X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0666052416020

Well Details

Well ID: 0666052416020
Loading map...
Location: 02/16-24-066-05W6/0
Location Alias: 02/16-24-66-05 W6M
Location Alias 2: 02/16-24-066-05 W6/00
Country: Canada
Province: Alberta
Township: 066
Meridian: 6
Range: 05
Section: 24
County/Municipality: Municipal District of Greenview No. 16
Well Name: PARA HZ 102 KARR 16-24-66-5
Operator Name: Paramount Resources Ltd.
License Number: 0481444
License Date: 2016-11-14
License Status: Issued
Spud Date: 2016-12-02
Final Drill Date: 2017-01-16
Well Total Depth: 6090.00 m
Surface Hole Latitude: 54.703259
Surface Hole Longitude: -118.600669

For data sources see[1][2]

Well History

Date Event
2016-11-14 Obtained License
2016-12-03 Surface Casing Operation Performed
2016-12-17 Direction Drilling Operation Performed - Deviate
2016-12-25 Intermediate Casing Operation Performed
2016-12-28 Direction Drilling Operation Performed - Horizontal
2017-01-15 Well Log Performed
2017-01-16 Finished Drilling
2017-01-16 Well Mode changed to Drilled and Cased
2017-01-18 Production Casing Operation Performed
2017-01-20 Rig Released
2017-04-27 Perforation Treatment Performed - Multi-Stage Fracture
2017-04-28 Perforation Treatment Performed - Multi-Stage Fracture
2017-04-29 Perforation Treatment Performed - Multi-Stage Fracture
2017-05-08 Perforation Treatment Performed - Jet Perforation
2017-05-08 Perforation Treatment Performed - Multi-Stage Fracture
2017-05-09 Perforation Treatment Performed - Jet Perforation
2017-05-09 Perforation Treatment Performed - Multi-Stage Fracture
2017-05-10 Perforation Treatment Performed - Jet Perforation
2017-05-10 Perforation Treatment Performed - Multi-Stage Fracture
2017-05-11 Perforation Treatment Performed - Jet Perforation
2017-05-11 Perforation Treatment Performed - Multi-Stage Fracture
2017-05-12 Perforation Treatment Performed - Jet Perforation
2017-05-12 Perforation Treatment Performed - Multi-Stage Fracture
2017-05-13 Perforation Treatment Performed - Jet Perforation
2017-05-13 Perforation Treatment Performed - Multi-Stage Fracture
2017-05-14 Perforation Treatment Performed - Jet Perforation
2017-05-14 Perforation Treatment Performed - Multi-Stage Fracture
2017-05-15 Perforation Treatment Performed - Jet Perforation
2017-05-15 Perforation Treatment Performed - Multi-Stage Fracture
2017-05-16 Perforation Treatment Performed - Jet Perforation
2017-05-16 Perforation Treatment Performed - Multi-Stage Fracture
2017-05-17 Perforation Treatment Performed - Jet Perforation
2017-05-17 Perforation Treatment Performed - Multi-Stage Fracture
2017-05-18 Perforation Treatment Performed - Jet Perforation
2017-05-18 Perforation Treatment Performed - Multi-Stage Fracture
2017-05-19 Perforation Treatment Performed - Jet Perforation
2017-05-19 Perforation Treatment Performed - Multi-Stage Fracture
2017-05-20 Perforation Treatment Performed - Jet Perforation
2017-05-20 Perforation Treatment Performed - Multi-Stage Fracture
2017-05-21 Perforation Treatment Performed - Jet Perforation
2017-05-21 Perforation Treatment Performed - Multi-Stage Fracture
2017-05-22 Perforation Treatment Performed - Jet Perforation
2017-05-22 Perforation Treatment Performed - Multi-Stage Fracture
2017-05-23 Perforation Treatment Performed - Jet Perforation
2017-05-23 Perforation Treatment Performed - Multi-Stage Fracture
2017-05-24 Perforation Treatment Performed - Jet Perforation
2017-05-24 Perforation Treatment Performed - Multi-Stage Fracture
2017-05-25 Perforation Treatment Performed - Jet Perforation
2017-05-25 Perforation Treatment Performed - Multi-Stage Fracture
2017-05-26 Perforation Treatment Performed - Jet Perforation
2017-05-26 Perforation Treatment Performed - Multi-Stage Fracture
2017-05-27 Perforation Treatment Performed - Jet Perforation
2017-05-27 Perforation Treatment Performed - Multi-Stage Fracture
2017-05-28 Perforation Treatment Performed - Jet Perforation
2017-05-28 Perforation Treatment Performed - Multi-Stage Fracture
2017-05-29 Perforation Treatment Performed - Jet Perforation
2017-05-29 Perforation Treatment Performed - Multi-Stage Fracture
2017-05-30 Perforation Treatment Performed - Jet Perforation
2017-05-30 Perforation Treatment Performed - Multi-Stage Fracture
2017-05-31 Perforation Treatment Performed - Jet Perforation
2017-05-31 Perforation Treatment Performed - Multi-Stage Fracture
2017-06-01 Perforation Treatment Performed - Jet Perforation
2017-06-01 Perforation Treatment Performed - Multi-Stage Fracture
2017-06-02 Perforation Treatment Performed - Jet Perforation
2017-06-02 Perforation Treatment Performed - Multi-Stage Fracture
2017-06-03 Perforation Treatment Performed - Jet Perforation
2017-06-03 Perforation Treatment Performed - Multi-Stage Fracture
2017-06-26 Well Began Production
2017-06-26 Well Fluid changed to Gas
2017-06-26 Well Mode changed to Flowing
2019-02-24 Well Fluid changed to Gas
2019-02-24 Well Mode changed to Pumping
2019-12-17 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2016-12-02 Fox Drilling Inc. 6 N/A Set Surface
2016-12-17 Fox Drilling Inc. 6 N/A Resumption

