X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0666052416000

Well Details

Well ID: 0666052416000
Loading map...
Location: 00/16-24-066-05W6/0
Location Alias: 00/16-24-66-05 W6M
Location Alias 2: 00/16-24-066-05 W6/00
Country: Canada
Province: Alberta
Township: 066
Meridian: 6
Range: 05
Section: 24
County/Municipality: Municipal District of Greenview No. 16
Well Name: PARA HZ KARR 16-24-66-5
Operator Name: Paramount Resources Ltd.
License Number: 0480641
License Date: 2016-10-03
License Status: Amended
Spud Date: 2016-12-04
Final Drill Date: 2017-02-04
Well Total Depth: 5993.00 m
Surface Hole Latitude: 54.703324
Surface Hole Longitude: -118.600703

For data sources see[1][2]

Well History

Date Event
2016-10-03 Obtained License
2016-12-05 Surface Casing Operation Performed
2016-12-13 Direction Drilling Operation Performed - Deviate
2016-12-15 Intermediate Casing Operation Performed
2017-01-22 Direction Drilling Operation Performed - Horizontal
2017-02-04 Finished Drilling
2017-02-04 Well Log Performed
2017-02-04 Well Mode changed to Drilled and Cased
2017-02-08 Production Casing Operation Performed
2017-02-10 Rig Released
2017-04-25 Perforation Treatment Performed - Multi-Stage Fracture
2017-04-26 Perforation Treatment Performed - Multi-Stage Fracture
2017-04-27 Perforation Treatment Performed - Multi-Stage Fracture
2017-05-08 Perforation Treatment Performed - Jet Perforation
2017-05-08 Perforation Treatment Performed - Multi-Stage Fracture
2017-05-09 Perforation Treatment Performed - Jet Perforation
2017-05-09 Perforation Treatment Performed - Multi-Stage Fracture
2017-05-10 Perforation Treatment Performed - Jet Perforation
2017-05-10 Perforation Treatment Performed - Multi-Stage Fracture
2017-05-11 Perforation Treatment Performed - Jet Perforation
2017-05-11 Perforation Treatment Performed - Multi-Stage Fracture
2017-05-12 Perforation Treatment Performed - Jet Perforation
2017-05-12 Perforation Treatment Performed - Multi-Stage Fracture
2017-05-13 Perforation Treatment Performed - Jet Perforation
2017-05-13 Perforation Treatment Performed - Multi-Stage Fracture
2017-05-14 Perforation Treatment Performed - Jet Perforation
2017-05-14 Perforation Treatment Performed - Multi-Stage Fracture
2017-05-15 Perforation Treatment Performed - Jet Perforation
2017-05-15 Perforation Treatment Performed - Multi-Stage Fracture
2017-05-16 Perforation Treatment Performed - Jet Perforation
2017-05-16 Perforation Treatment Performed - Multi-Stage Fracture
2017-05-17 Perforation Treatment Performed - Jet Perforation
2017-05-17 Perforation Treatment Performed - Multi-Stage Fracture
2017-05-18 Perforation Treatment Performed - Jet Perforation
2017-05-18 Perforation Treatment Performed - Multi-Stage Fracture
2017-05-19 Perforation Treatment Performed - Jet Perforation
2017-05-20 Perforation Treatment Performed - Jet Perforation
