X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0666051004000

Well Details

Well ID: 0666051004000
Loading map...
Location: 00/04-10-066-05W6/0
Location Alias: 00/04-10-66-05 W6M
Location Alias 2: 00/04-10-066-05 W6/00
Country: Canada
Province: Alberta
Township: 066
Meridian: 6
Range: 05
Section: 10
County/Municipality: Municipal District of Greenview No. 16
Well Name: PARA HZ KARR 4-10-66-5
Operator Name: Paramount Resources Ltd.
License Number: 0412544
License Date: 2009-09-23
License Status: Amended
Spud Date: 2010-01-29
Final Drill Date: 2010-03-12
Well Total Depth: 4232.00 m
Surface Hole Latitude: 54.704946
Surface Hole Longitude: -118.677083

For data sources see[1][2]

Well History

Date Event
2009-09-23 Obtained License
2010-02-01 Surface Casing Operation Performed
2010-02-14 Direction Drilling Operation Performed - Horizontal
2010-02-26 Intermediate Casing Operation Performed
2010-03-12 Finished Drilling
2010-03-12 Well Log Performed
2010-03-12 Well Mode changed to Drilled and Cased
2010-03-14 Well Log Performed
2010-03-15 Liner Casing Operation Performed
2010-03-15 Perforation Treatment Performed - Open-Hole Completion
2010-03-16 Rig Released
2010-03-27 Perforation Treatment Performed - Multi-Stage Fracture
2010-08-04 Well Began Production
2010-08-04 Well Fluid changed to Gas
2010-08-04 Well Mode changed to Flowing
2011-09-10 Well Fluid changed to Gas
2011-09-10 Well Mode changed to Pumping
2014-10-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-10-22 Plug Back Performed
2014-10-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-10-24 Plug Back Performed
2014-10-24 Well Fluid changed to Gas
2014-10-24 Well Mode changed to Abandoned Zone

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-02-14 2655.20 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-03-15 Open Hole/Barefoot Completion 4221.00 4232.00 0
2010-03-27 Multi-Stage Fracture 3657.80 3658.60 0
2010-03-27 Multi-Stage Fracture 3588.00 3588.80 0
2010-03-27 Multi-Stage Fracture 3516.20 3517.00 0
2010-03-27 Multi-Stage Fracture 3457.80 3458.60 0
2010-03-27 Multi-Stage Fracture 3387.90 3388.70 0
2010-03-27 Multi-Stage Fracture 3329.50 3330.30 0
2010-03-27 Multi-Stage Fracture 3257.50 3258.30 0
2010-03-27 Multi-Stage Fracture 3198.70 3199.50 0
2010-03-27 Multi-Stage Fracture 3129.30 3130.10 0
2014-10-22 Packing Device Capped w/Cement 2992.00 3000.00 0
2010-03-27 Multi-Stage Fracture 4198.70 4200.00 0
2014-10-24 Packing Device Capped w/Cement 2862.00 2870.00 0
2010-03-27 Multi-Stage Fracture 4120.50 4121.30 0
2010-03-27 Multi-Stage Fracture 4048.60 4049.40 0
2010-03-27 Multi-Stage Fracture 3976.80 3977.60 0
2010-03-27 Multi-Stage Fracture 3918.20 3919.00 0
2010-03-27 Multi-Stage Fracture 3846.60 3847.40 0
2010-03-27 Multi-Stage Fracture 3788.20 3789.00 0
2010-03-27 Multi-Stage Fracture 3716.30 3717.10 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 1993 0.0 0.0 0.0
2011 1431 0.0 0.0 0.0
2012 4447 0.0 0.0 0.0
2013 459 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-05-27 No Incident Encountered 0.00 0.00
2014-10-24 No Incident Encountered 0.00 0.00

For data sources see[7]

References