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2016-12-17 734.80 Deviate (5 - 79 degrees)
2016-12-28 2895.90 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-04-27 Multi-Stage Fracture 6013.80 6013.90 0
2017-04-28 Multi-Stage Fracture 5640.00 5640.10 0
2017-05-18 Perforation 4266.00 4267.00 20
2017-05-18 Multi-Stage Fracture 4266.00 4272.00 0
2017-05-18 Perforation 4229.00 4230.00 20
2017-05-18 Perforation 4225.00 4226.00 20
2017-05-19 Multi-Stage Fracture 4225.00 4230.00 0
2017-05-19 Perforation 4191.00 4192.00 20
2017-05-19 Perforation 4186.00 4187.00 20
2017-05-19 Multi-Stage Fracture 4186.00 4192.00 0
2017-05-20 Perforation 4149.00 4150.00 20
2017-05-20 Perforation 4144.00 4145.00 20
2017-04-29 Multi-Stage Fracture 5598.50 5598.60 0
2017-05-20 Multi-Stage Fracture 4144.00 4150.00 0
2017-05-20 Perforation 4111.00 4112.00 20
2017-05-20 Perforation 4106.00 4107.00 20
2017-05-20 Multi-Stage Fracture 4106.00 4112.00 0
2017-05-20 Perforation 4071.00 4072.00 20
2017-05-20 Perforation 4066.00 4067.00 20
2017-05-21 Multi-Stage Fracture 4066.00 4072.00 0
2017-05-21 Perforation 4031.00 4032.00 20
2017-05-21 Perforation 4024.00 4025.00 20
2017-05-21 Multi-Stage Fracture 4024.00 4032.00 0
2017-04-29 Multi-Stage Fracture 5557.00 5557.10 0
2017-05-21 Perforation 3991.00 3992.00 20
2017-05-21 Perforation 3986.00 3987.00 20
2017-05-21 Multi-Stage Fracture 3986.00 3992.00 0
2017-05-22 Perforation 3951.00 3952.00 20
2017-05-22 Perforation 3946.00 3947.00 20
2017-05-22 Multi-Stage Fracture 3946.00 3952.00 0
2017-05-22 Perforation 3911.00 3912.00 20
2017-05-22 Perforation 3906.00 3907.00 20
2017-05-22 Multi-Stage Fracture 3906.00 3912.00 0
2017-05-23 Perforation 3871.00 3872.00 20
2017-04-29 Multi-Stage Fracture 5515.50 5515.60 0
2017-05-23 Perforation 3865.00 3866.00 20
2017-05-23 Multi-Stage Fracture 3865.00 3872.00 0
2017-05-23 Perforation 3831.00 3832.00 20
2017-05-23 Perforation 3826.00 3827.00 20
2017-05-23 Multi-Stage Fracture 3826.00 3832.00 0
2017-05-24 Perforation 3789.00 3790.00 20
2017-05-24 Perforation 3784.00 3785.00 20
2017-05-24 Multi-Stage Fracture 3784.00 3790.00 0
2017-05-24 Perforation 3751.00 3752.00 20
2017-05-24 Perforation 3746.00 3747.00 20
2017-04-29 Multi-Stage Fracture 5474.00 5474.10 0
2017-05-25 Multi-Stage Fracture 3746.00 3752.00 0
2017-05-25 Perforation 3711.00 3712.00 20
2017-05-25 Perforation 3706.00 3707.00 20
2017-05-25 Multi-Stage Fracture 3706.00 3712.00 0
2017-05-25 Perforation 3671.00 3672.00 20
2017-05-25 Perforation 3666.00 3667.00 20
2017-05-26 Multi-Stage Fracture 3666.00 3672.00 0
2017-05-26 Perforation 3631.00 3632.00 20
2017-05-26 Perforation 3626.00 3627.00 20
2017-05-26 Multi-Stage Fracture 3626.00 3632.00 0
2017-04-29 Multi-Stage Fracture 5432.80 5432.90 0
2017-05-26 Perforation 3591.00 3592.00 20
2017-05-26 Perforation 3586.00 3587.00 20
2017-05-27 Multi-Stage Fracture 3586.00 3592.00 0
2017-05-27 Perforation 3550.00 3551.00 20
2017-05-27 Perforation 3545.00 3546.00 20
2017-05-27 Multi-Stage Fracture 3545.00 3551.00 0
2017-05-27 Perforation 3511.00 3512.00 20
2017-05-27 Perforation 3506.00 3507.00 20
2017-05-27 Multi-Stage Fracture 3506.00 3512.00 0