2017-05-20 Perforation Treatment Performed - Multi-Stage Fracture
2017-05-21 Perforation Treatment Performed - Jet Perforation
2017-05-21 Perforation Treatment Performed - Multi-Stage Fracture
2017-05-22 Perforation Treatment Performed - Jet Perforation
2017-05-22 Perforation Treatment Performed - Multi-Stage Fracture
2017-05-23 Perforation Treatment Performed - Jet Perforation
2017-05-23 Perforation Treatment Performed - Multi-Stage Fracture
2017-05-24 Perforation Treatment Performed - Jet Perforation
2017-05-24 Perforation Treatment Performed - Multi-Stage Fracture
2017-05-25 Perforation Treatment Performed - Jet Perforation
2017-05-25 Perforation Treatment Performed - Multi-Stage Fracture
2017-05-26 Perforation Treatment Performed - Jet Perforation
2017-05-26 Perforation Treatment Performed - Multi-Stage Fracture
2017-05-27 Perforation Treatment Performed - Jet Perforation
2017-05-27 Perforation Treatment Performed - Multi-Stage Fracture
2017-05-28 Perforation Treatment Performed - Jet Perforation
2017-05-28 Perforation Treatment Performed - Multi-Stage Fracture
2017-05-29 Perforation Treatment Performed - Jet Perforation
2017-05-29 Perforation Treatment Performed - Multi-Stage Fracture
2017-05-30 Perforation Treatment Performed - Jet Perforation
2017-05-30 Perforation Treatment Performed - Multi-Stage Fracture
2017-05-31 Perforation Treatment Performed - Jet Perforation
2017-05-31 Perforation Treatment Performed - Multi-Stage Fracture
2017-06-01 Perforation Treatment Performed - Jet Perforation
2017-06-01 Perforation Treatment Performed - Multi-Stage Fracture
2017-06-02 Perforation Treatment Performed - Jet Perforation
2017-06-02 Perforation Treatment Performed - Multi-Stage Fracture
2017-06-03 Perforation Treatment Performed - Jet Perforation
2017-06-03 Perforation Treatment Performed - Multi-Stage Fracture
2017-06-26 Well Began Production
2017-06-26 Well Fluid changed to Gas
2017-06-26 Well Mode changed to Flowing
2019-02-21 Well Fluid changed to Gas
2019-02-21 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2016-12-04 Fox Drilling Inc. 6 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2016-12-13 764.00 Deviate (5 - 79 degrees)
2017-01-22 2825.90 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-04-25 Multi-Stage Fracture 5922.50 5939.10 0
2017-04-26 Multi-Stage Fracture 5549.70 5549.80 0
2017-05-14 Multi-Stage Fracture 4487.00 4514.00 0
2017-05-15 Perforation 4473.00 4474.00 20
2017-05-15 Perforation 4460.00 4461.00 20
2017-05-15 Perforation 4447.00 4448.00 20
2017-05-15 Multi-Stage Fracture 4447.00 4474.00 0
2017-05-15 Perforation 4430.00 4431.00 20
2017-05-15 Perforation 4417.00 4418.00 20
2017-05-15 Perforation 4409.20 4410.20 20
2017-05-15 Multi-Stage Fracture 4409.20 4431.00 0
2017-05-15 Perforation 4392.00 4393.00 20
2017-04-26 Multi-Stage Fracture 5508.30 5508.40 0
2017-05-15 Perforation 4380.00 4381.00 20
