If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0666051516020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.703883,"lon":-118.653675,"icon":""}]} |
| Location: 02/16-15-066-05W6/0 | |
| Location Alias: 02/16-15-66-05 W6M | |
| Location Alias 2: 02/16-15-066-05 W6/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 066 | |
| Meridian: 6 | |
| Range: 05 | |
| Section: 15 | |
| County/Municipality: Municipal District of Greenview No. 16 | |
| Well Name: PARA HZ 102 KARR 16-15-66-5 | |
| Operator Name: Paramount Resources Ltd. | |
| License Number: 0423507 | |
| License Date: 2010-09-15 | |
| License Status: Amended | |
| Spud Date: 2010-09-20 | |
| Final Drill Date: 2010-11-02 | |
| Well Total Depth: 4673.00 m | |
| Surface Hole Latitude: 54.703883 | |
| Surface Hole Longitude: -118.653675 |
| Date | Event |
|---|---|
| 2010-09-15 | Obtained License |
| 2010-09-16 | Conductor Casing Operation Performed |
| 2010-09-23 | Surface Casing Operation Performed |
| 2010-10-03 | Direction Drilling Operation Performed - Horizontal |
| 2010-10-12 | Well Log Performed |
| 2010-10-15 | Intermediate Casing Operation Performed |
| 2010-10-15 | Well Log Performed |
| 2010-10-17 | Well Log Performed |
| 2010-11-02 | Finished Drilling |
| 2010-11-02 | Well Log Performed |
| 2010-11-02 | Well Mode changed to Drilled and Cased |
| 2010-11-05 | Liner Casing Operation Performed |
| 2010-11-05 | Perforation Treatment Performed - Open-Hole Completion |
| 2010-11-05 | Well Log Performed |
| 2010-11-06 | Rig Released |
| 2010-11-21 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2010-11-22 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2010-12-24 | Well Began Production |
| 2010-12-24 | Well Fluid changed to Gas |
| 2010-12-24 | Well Mode changed to Flowing |
| 2013-02-01 | Well Fluid changed to Gas |
| 2013-02-01 | Well Mode changed to Suspended |
| 2013-09-30 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2013-09-30 | Plug Back Performed |
| 2013-09-30 | Well Fluid changed to Gas |
| 2013-09-30 | Well Log Performed |
| 2013-09-30 | Well Mode changed to Abandoned Zone |
| 2013-10-07 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2013-10-07 | Plug Back Performed |
| 2013-10-07 | Well Log Performed |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2010-10-03 | 2703.60 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2010-11-05 | Open Hole/Barefoot Completion | 4668.00 | 4673.00 | 0 |
| 2010-11-21 | Multi-Stage Fracture | 4059.20 | 4060.00 | 0 |
| 2010-11-21 | Multi-Stage Fracture | 3996.30 | 3997.10 | 0 |
| 2010-11-21 | Multi-Stage Fracture | 3921.60 | 3922.40 | 0 |
| 2010-11-21 | Multi-Stage Fracture | 3847.20 | 3848.00 | 0 |
| 2010-11-21 | Multi-Stage Fracture | 3784.10 | 3784.90 | 0 |
| 2010-11-21 | Multi-Stage Fracture | 3709.60 | 3710.40 | 0 |
| 2010-11-21 | Multi-Stage Fracture | 3646.50 | 3647.30 | 0 |
| 2010-11-21 | Multi-Stage Fracture | 3571.80 | 3572.60 | 0 |
| 2010-11-21 | Multi-Stage Fracture | 3497.40 | 3498.20 | 0 |
| 2010-11-22 | Multi-Stage Fracture | 3429.90 | 3430.70 | 0 |
| 2010-11-21 | Multi-Stage Fracture | 4632.40 | 4633.20 | 0 |
| 2010-11-22 | Multi-Stage Fracture | 3360.10 | 3360.90 | 0 |
| 2010-11-22 | Multi-Stage Fracture | 3290.30 | 3291.10 | 0 |
| 2010-11-22 | Multi-Stage Fracture | 3218.30 | 3219.10 | 0 |
| 2010-11-22 | Multi-Stage Fracture | 3148.50 | 3149.30 | 0 |
| 2013-09-30 | Packing Device Capped w/Cement | 2892.00 | 2900.00 | 0 |
| 2013-10-07 | Packing Device Capped w/Cement | 2835.00 | 2843.00 | 0 |
| 2010-11-21 | Multi-Stage Fracture | 4554.20 | 4555.00 | 0 |
| 2010-11-21 | Multi-Stage Fracture | 4484.10 | 4484.90 | 0 |
| 2010-11-21 | Multi-Stage Fracture | 4409.40 | 4410.20 | 0 |
| 2010-11-21 | Multi-Stage Fracture | 4346.20 | 4347.00 | 0 |
| 2010-11-21 | Multi-Stage Fracture | 4271.50 | 4272.30 | 0 |
| 2010-11-21 | Multi-Stage Fracture | 4196.80 | 4197.60 | 0 |
| 2010-11-21 | Multi-Stage Fracture | 4133.70 | 4134.50 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2010 | 186 | 0.0 | 0.0 | 0.0 |
| 2011 | 6670 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2013-10-07 | No Incident Encountered | 0.00 | 0.00 |
| 2013-11-28 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]