If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0666051415000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.700495,"lon":-118.633914,"icon":""}]} |
| Location: 00/15-14-066-05W6/0 | |
| Location Alias: 00/15-14-66-05 W6M | |
| Location Alias 2: 00/15-14-066-05 W6/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 066 | |
| Meridian: 6 | |
| Range: 05 | |
| Section: 14 | |
| County/Municipality: Municipal District of Greenview No. 16 | |
| Well Name: PARA HZ KARR 15-14-66-5 | |
| Operator Name: Paramount Resources Ltd. | |
| License Number: 0411247 | |
| License Date: 2009-06-30 | |
| License Status: Amended | |
| Spud Date: 2009-08-01 | |
| Final Drill Date: 2009-09-17 | |
| Well Total Depth: 4784.00 m | |
| Surface Hole Latitude: 54.700495 | |
| Surface Hole Longitude: -118.633914 |
| Date | Event |
|---|---|
| 2009-06-30 | Obtained License |
| 2009-08-07 | Surface Casing Operation Performed |
| 2009-08-28 | Direction Drilling Operation Performed - Horizontal |
| 2009-08-29 | Well Log Performed |
| 2009-08-30 | Intermediate Casing Operation Performed |
| 2009-08-30 | Well Log Performed |
| 2009-09-01 | Well Log Performed |
| 2009-09-08 | Well Log Performed |
| 2009-09-17 | Finished Drilling |
| 2009-09-17 | Perforation Treatment Performed - Open-Hole Completion |
| 2009-09-17 | Well Log Performed |
| 2009-09-17 | Well Mode changed to Drilled and Cased |
| 2009-09-18 | Well Log Performed |
| 2009-09-20 | Liner Casing Operation Performed |
| 2009-09-22 | Rig Released |
| 2009-10-07 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2009-10-08 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2009-11-30 | Well Began Production |
| 2009-11-30 | Well Fluid changed to Gas |
| 2009-11-30 | Well Mode changed to Flowing |
| 2010-12-01 | Well Fluid changed to Gas |
| 2010-12-01 | Well Mode changed to Pumping |
| 2013-02-01 | Well Fluid changed to Gas |
| 2013-02-01 | Well Mode changed to Suspended |
| 2013-05-04 | Well Log Performed |
| 2013-05-05 | Well Log Performed |
| 2013-05-07 | Perforation Treatment Performed - Cement Plug |
| 2013-05-07 | Plug Back Performed |
| 2013-05-07 | Well Fluid changed to Gas |
| 2013-05-07 | Well Mode changed to Abandoned Zone |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2009-08-28 | 3028.40 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2009-09-17 | Open Hole/Barefoot Completion | 4779.00 | 4784.00 | 0 |
| 2009-10-08 | Multi-Stage Fracture | 3886.70 | 3887.50 | 0 |
| 2009-10-08 | Multi-Stage Fracture | 3788.20 | 3789.00 | 0 |
| 2009-10-08 | Multi-Stage Fracture | 3687.90 | 3688.70 | 0 |
| 2009-10-08 | Multi-Stage Fracture | 3574.90 | 3575.70 | 0 |
| 2009-10-08 | Multi-Stage Fracture | 3474.90 | 3475.70 | 0 |
| 2009-10-08 | Multi-Stage Fracture | 3375.20 | 3376.00 | 0 |
| 2009-10-08 | Multi-Stage Fracture | 3278.00 | 3278.80 | 0 |
| 2009-10-08 | Multi-Stage Fracture | 3166.10 | 3166.90 | 0 |
| 2013-05-07 | Cement Plug | 2740.00 | 3000.00 | 0 |
| 2009-10-07 | Multi-Stage Fracture | 4730.10 | 4730.90 | 0 |
| 2009-10-07 | Multi-Stage Fracture | 4610.70 | 4611.50 | 0 |
| 2009-10-07 | Multi-Stage Fracture | 4512.50 | 4513.30 | 0 |
| 2009-10-07 | Multi-Stage Fracture | 4399.50 | 4400.30 | 0 |
| 2009-10-07 | Multi-Stage Fracture | 4300.10 | 4300.90 | 0 |
| 2009-10-08 | Multi-Stage Fracture | 4199.70 | 4200.50 | 0 |
| 2009-10-08 | Multi-Stage Fracture | 4100.50 | 4101.30 | 0 |
| 2009-10-08 | Multi-Stage Fracture | 3986.80 | 3987.60 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2009 | 684 | 0.0 | 0.0 | 0.0 |
| 2010 | 6532 | 0.0 | 0.0 | 0.0 |
| 2011 | 2987 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2013-05-09 | No Incident Encountered | 0.00 | 0.00 |
| 2013-10-22 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]