2017-05-15 Perforation 4367.00 4368.00 20
2017-05-15 Multi-Stage Fracture 4367.00 4393.00 0
2017-05-16 Perforation 4353.00 4354.00 20
2017-05-16 Perforation 4340.00 4341.00 20
2017-05-16 Perforation 4327.00 4328.00 20
2017-05-16 Multi-Stage Fracture 4327.00 4354.00 0
2017-05-16 Perforation 4308.10 4309.10 20
2017-05-16 Perforation 4296.80 4297.80 20
2017-05-16 Perforation 4285.40 4286.40 20
2017-04-26 Multi-Stage Fracture 5466.80 5466.90 0
2017-05-17 Multi-Stage Fracture 4285.40 4309.10 0
2017-05-17 Perforation 4273.00 4274.00 20
2017-05-17 Perforation 4260.00 4261.00 20
2017-05-17 Perforation 4247.00 4248.00 20
2017-05-17 Multi-Stage Fracture 4247.00 4274.00 0
2017-05-17 Perforation 4233.00 4234.00 20
2017-05-17 Perforation 4220.00 4221.00 20
2017-05-17 Perforation 4207.00 4208.00 20
2017-05-18 Multi-Stage Fracture 4207.00 4234.00 0
2017-05-18 Perforation 4190.00 4191.00 20
2017-04-27 Multi-Stage Fracture 5425.30 5425.40 0
2017-05-18 Perforation 4177.00 4178.00 20
2017-05-18 Perforation 4166.00 4167.00 20
2017-05-18 Multi-Stage Fracture 4166.00 4191.00 0
2017-05-18 Perforation 4153.00 4154.00 20
2017-05-18 Perforation 4140.00 4141.00 20
2017-05-18 Perforation 4127.00 4128.00 20
2017-05-18 Multi-Stage Fracture 4127.00 4154.00 0
2017-05-19 Perforation 4112.00 4113.00 20
2017-05-19 Perforation 4099.00 4100.00 20
2017-05-19 Perforation 4086.00 4087.00 20
2017-04-27 Multi-Stage Fracture 5384.50 5384.60 0
2017-05-20 Multi-Stage Fracture 4086.00 4113.00 0
2017-05-20 Perforation 4073.00 4074.00 20
2017-05-20 Perforation 4060.00 4061.00 20
2017-05-20 Perforation 4047.00 4048.00 20
2017-05-20 Multi-Stage Fracture 4047.00 4074.00 0
2017-05-20 Perforation 4033.00 4034.00 20
2017-05-20 Perforation 4020.00 4021.00 20
2017-05-20 Perforation 4007.00 4008.00 20
2017-05-20 Multi-Stage Fracture 4007.00 4034.00 0
2017-05-21 Perforation 3996.50 3997.00 20
2017-04-27 Multi-Stage Fracture 5343.00 5343.10 0
2017-05-21 Perforation 3990.00 3990.50 20
2017-05-21 Perforation 3983.50 3984.00 20
2017-05-21 Perforation 3977.00 3977.50 20
2017-05-21 Perforation 3970.50 3971.00 20
2017-05-21 Perforation 3964.00 3964.50 20
2017-05-21 Multi-Stage Fracture 3964.00 3997.00 0
2017-05-21 Perforation 3956.50 3957.00 20
2017-05-21 Perforation 3950.00 3950.50 20
2017-05-21 Perforation 3943.50 3944.00 20
2017-05-21 Perforation 3936.50 3937.00 20
2017-04-27 Multi-Stage Fracture 5301.50 5301.60 0
2017-05-21 Perforation 3930.50 3931.00 20
2017-05-21 Perforation 3923.50 3924.00 20
2017-05-21 Multi-Stage Fracture 3923.50 3957.00 0
2017-05-21 Perforation 3916.50 3917.00 20
2017-05-21 Perforation 3910.00 3910.50 20
2017-05-21 Perforation 3903.50 3904.00 20
2017-05-21 Perforation 3897.00 3897.50 20
2017-05-21 Perforation 3890.50 3891.00 20
2017-05-21 Perforation 3884.00 3884.50 20
2017-05-22 Multi-Stage Fracture 3884.00 3917.00 0
2017-05-08 Perforation 5260.00 5261.00 20
