If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0665243008000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.748604,"lon":-117.629512,"icon":""}]} |
Location: 00/08-30-066-24W5/0 | |
Location Alias: 00/08-30-66-24 W5M | |
Location Alias 2: 00/08-30-066-24 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 066 | |
Meridian: 5 | |
Range: 24 | |
Section: 30 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: ARC HZ ANTE 8-30-66-24 | |
Operator Name: ARC Resources Ltd. | |
License Number: 0415272 | |
License Date: 2009-12-07 | |
License Status: Issued | |
Spud Date: 2010-01-20 | |
Final Drill Date: 2010-02-10 | |
Well Total Depth: 3475.00 m | |
Surface Hole Latitude: 54.748604 | |
Surface Hole Longitude: -117.629512 |
Date | Event |
---|---|
2009-12-07 | Obtained License |
2010-01-22 | Surface Casing Operation Performed |
2010-01-26 | Direction Drilling Operation Performed - Horizontal |
2010-02-04 | Intermediate Casing Operation Performed |
2010-02-10 | Finished Drilling |
2010-02-10 | Well Mode changed to Drilled and Cased |
2010-02-13 | Liner Casing Operation Performed |
2010-02-13 | Rig Released |
2010-02-17 | Perforation Treatment Performed - Open-Hole Completion |
2010-02-17 | Well Log Performed |
2010-03-02 | Perforation Treatment Performed - Multi-Stage Fracture |
2010-03-02 | Perforation Treatment Performed - Open-Hole Completion |
2010-07-01 | Well Began Production |
2010-07-01 | Well Fluid changed to Gas |
2010-07-01 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2010-01-26 | 1627.50 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-02-17 | Open Hole/Barefoot Completion | 2067.00 | 3475.00 | 0 |
2010-03-02 | Multi-Stage Fracture | 2409.00 | 2558.00 | 0 |
2010-03-02 | Multi-Stage Fracture | 2271.00 | 2408.00 | 0 |
2010-03-02 | Multi-Stage Fracture | 2145.00 | 2279.00 | 0 |
2010-03-02 | Open Hole/Barefoot Completion | 2145.00 | 3475.00 | 0 |
2010-03-02 | Multi-Stage Fracture | 3390.00 | 3475.00 | 0 |
2010-03-02 | Multi-Stage Fracture | 3255.00 | 3389.00 | 0 |
2010-03-02 | Multi-Stage Fracture | 3118.00 | 3254.00 | 0 |
2010-03-02 | Multi-Stage Fracture | 2978.00 | 3117.00 | 0 |
2010-03-02 | Multi-Stage Fracture | 2840.00 | 2977.00 | 0 |
2010-03-02 | Multi-Stage Fracture | 2699.00 | 2839.00 | 0 |
2010-03-02 | Multi-Stage Fracture | 2559.00 | 2698.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 3833 | 0.0 | 0.0 | 0.0 |
2011 | 7472 | 0.0 | 0.0 | 0.0 |
2012 | 7917 | 0.0 | 0.0 | 0.0 |
2013 | 8114 | 0.0 | 0.0 | 0.0 |
2014 | 4093 | 0.0 | 0.0 | 0.0 |
2015 | 7207 | 0.0 | 0.0 | 0.0 |
2016 | 8131 | 0.0 | 0.0 | 0.0 |
2017 | 8520 | 0.0 | 0.0 | 0.0 |
2018 | 8283 | 0.0 | 0.0 | 0.0 |
2019 | 7006 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]