X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0665252315003

Well Details

Well ID: 0665252315003
Loading map...
Location: 00/15-23-066-25W5/3
Location Alias: 00/15-23-66-25 W5M
Location Alias 2: 00/15-23-066-25 W5/03
Country: Canada
Province: Alberta
Township: 066
Meridian: 5
Range: 25
Section: 23
County/Municipality: Municipal District of Greenview No. 16
Well Name: ARC HZ ANTEN 15-23-66-25
Operator Name: ARC Resources Ltd.
License Number: 0415107
License Date: 2009-12-03
License Status: Amended
Spud Date: 2010-02-15
Final Drill Date: 2010-03-08
Well Total Depth: 3246.00 m
Surface Hole Latitude: 54.740837
Surface Hole Longitude: -117.649009

For data sources see[1][2]

Well History

Date Event
2009-12-03 Obtained License
2010-02-16 Surface Casing Operation Performed
2010-02-19 Direction Drilling Operation Performed - Horizontal
2010-02-26 Intermediate Casing Operation Performed
2010-03-02 Direction Drilling Operation Performed - Horizontal
2010-03-08 Finished Drilling
2010-03-08 Well Log Performed
2010-03-08 Well Mode changed to Drilled and Cased
2010-03-10 Liner Casing Operation Performed
2010-03-11 Rig Released
2010-06-23 Perforation Treatment Performed - Open-Hole Completion
2010-06-24 Perforation Treatment Performed - Multi-Stage Fracture
2010-06-24 Perforation Treatment Performed - Open-Hole Completion
2010-07-01 Well Began Production
2010-07-01 Well Fluid changed to Crude Oil
2010-07-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-02-19 1739.00 Horizontal
2010-03-02 2082.63 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-06-23 Open Hole/Barefoot Completion 2067.00 3246.00 0
2010-06-24 Open Hole/Barefoot Completion 2067.00 3246.00 0
2010-06-24 Multi-Stage Fracture 3180.70 3180.80 0
2010-06-24 Multi-Stage Fracture 3029.90 3030.00 0
2010-06-24 Multi-Stage Fracture 2891.00 2891.10 0
2010-06-24 Multi-Stage Fracture 2753.40 2753.50 0
2010-06-24 Multi-Stage Fracture 2600.90 2601.00 0
2010-06-24 Multi-Stage Fracture 2460.60 2460.70 0
2010-06-24 Multi-Stage Fracture 2321.30 2321.40 0
2010-06-24 Multi-Stage Fracture 2116.40 2116.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 2503 0.0 0.0 0.0
2011 7337 0.0 0.0 0.0
2012 7738 0.0 0.0 0.0
2013 7484 0.0 0.0 0.0
2014 8017 0.0 0.0 0.0
2015 6891 0.0 0.0 0.0
2016 6212 0.0 0.0 0.0
2017 8639 0.0 0.0 0.0
2018 6428 0.0 0.0 0.0
2019 7707 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2010-06-24 No Incident Encountered 0.00 0.00

For data sources see[7]

References