2017-05-22 Perforation 3876.50 3877.00 20
2017-05-22 Perforation 3870.00 3870.50 20
2017-05-22 Perforation 3863.50 3864.00 20
2017-05-22 Perforation 3857.00 3857.50 20
2017-05-22 Perforation 3850.50 3851.00 20
2017-05-22 Perforation 3844.00 3844.50 20
2017-05-22 Multi-Stage Fracture 3844.00 3877.00 0
2017-05-22 Perforation 3836.50 3837.00 20
2017-05-22 Perforation 3829.00 3829.50 20
2017-05-22 Perforation 3823.50 3824.00 20
2017-05-08 Perforation 5256.00 5257.00 20
2017-05-22 Perforation 3816.00 3816.50 20
2017-05-22 Perforation 3810.50 3811.00 20
2017-05-22 Perforation 3806.00 3806.50 20
2017-05-23 Multi-Stage Fracture 3806.00 3837.00 0
2017-05-23 Perforation 3796.50 3797.00 20
2017-05-23 Perforation 3790.00 3790.50 20
2017-05-23 Perforation 3783.50 3784.00 20
2017-05-23 Perforation 3777.00 3777.50 20
2017-05-23 Perforation 3770.50 3771.00 20
2017-05-23 Perforation 3764.00 3764.50 20
2017-05-08 Multi-Stage Fracture 5256.00 5261.00 0
2017-05-23 Multi-Stage Fracture 3764.00 3797.00 0
2017-05-23 Perforation 3753.00 3753.50 20
2017-05-23 Perforation 3740.00 3740.50 20
2017-05-23 Perforation 3727.00 3727.50 20
2017-05-24 Multi-Stage Fracture 3727.00 3753.50 0
2017-05-24 Perforation 3713.00 3713.50 20
2017-05-24 Perforation 3700.00 3700.50 20
2017-05-24 Perforation 3687.00 3687.50 20
2017-05-24 Multi-Stage Fracture 3687.00 3713.50 0
2017-05-25 Perforation 3673.00 3673.50 20
2017-04-25 Multi-Stage Fracture 5881.10 5881.20 0
2017-05-08 Perforation 5221.00 5222.00 20
2017-05-25 Perforation 3660.00 3660.50 20
2017-05-25 Perforation 3647.00 3647.50 20
2017-05-25 Multi-Stage Fracture 3647.00 3673.50 0
2017-05-25 Perforation 3633.00 3633.50 20
2017-05-25 Perforation 3620.00 3620.50 20
2017-05-25 Perforation 3607.00 3607.50 20
2017-05-26 Multi-Stage Fracture 3607.00 3633.50 0
2017-05-26 Perforation 3593.00 3593.50 20
2017-05-26 Perforation 3580.00 3580.50 20
2017-05-26 Perforation 3567.00 3567.50 20
2017-05-08 Perforation 5216.00 5217.00 20
2017-05-26 Multi-Stage Fracture 3567.00 3593.50 0
2017-05-26 Perforation 3553.00 3553.50 20
2017-05-26 Perforation 3540.00 3540.50 20
2017-05-26 Perforation 3527.00 3527.50 20
2017-05-26 Multi-Stage Fracture 3527.00 3553.50 0
2017-05-27 Perforation 3510.00 3511.00 20
2017-05-27 Perforation 3498.00 3499.00 20
2017-05-27 Perforation 3488.90 3489.90 20
2017-05-27 Multi-Stage Fracture 3488.90 3511.00 0
2017-05-27 Perforation 3473.00 3474.00 20
2017-05-08 Multi-Stage Fracture 5216.00 5222.00 0
2017-05-27 Perforation 3460.00 3461.00 20
2017-05-27 Perforation 3447.00 3448.00 20
2017-05-27 Multi-Stage Fracture 3447.00 3474.00 0
2017-05-27 Perforation 3433.00 3434.00 20
2017-05-27 Perforation 3420.00 3421.00 20
2017-05-27 Perforation 3407.00 3408.00 20
2017-05-28 Multi-Stage Fracture 3407.00 3434.00 0
2017-05-28 Perforation 3393.00 3394.00 20
2017-05-28 Perforation 3380.00 3381.00 20