2017-05-27 Perforation 3471.00 3472.00 20
2017-04-29 Multi-Stage Fracture 5391.20 5391.30 0
2017-05-27 Perforation 3466.00 3467.00 20
2017-05-28 Perforation 3462.00 3463.00 20
2017-05-28 Multi-Stage Fracture 3462.00 3472.00 0
2017-05-28 Perforation 3431.00 3432.00 20
2017-05-28 Perforation 3426.00 3427.00 20
2017-05-28 Multi-Stage Fracture 3426.00 3432.00 0
2017-05-29 Perforation 3391.00 3392.00 20
2017-05-29 Perforation 3384.00 3385.00 20
2017-05-29 Multi-Stage Fracture 3384.00 3392.00 0
2017-05-29 Perforation 3351.00 3352.00 20
2017-05-08 Perforation 5351.00 5352.00 20
2017-05-29 Perforation 3346.00 3347.00 20
2017-05-29 Multi-Stage Fracture 3346.00 3352.00 0
2017-05-29 Perforation 3312.00 3313.00 20
2017-05-29 Perforation 3306.00 3307.00 20
2017-05-30 Multi-Stage Fracture 3306.00 3313.00 0
2017-05-30 Perforation 3271.00 3272.00 20
2017-05-30 Perforation 3266.00 3267.00 20
2017-05-30 Multi-Stage Fracture 3266.00 3272.00 0
2017-05-30 Perforation 3231.00 3232.00 20
2017-05-30 Perforation 3226.00 3227.00 20
2017-05-08 Perforation 5346.00 5347.00 20
2017-05-31 Multi-Stage Fracture 3226.00 3232.00 0
2017-05-31 Perforation 3191.00 3192.00 20
2017-05-31 Perforation 3186.00 3187.00 20
2017-05-31 Multi-Stage Fracture 3186.00 3192.00 0
2017-05-31 Perforation 3151.00 3152.00 20
2017-05-31 Perforation 3146.00 3147.00 20
2017-05-31 Multi-Stage Fracture 3146.00 3152.00 0
2017-06-01 Perforation 3111.00 3112.00 20
2017-06-01 Perforation 3106.00 3107.00 20
2017-06-01 Multi-Stage Fracture 3106.00 3112.00 0
2017-05-08 Multi-Stage Fracture 5346.00 5352.00 0
2017-06-01 Perforation 3071.00 3072.00 20
2017-06-01 Perforation 3066.00 3067.00 20
2017-06-01 Multi-Stage Fracture 3066.00 3072.00 0
2017-06-01 Perforation 3031.00 3032.00 20
2017-06-01 Perforation 3026.00 3027.00 20
2017-06-02 Multi-Stage Fracture 3026.00 3032.00 0
2017-06-02 Perforation 2991.00 2992.00 20
2017-06-02 Perforation 2986.00 2987.00 20
2017-06-02 Multi-Stage Fracture 2986.00 2992.00 0
2017-06-02 Perforation 2951.00 2952.00 20
2017-04-28 Multi-Stage Fracture 5972.20 5972.30 0
2017-05-08 Perforation 5311.00 5312.00 20
2017-06-02 Perforation 2944.00 2945.00 20
2017-06-03 Multi-Stage Fracture 2944.00 2952.00 0
2017-06-03 Perforation 2911.00 2912.00 20
2017-06-03 Perforation 2905.70 2906.70 20
2017-06-03 Multi-Stage Fracture 2905.70 2912.00 0
2019-12-17 Acid Treatment 2905.70 6013.90 0
2017-05-08 Perforation 5306.00 5307.00 20
2017-05-08 Multi-Stage Fracture 5306.00 5312.00 0
2017-05-09 Perforation 5271.00 5272.00 20
2017-05-09 Perforation 5266.00 5267.00 20
2017-05-09 Multi-Stage Fracture 5266.00 5272.00 0
2017-05-09 Perforation 5231.00 5232.00 20
2017-05-09 Perforation 5227.00 5228.00 20
2017-05-09 Multi-Stage Fracture 5227.00 5232.00 0
2017-05-09 Perforation 5191.00 5192.00 20
2017-04-28 Multi-Stage Fracture 5930.70 5930.80 0
2017-05-09 Perforation 5186.00 5187.00 20
2017-05-09 Multi-Stage Fracture 5186.00 5192.00 0
2017-05-10 Perforation 5151.50 5152.00 20
2017-05-10 Perforation 5149.00 5149.50 20
2017-05-10 Perforation 5146.00 5146.50 20
2017-05-10 Multi-Stage Fracture 5146.00 5152.00 0
2017-05-10 Perforation 5111.00 5112.00 20
