If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0666052513000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.73516,"lon":-118.626758,"icon":""}]} |
| Location: 00/13-25-066-05W6/0 | |
| Location Alias: 00/13-25-66-05 W6M | |
| Location Alias 2: 00/13-25-066-05 W6/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 066 | |
| Meridian: 6 | |
| Range: 05 | |
| Section: 25 | |
| County/Municipality: Municipal District of Greenview No. 16 | |
| Well Name: PARA HZ GOLDCK 13-25-66-5 | |
| Operator Name: Paramount Resources Ltd. | |
| License Number: 0420908 | |
| License Date: 2010-06-03 | |
| License Status: Amended | |
| Spud Date: 2010-11-11 | |
| Final Drill Date: 2010-12-14 | |
| Well Total Depth: 4225.00 m | |
| Surface Hole Latitude: 54.735160 | |
| Surface Hole Longitude: -118.626758 |
| Date | Event |
|---|---|
| 2010-06-03 | Obtained License |
| 2010-11-12 | Surface Casing Operation Performed |
| 2010-11-21 | Well Log Performed |
| 2010-11-22 | Direction Drilling Operation Performed - Deviate |
| 2010-11-29 | Direction Drilling Operation Performed - Horizontal |
| 2010-12-01 | Well Log Performed |
| 2010-12-02 | Intermediate Casing Operation Performed |
| 2010-12-14 | Finished Drilling |
| 2010-12-14 | Well Log Performed |
| 2010-12-14 | Well Mode changed to Drilled and Cased |
| 2010-12-16 | Liner Casing Operation Performed |
| 2010-12-16 | Perforation Treatment Performed - Open-Hole Completion |
| 2010-12-16 | Well Log Performed |
| 2010-12-17 | Rig Released |
| 2011-06-03 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2011-06-11 | Well Log Performed |
| 2012-04-06 | Well Began Production |
| 2012-04-06 | Well Fluid changed to Gas |
| 2012-04-06 | Well Mode changed to Flowing |
| 2012-06-14 | Well Log Performed |
| 2014-11-27 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2014-11-27 | Plug Back Performed |
| 2014-11-27 | Well Fluid changed to Gas |
| 2014-11-27 | Well Mode changed to Abandoned Zone |
| 2014-12-02 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2014-12-02 | Plug Back Performed |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2010-11-22 | 2595.30 | Deviate (5 - 79 degrees) |
| 2010-11-29 | 2856.30 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2010-12-16 | Open Hole/Barefoot Completion | 4220.00 | 4225.00 | 0 |
| 2011-06-03 | Multi-Stage Fracture | 3661.50 | 3662.30 | 0 |
| 2011-06-03 | Multi-Stage Fracture | 3598.40 | 3599.20 | 0 |
| 2011-06-03 | Multi-Stage Fracture | 3535.60 | 3536.40 | 0 |
| 2011-06-03 | Multi-Stage Fracture | 3472.90 | 3473.70 | 0 |
| 2011-06-03 | Multi-Stage Fracture | 3409.90 | 3410.70 | 0 |
| 2011-06-03 | Multi-Stage Fracture | 3346.90 | 3347.70 | 0 |
| 2011-06-03 | Multi-Stage Fracture | 3295.40 | 3296.20 | 0 |
| 2011-06-03 | Multi-Stage Fracture | 3244.10 | 3244.90 | 0 |
| 2011-06-03 | Multi-Stage Fracture | 3192.70 | 3193.50 | 0 |
| 2011-06-03 | Multi-Stage Fracture | 3141.20 | 3142.00 | 0 |
| 2011-06-03 | Multi-Stage Fracture | 4185.40 | 4186.70 | 0 |
| 2011-06-03 | Multi-Stage Fracture | 3089.80 | 3090.60 | 0 |
| 2011-06-03 | Multi-Stage Fracture | 3038.30 | 3039.10 | 0 |
| 2011-06-03 | Multi-Stage Fracture | 2982.40 | 2983.20 | 0 |
| 2011-06-03 | Multi-Stage Fracture | 2935.70 | 2936.50 | 0 |
| 2014-11-27 | Packing Device Capped w/Cement | 2815.00 | 2823.00 | 0 |
| 2014-12-02 | Packing Device Capped w/Cement | 2775.00 | 2783.00 | 0 |
| 2011-06-03 | Multi-Stage Fracture | 4118.20 | 4119.00 | 0 |
| 2011-06-03 | Multi-Stage Fracture | 4053.70 | 4054.50 | 0 |
| 2011-06-03 | Multi-Stage Fracture | 3988.50 | 3989.30 | 0 |
| 2011-06-03 | Multi-Stage Fracture | 3925.40 | 3926.20 | 0 |
| 2011-06-03 | Multi-Stage Fracture | 3862.20 | 3863.00 | 0 |
| 2011-06-03 | Multi-Stage Fracture | 3799.20 | 3800.00 | 0 |
| 2011-06-03 | Multi-Stage Fracture | 3724.70 | 3725.50 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2012 | 3027 | 0.0 | 0.0 | 0.0 |
| 2013 | 2768 | 0.0 | 0.0 | 0.0 |
| 2014 | 720 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2012-06-04 | No Incident Encountered | 0.00 | 0.00 |
| 2012-06-16 | No Incident Encountered | 0.00 | 0.00 |
| 2014-12-03 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]