2017-05-28 Perforation 3367.00 3368.00 20
2017-05-08 Perforation 5181.00 5182.00 20
2017-05-28 Multi-Stage Fracture 3367.00 3394.00 0
2017-05-28 Perforation 3353.00 3354.00 20
2017-05-28 Perforation 3340.00 3341.00 20
2017-05-28 Perforation 3327.00 3328.00 20
2017-05-28 Multi-Stage Fracture 3327.00 3354.00 0
2017-05-28 Perforation 3313.00 3314.00 20
2017-05-28 Perforation 3301.00 3302.00 20
2017-05-28 Perforation 3286.00 3287.00 20
2017-05-29 Multi-Stage Fracture 3286.00 3314.00 0
2017-05-29 Perforation 3276.50 3277.00 20
2017-05-08 Perforation 5176.00 5177.00 20
2017-05-29 Perforation 3270.00 3270.50 20
2017-05-29 Perforation 3263.50 3264.00 20
2017-05-29 Perforation 3257.00 3257.50 20
2017-05-29 Perforation 3250.50 3251.00 20
2017-05-29 Multi-Stage Fracture 3250.50 3277.00 0
2017-05-29 Perforation 3236.50 3237.00 20
2017-05-29 Perforation 3230.00 3230.50 20
2017-05-29 Perforation 3223.50 3224.00 20
2017-05-29 Perforation 3217.00 3217.50 20
2017-05-29 Perforation 3210.50 3211.00 20
2017-05-08 Multi-Stage Fracture 5176.00 5182.00 0
2017-05-29 Perforation 3204.00 3204.50 20
2017-05-29 Multi-Stage Fracture 3204.00 3237.00 0
2017-05-30 Perforation 3196.50 3197.00 20
2017-05-30 Perforation 3190.00 3190.50 20
2017-05-30 Perforation 3183.50 3184.00 20
2017-05-30 Perforation 3177.00 3177.50 20
2017-05-30 Perforation 3170.50 3171.00 20
2017-05-30 Perforation 3164.00 3164.50 20
2017-05-30 Multi-Stage Fracture 3164.00 3197.00 0
2017-05-30 Perforation 3156.50 3157.00 20
2017-05-09 Perforation 5141.00 5142.00 20
2017-05-30 Perforation 3150.00 3150.50 20
2017-05-30 Perforation 3143.50 3144.00 20
2017-05-30 Perforation 3137.00 3137.50 20
2017-05-30 Perforation 3130.50 3131.00 20
2017-05-30 Perforation 3124.00 3124.50 20
2017-05-30 Multi-Stage Fracture 3124.00 3157.00 0
2017-05-31 Perforation 3116.50 3117.00 20
2017-05-31 Perforation 3110.00 3110.50 20
2017-05-31 Perforation 3103.50 3104.00 20
2017-05-31 Perforation 3097.00 3097.50 20
2017-05-09 Perforation 5136.00 5137.00 20
2017-05-31 Perforation 3090.50 3091.00 20
2017-05-31 Perforation 3084.00 3084.50 20
2017-05-31 Multi-Stage Fracture 3084.00 3117.00 0
2017-05-31 Perforation 3076.50 3077.00 20
2017-05-31 Perforation 3070.00 3070.50 20
2017-05-31 Perforation 3063.50 3064.00 20
2017-05-31 Perforation 3057.00 3057.50 20
2017-05-31 Perforation 3050.50 3051.00 20
2017-05-31 Perforation 3044.00 3044.50 20
2017-05-31 Multi-Stage Fracture 3044.00 3077.00 0
2017-05-09 Multi-Stage Fracture 5136.00 5142.00 0
2017-05-31 Perforation 3033.00 3033.50 20
2017-05-31 Perforation 3020.00 3020.50 20
2017-05-31 Perforation 3007.00 3007.50 20
2017-06-01 Multi-Stage Fracture 3007.00 3033.50 0
2017-06-01 Perforation 2993.00 2993.50 20
2017-06-01 Perforation 2980.00 2980.50 20
2017-06-01 Perforation 2967.00 2967.50 20
2017-06-01 Multi-Stage Fracture 2967.00 2993.50 0
2017-06-01 Perforation 2953.00 2953.50 20
