X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0666051415000

Well Details

Well ID: 0666051415000
Loading map...
Location: 00/15-14-066-05W6/0
Location Alias: 00/15-14-66-05 W6M
Location Alias 2: 00/15-14-066-05 W6/00
Country: Canada
Province: Alberta
Township: 066
Meridian: 6
Range: 05
Section: 14
County/Municipality: Municipal District of Greenview No. 16
Well Name: PARA HZ KARR 15-14-66-5
Operator Name: Paramount Resources Ltd.
License Number: 0411247
License Date: 2009-06-30
License Status: Amended
Spud Date: 2009-08-01
Final Drill Date: 2009-09-17
Well Total Depth: 4784.00 m
Surface Hole Latitude: 54.700495
Surface Hole Longitude: -118.633914

For data sources see[1][2]

Well History

Date Event
2009-06-30 Obtained License
2009-08-07 Surface Casing Operation Performed
2009-08-28 Direction Drilling Operation Performed - Horizontal
2009-08-29 Well Log Performed
2009-08-30 Intermediate Casing Operation Performed
2009-08-30 Well Log Performed
2009-09-01 Well Log Performed
2009-09-08 Well Log Performed
2009-09-17 Finished Drilling
2009-09-17 Perforation Treatment Performed - Open-Hole Completion
2009-09-17 Well Log Performed
2009-09-17 Well Mode changed to Drilled and Cased
2009-09-18 Well Log Performed
2009-09-20 Liner Casing Operation Performed
2009-09-22 Rig Released
2009-10-07 Perforation Treatment Performed - Multi-Stage Fracture
2009-10-08 Perforation Treatment Performed - Multi-Stage Fracture
2009-11-30 Well Began Production
2009-11-30 Well Fluid changed to Gas
2009-11-30 Well Mode changed to Flowing
2010-12-01 Well Fluid changed to Gas
2010-12-01 Well Mode changed to Pumping
2013-02-01 Well Fluid changed to Gas
2013-02-01 Well Mode changed to Suspended
2013-05-04 Well Log Performed
2013-05-05 Well Log Performed
2013-05-07 Perforation Treatment Performed - Cement Plug
2013-05-07 Plug Back Performed
2013-05-07 Well Fluid changed to Gas
2013-05-07 Well Mode changed to Abandoned Zone

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2009-08-28 3028.40 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2009-09-17 Open Hole/Barefoot Completion 4779.00 4784.00 0
2009-10-08 Multi-Stage Fracture 3886.70 3887.50 0
2009-10-08 Multi-Stage Fracture 3788.20 3789.00 0
2009-10-08 Multi-Stage Fracture 3687.90 3688.70 0
2009-10-08 Multi-Stage Fracture 3574.90 3575.70 0
2009-10-08 Multi-Stage Fracture 3474.90 3475.70 0
2009-10-08 Multi-Stage Fracture 3375.20 3376.00 0
2009-10-08 Multi-Stage Fracture 3278.00 3278.80 0
2009-10-08 Multi-Stage Fracture 3166.10 3166.90 0
2013-05-07 Cement Plug 2740.00 3000.00 0
2009-10-07 Multi-Stage Fracture 4730.10 4730.90 0
2009-10-07 Multi-Stage Fracture 4610.70 4611.50 0
2009-10-07 Multi-Stage Fracture 4512.50 4513.30 0
2009-10-07 Multi-Stage Fracture 4399.50 4400.30 0
2009-10-07 Multi-Stage Fracture 4300.10 4300.90 0
2009-10-08 Multi-Stage Fracture 4199.70 4200.50 0
2009-10-08 Multi-Stage Fracture 4100.50 4101.30 0
2009-10-08 Multi-Stage Fracture 3986.80 3987.60 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2009 684 0.0 0.0 0.0
2010 6532 0.0 0.0 0.0
2011 2987 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-05-09 No Incident Encountered 0.00 0.00
2013-10-22 No Incident Encountered 0.00 0.00

For data sources see[7]

References