2017-05-10 Perforation 5106.00 5107.00 20
2017-05-10 Multi-Stage Fracture 5106.00 5112.00 0
2017-05-10 Perforation 5071.00 5072.00 20
2017-04-28 Multi-Stage Fracture 5889.10 5889.20 0
2017-05-10 Perforation 5066.00 5067.00 20
2017-05-10 Multi-Stage Fracture 5066.00 5072.00 0
2017-05-11 Perforation 5031.00 5032.00 20
2017-05-11 Perforation 5026.00 5027.00 20
2017-05-11 Multi-Stage Fracture 5026.00 5032.00 0
2017-05-11 Perforation 4994.00 4995.00 20
2017-05-11 Perforation 4986.00 4987.00 20
2017-05-11 Multi-Stage Fracture 4986.00 4995.00 0
2017-05-11 Perforation 4950.00 4951.00 20
2017-05-11 Perforation 4946.00 4947.00 20
2017-04-28 Multi-Stage Fracture 5847.60 5847.70 0
2017-05-12 Multi-Stage Fracture 4946.00 4951.00 0
2017-05-12 Perforation 4911.00 4912.00 20
2017-05-12 Perforation 4906.00 4907.00 20
2017-05-12 Multi-Stage Fracture 4906.00 4912.00 0
2017-05-12 Perforation 4871.00 4872.00 20
2017-05-12 Perforation 4866.00 4867.00 20
2017-05-12 Multi-Stage Fracture 4866.00 4872.00 0
2017-05-13 Perforation 4831.00 4832.00 20
2017-05-13 Perforation 4826.00 4827.00 20
2017-05-13 Multi-Stage Fracture 4826.00 4832.00 0
2017-04-28 Multi-Stage Fracture 5806.00 5806.10 0
2017-05-13 Perforation 4791.00 4792.00 20
2017-05-13 Perforation 4786.00 4787.00 20
2017-05-13 Multi-Stage Fracture 4786.00 4792.00 0
2017-05-13 Perforation 4751.00 4752.00 20
2017-05-13 Perforation 4746.00 4747.00 20
2017-05-13 Multi-Stage Fracture 4746.00 4752.00 0
2017-05-13 Perforation 4710.00 4711.00 20
2017-05-13 Perforation 4706.00 4707.00 20
2017-05-14 Multi-Stage Fracture 4706.00 4711.00 0
2017-05-14 Perforation 4671.00 4672.00 20
2017-04-28 Multi-Stage Fracture 5764.50 5764.60 0
2017-05-14 Perforation 4666.00 4667.00 20
2017-05-14 Multi-Stage Fracture 4666.00 4672.00 0
2017-05-14 Perforation 4631.00 4632.00 20
2017-05-14 Perforation 4626.00 4627.00 20
2017-05-14 Multi-Stage Fracture 4626.00 4632.00 0
2017-05-14 Perforation 4591.00 4592.00 20
2017-05-14 Perforation 4583.00 4584.00 20
2017-05-15 Multi-Stage Fracture 4583.00 4592.00 0
2017-05-15 Perforation 4551.00 4552.00 20
2017-05-15 Perforation 4546.00 4547.00 20
2017-04-28 Multi-Stage Fracture 5723.00 5723.10 0
2017-05-15 Multi-Stage Fracture 4546.00 4552.00 0
2017-05-15 Perforation 4511.00 4512.00 20
2017-05-15 Perforation 4506.00 4507.00 20
2017-05-15 Multi-Stage Fracture 4506.00 4512.00 0
2017-05-15 Perforation 4470.00 4471.00 20
2017-05-15 Perforation 4466.00 4467.00 20
2017-05-15 Multi-Stage Fracture 4466.00 4471.00 0
2017-05-16 Perforation 4431.00 4432.00 20
2017-05-16 Perforation 4426.00 4427.00 20
2017-05-16 Multi-Stage Fracture 4426.00 4432.00 0
2017-04-28 Multi-Stage Fracture 5681.50 5681.60 0
2017-05-17 Perforation 4391.00 4392.00 20
2017-05-17 Perforation 4386.00 4387.00 20
2017-05-17 Multi-Stage Fracture 4386.00 4392.00 0
2017-05-17 Perforation 4351.00 4352.00 20
2017-05-17 Perforation 4346.00 4347.00 20
2017-05-17 Multi-Stage Fracture 4346.00 4352.00 0
2017-05-18 Perforation 4311.00 4312.00 20
2017-05-18 Perforation 4306.00 4307.00 20
2017-05-18 Multi-Stage Fracture 4306.00 4312.00 0
2017-05-18 Perforation 4271.00 4272.00 20