2017-06-01 Perforation 2940.00 2940.50 20
2017-05-09 Perforation 5101.00 5102.00 20
2017-06-01 Perforation 2927.00 2927.50 20
2017-06-02 Perforation 2933.00 2933.50 20
2017-06-02 Multi-Stage Fracture 2933.00 2953.50 0
2017-06-02 Perforation 2913.00 2913.50 20
2017-06-02 Perforation 2900.00 2900.50 20
2017-06-02 Perforation 2887.00 2887.50 20
2017-06-02 Multi-Stage Fracture 2887.00 2913.50 0
2017-06-02 Perforation 2873.00 2873.50 20
2017-06-02 Perforation 2860.00 2860.50 20
2017-06-02 Perforation 2847.00 2847.50 20
2017-04-25 Multi-Stage Fracture 5840.00 5840.10 0
2017-05-09 Perforation 5096.00 5097.00 20
2017-06-02 Multi-Stage Fracture 2847.00 2873.50 0
2017-06-03 Perforation 2831.00 2831.50 20
2017-06-03 Perforation 2820.50 2821.00 20
2017-06-03 Perforation 2807.00 2807.50 20
2017-06-03 Multi-Stage Fracture 2807.00 2831.50 0
2017-05-09 Multi-Stage Fracture 5096.00 5102.00 0
2017-05-09 Perforation 5073.00 5073.50 20
2017-05-09 Perforation 5060.00 5060.50 20
2017-05-09 Perforation 5047.00 5047.50 20
2017-05-10 Multi-Stage Fracture 5047.00 5073.50 0
2017-05-10 Perforation 5033.00 5033.50 20
2017-05-10 Perforation 5020.00 5020.50 20
2017-05-10 Perforation 5007.00 5007.50 20
2017-05-10 Multi-Stage Fracture 5007.00 5020.50 0
2017-04-26 Multi-Stage Fracture 5798.50 5798.60 0
2017-05-10 Perforation 4993.00 4993.50 20
2017-05-10 Perforation 4980.00 4980.50 20
2017-05-10 Perforation 4967.00 4967.50 20
2017-05-10 Multi-Stage Fracture 4967.00 4993.50 0
2017-05-10 Perforation 4955.70 4956.00 20
2017-05-10 Perforation 4950.00 4950.30 20
2017-05-10 Perforation 4943.50 4943.80 20
2017-05-10 Perforation 4937.00 4937.30 20
2017-05-10 Perforation 4930.50 4930.80 20
2017-05-10 Perforation 4924.00 4924.30 20
2017-04-26 Multi-Stage Fracture 5757.10 5757.20 0
2017-05-11 Multi-Stage Fracture 4924.00 4956.00 0
2017-05-11 Perforation 4916.50 4916.80 20
2017-05-11 Perforation 4910.00 4910.30 20
2017-05-11 Perforation 4903.50 4903.80 20
2017-05-11 Perforation 4897.00 4897.30 20
2017-05-11 Perforation 4890.50 4890.80 20
2017-05-11 Perforation 4884.00 4884.30 20
2017-05-11 Multi-Stage Fracture 4884.00 4916.80 0
2017-05-11 Perforation 4876.50 4876.80 20
2017-05-11 Perforation 4870.00 4870.30 20
2017-04-26 Multi-Stage Fracture 5715.60 5715.70 0
2017-05-11 Perforation 4863.50 4863.80 20
2017-05-11 Perforation 4857.00 4857.30 20
2017-05-11 Perforation 4851.50 4851.80 20
2017-05-11 Perforation 4844.00 4844.30 20
2017-05-11 Multi-Stage Fracture 4844.00 4876.80 0
2017-05-12 Perforation 4833.00 4834.00 20
2017-05-12 Perforation 4820.00 4821.00 20
2017-05-12 Perforation 4807.00 4808.00 20
2017-05-12 Multi-Stage Fracture 4807.00 4834.00 0
2017-05-12 Perforation 4793.00 4794.00 20
2017-04-26 Multi-Stage Fracture 5674.10 5674.20 0
2017-05-12 Perforation 4780.00 4781.00 20
2017-05-12 Perforation 4767.00 4768.00 20
2017-05-12 Multi-Stage Fracture 4767.00 4794.00 0
