If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0665132707020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.726267,"lon":-115.87228,"icon":""}]} |
Location: 02/07-27-066-13W5/0 | |
Location Alias: 02/07-27-66-13 W5M | |
Location Alias 2: 02/07-27-066-13 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 066 | |
Meridian: 5 | |
Range: 13 | |
Section: 27 | |
County/Municipality: Big Lakes County | |
Well Name: CPEC HZ 102 VIRG 7-27-66-13 | |
Operator Name: Crescent Point Energy Corp. | |
License Number: 0439318 | |
License Date: 2011-11-22 | |
License Status: Issued | |
Spud Date: 2012-03-06 | |
Final Drill Date: 2012-03-30 | |
Well Total Depth: 4528.00 m | |
Surface Hole Latitude: 54.726267 | |
Surface Hole Longitude: -115.872280 |
Date | Event |
---|---|
2011-11-22 | Obtained License |
2012-03-08 | Surface Casing Operation Performed |
2012-03-16 | Direction Drilling Operation Performed - Deviate |
2012-03-18 | Direction Drilling Operation Performed - Horizontal |
2012-03-20 | Intermediate Casing Operation Performed |
2012-03-30 | Finished Drilling |
2012-03-30 | Well Log Performed |
2012-03-30 | Well Mode changed to Drilled and Cased |
2012-04-01 | Liner Casing Operation Performed |
2012-04-02 | Rig Released |
2012-04-02 | Well Log Performed |
2012-07-01 | Well Began Production |
2012-07-01 | Well Fluid changed to Crude Oil |
2012-07-01 | Well Mode changed to Pumping |
2012-08-02 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-08-02 | Perforation Treatment Performed - Open-Hole Completion |
2014-08-16 | Well Log Performed |
2014-10-01 | Well Began Injection |
2014-10-01 | Well Fluid changed to Water |
2014-10-01 | Well Type changed to Injection |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-03-06 | Chinook Drilling Inc. | 8 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-03-16 | 26.00 | Deviate (5 - 79 degrees) |
2012-03-18 | 3020.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-08-02 | Open Hole/Barefoot Completion | 4519.00 | 4528.00 | 0 |
2012-08-02 | Multi-Stage Fracture | 3580.40 | 3850.50 | 0 |
2012-08-02 | Multi-Stage Fracture | 3493.20 | 3793.30 | 0 |
2012-08-02 | Multi-Stage Fracture | 3419.80 | 3419.90 | 0 |
2012-08-02 | Multi-Stage Fracture | 3346.50 | 3346.60 | 0 |
2012-08-02 | Multi-Stage Fracture | 3273.20 | 3273.30 | 0 |
2012-08-02 | Multi-Stage Fracture | 3185.90 | 3186.00 | 0 |
2012-08-02 | Multi-Stage Fracture | 3114.00 | 3114.10 | 0 |
2012-08-02 | Multi-Stage Fracture | 4496.30 | 4496.40 | 0 |
2012-08-02 | Multi-Stage Fracture | 4400.50 | 4400.60 | 0 |
2012-08-02 | Multi-Stage Fracture | 4312.70 | 4312.80 | 0 |
2012-08-02 | Multi-Stage Fracture | 4097.80 | 4097.90 | 0 |
2012-08-02 | Multi-Stage Fracture | 3984.40 | 3984.50 | 0 |
2012-08-02 | Multi-Stage Fracture | 3858.20 | 3858.30 | 0 |
2012-08-02 | Multi-Stage Fracture | 3756.00 | 3756.10 | 0 |
2012-08-02 | Multi-Stage Fracture | 3654.00 | 3654.10 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 2409 | 0.0 | 0.0 | 0.0 |
2013 | 7385 | 0.0 | 0.0 | 0.0 |
2014 | 4871 | 0.0 | 0.0 | 0.0 |
2015 | 0 | 0.0 | 0.0 | 0.0 |
2016 | 0 | 0.0 | 0.0 | 0.0 |
2017 | 0 | 0.0 | 0.0 | 0.0 |
2018 | 0 | 0.0 | 0.0 | 0.0 |
2019 | 0 | 0.0 | 0.0 | 0.0 |
2020 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-04-02 | No Incident Encountered | 0.00 | 0.00 |
2012-08-02 | No Incident Encountered | 0.00 | 0.00 |
2012-04-01 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]