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-04-27 2017-06-03 2,729 58,465 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 87.4639 N/A
40/70 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 11.7518 N/A
15% HCl Calfrac Acid Hydrochloric acid 7647-01-0 100 0.5209 N/A
Water 7732-18-5 100 0.5209 N/A
DWP-944 Calfrac Bactericide/Biocide Acetamide. 2.2-dibromo-2-cyano 10222-01-2 100 0.012 N/A
Non-Hazardous Ingredients Trade Secret 100 0.012 N/A
DWP-913 Calfrac Clay Control Non-Hazardous Ingredients Trade Secret 100 0.0792 N/A
CI-9100G Calfrac Corrosion Inhibitor Alcohols. C12-15. ethoxylated 68131-39-5 100 0.0002 N/A
Cinnamaldehyde 104-55-2 100 0.0002 N/A
Dipropylene glycol monomethyl ether 34590-94-8 100 0.0002 N/A
Ethylene Glycol 107-21-1 100 0.0002 N/A
Formic acid 64-18-6 100 0.0002 N/A
Isopropyl alcohol 67-63-0 100 0.0002 N/A
Tar bases. quinoline derivs. 68513-87-1 100 0.0002 N/A
Tar bases. quinolone derivs.. benzyl chloride-quarternized 72480-70-7 100 0.0002 N/A
DWP-959 Calfrac Demulsifier Methanol 67-56-1 100 0.0809 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0809 N/A
CalVisc Calfrac Friction Reducer Non-Hazardous Ingredients Trade Secret 100 0.0907 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-04-04 2017-06-14 Surface Water - River 60133

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 3737 0.0 0.0 0.0
2018 6991 0.0 0.0 0.0
2019 6818 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-01-20 No Incident Encountered 0.00 0.00
2017-06-03 No Incident Encountered 0.00 0.00
2019-12-19 No Incident Encountered 0.00 0.00

For data sources see[10]

References