2017-05-12 Perforation 4753.00 4754.00 20
2017-05-12 Perforation 4740.00 4741.00 20
2017-05-12 Perforation 4727.00 4728.00 20
2017-05-13 Multi-Stage Fracture 4727.00 4754.00 0
2017-05-13 Perforation 4710.00 4711.00 20
2017-05-13 Perforation 4697.00 4698.00 20
2017-05-13 Perforation 4688.60 4689.60 20
2017-04-26 Multi-Stage Fracture 5632.60 5632.70 0
2017-05-13 Multi-Stage Fracture 4688.60 4711.00 0
2017-05-13 Perforation 4671.00 4672.00 20
2017-05-13 Perforation 4658.00 4659.00 20
2017-05-13 Perforation 4646.00 4647.00 20
2017-05-13 Multi-Stage Fracture 4646.00 4672.00 0
2017-05-13 Perforation 4633.00 4634.00 20
2017-05-13 Perforation 4620.00 4621.00 20
2017-05-13 Perforation 4607.00 4608.00 20
2017-05-13 Multi-Stage Fracture 4607.00 4634.00 0
2017-05-14 Perforation 4593.00 4594.00 20
2017-04-26 Multi-Stage Fracture 5591.20 5591.30 0
2017-05-14 Perforation 4580.00 4581.00 20
2017-05-14 Perforation 4567.00 4568.00 20
2017-05-14 Multi-Stage Fracture 4567.00 4694.00 0
2017-05-14 Perforation 4553.00 4554.00 20
2017-05-14 Perforation 4540.00 4541.00 20
2017-05-14 Perforation 4527.00 4528.00 20
2017-05-14 Multi-Stage Fracture 4527.00 4554.00 0
2017-05-14 Perforation 4513.00 4514.00 20
2017-05-14 Perforation 4500.00 4501.00 20
2017-05-14 Perforation 4487.00 4488.00 20

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-04-25 2017-06-03 2,726 60,270 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 87.611 N/A
40/70 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 11.5973 N/A
15% HCl Calfrac Acid Hydrochloric acid 7647-01-0 100 0.5326 N/A
Water 7732-18-5 100 0.5326 N/A
DWP-944 Calfrac Bactericide/Biocide Acetamide. 2.2-dibromo-2-cyano 10222-01-2 100 0.0121 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0121 N/A
DWP-913 Calfrac Clay Control Non-Hazardous Ingredients Trade Secret 100 0.0768 N/A
CI-9100G Calfrac Corrosion Inhibitor Alcohols. C12-15. ethoxylated 68131-39-5 100 0.0002 N/A
Cinnamaldehyde 104-55-2 100 0.0002 N/A
Dipropylene glycol monomethyl ether 34590-94-8 100 0.0002 N/A
Ethylene Glycol 107-21-1 100 0.0002 N/A
Formic acid 64-18-6 100 0.0002 N/A
Isopropyl alcohol 67-63-0 100 0.0002 N/A
Tar bases. quinoline derivs. 68513-87-1 100 0.0002 N/A
Tar bases. quinolone derivs.. benzyl chloride-quarternized 72480-70-7 100 0.0002 N/A
DWP-959 Calfrac Demulsifier Methanol 67-56-1 100 0.0798 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0798 N/A
CalVisc Calfrac Friction Reducer Non-Hazardous Ingredients Trade Secret 100 0.0899 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2016-11-05 2016-12-04 Surface Water - River 62733

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 3553 0.0 0.0 0.0
2018 6833 0.0 0.0 0.0
2019 8286 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-02-15 No Incident Encountered 0.00 0.00
2017-06-03 No Incident Encountered 0.00 0.00

For data sources see[10]

References