mode changed to Flowing
1962-04-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1962-04-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-04-04 Perforation Treatment Performed - Jet Perforation
1971-02-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1971-02-09 Perforation Treatment Performed - Jet Perforation
1977-09-08 Well Fluid changed to Crude Oil
1977-09-08 Well Mode changed to Pumping
2011-10-19 Well Fluid changed to Crude Oil
2011-10-19 Well Mode changed to Suspended
2018-06-29 Well Fluid changed to Crude Oil
2018-06-29 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1960-03-09 Perforation 2659.10 2662.10 7
1962-04-04 Perforation 2601.80 2606.30 7
1962-04-04 Acid Treatment 2601.80 2606.30 0
1971-02-09 Perforation 2565.80 2566.40 7
1971-02-09 Perforation 2571.30 2571.90 7
1971-02-09 Perforation 2572.50 2574.60 7
1971-02-09 Perforation 2575.60 2580.10 7
1971-02-09 Perforation 2581.00 2585.30 7
1971-02-09 Perforation 2585.60 2590.20 7
1971-02-09 Perforation 2591.70 2592.90 7
1971-02-09 Perforation 2593.50 2601.80 7
1960-03-10 Acid Treatment 2659.10 2662.10 0
1971-02-09 Acid Treatment 2565.80 2606.30 0
1960-03-14 Packing Device Capped w/Cement 2648.70 2648.70 0
1960-03-14 Perforation 2633.20 2636.20 7
1960-03-15 Acid Treatment 2633.20 2636.20 0
1960-03-20 Cement Squeeze 2633.20 2636.20 0
1960-03-21 Perforation 2623.70 2629.50 7
1960-03-22 Acid Treatment 2623.70 2629.50 0
1962-04-03 Packing Device Capped w/Cement 2618.20 2618.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1968 4226 0.0 0.0 0.0
1969 3895 0.0 0.0 0.0
1970 5692 0.0 0.0 0.0
1971 6253 0.0 0.0 0.0
1972 8325 0.0 0.0 0.0
1973 6934 0.0 0.0 0.0
1974 8184 0.0 0.0 0.0
1975 7660 0.0 0.0 0.0
1976 8045 0.0 0.0 0.0
1977 8279 0.0 0.0 0.0
1978 8529 0.0 0.0 0.0
1979 8388 0.0 0.0 0.0
1980 8539 0.0 0.0 0.0
1981 7808 0.0 0.0 0.0
1982 8323 0.0 0.0 0.0
1983 8222 0.0 0.0 0.0
1984 8538 0.0 0.0 0.0
1985 8447 0.0 0.0 0.0
1986 8596 0.0 0.0 0.0
1987 8379 0.0 0.0 0.0
1988 8399 0.0 0.0 0.0
1989 8619 0.0 0.0 0.0
1990 8476 0.0 0.0 0.0
1991 8635 0.0 0.0 0.0
1992 8480 0.0 0.0 0.0
1993 8178 0.0 0.0 0.0
1994 7764 0.0 0.0 0.0
1995 8129 0.0 0.0 0.0
1996 8572 0.0 0.0 0.0
1997 8653 0.0 0.0 0.0
1998 8293 0.0 0.0 0.0
1999 8572 0.0 0.0 0.0
2000 8590 0.0 0.0 0.0
2001 8636 0.0 0.0 0.0
2002 8652 0.0 0.0 0.0
2003 8458 0.0 0.0 0.0
2004 8535 0.0 0.0 0.0
2005 8311 0.0 0.0 0.0
2006 8372 0.0 0.0 0.0
2007 3269 0.0 0.0 0.0
2008 5205 0.0 0.0 0.0
2009 5485 0.0 0.0 0.0
2018 5 0.0 0.0 0.0
2019 5 0.0 0.0 0.0
2020 1 0.0 0.0 0.0

For data sources see[5]

References