If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0666052616000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.73531,"lon":-118.627146,"icon":""}]} |
| Location: 00/16-26-066-05W6/0 | |
| Location Alias: 00/16-26-66-05 W6M | |
| Location Alias 2: 00/16-26-066-05 W6/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 066 | |
| Meridian: 6 | |
| Range: 05 | |
| Section: 26 | |
| County/Municipality: Municipal District of Greenview No. 16 | |
| Well Name: PARA HZ KARR 16-26-66-5 | |
| Operator Name: Paramount Resources Ltd. | |
| License Number: 0420943 | |
| License Date: 2010-06-03 | |
| License Status: Amended | |
| Spud Date: 2011-02-27 | |
| Final Drill Date: 2011-04-01 | |
| Well Total Depth: 4549.50 m | |
| Surface Hole Latitude: 54.735310 | |
| Surface Hole Longitude: -118.627146 |
| Date | Event |
|---|---|
| 2010-06-03 | Obtained License |
| 2011-03-01 | Surface Casing Operation Performed |
| 2011-03-09 | Well Log Performed |
| 2011-03-10 | Direction Drilling Operation Performed - Deviate |
| 2011-03-16 | Direction Drilling Operation Performed - Horizontal |
| 2011-03-17 | Intermediate Casing Operation Performed |
| 2011-04-01 | Finished Drilling |
| 2011-04-01 | Well Log Performed |
| 2011-04-01 | Well Mode changed to Drilled and Cased |
| 2011-04-02 | Well Log Performed |
| 2011-04-05 | Liner Casing Operation Performed |
| 2011-04-05 | Well Log Performed |
| 2011-04-06 | Perforation Treatment Performed - Open-Hole Completion |
| 2011-04-07 | Rig Released |
| 2011-06-22 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2011-06-23 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2012-04-09 | Well Began Production |
| 2012-04-09 | Well Fluid changed to Gas |
| 2012-04-09 | Well Mode changed to Flowing |
| 2014-11-22 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2014-11-22 | Plug Back Performed |
| 2014-11-22 | Well Fluid changed to Gas |
| 2014-11-22 | Well Mode changed to Abandoned Zone |
| 2014-11-26 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2014-11-26 | Plug Back Performed |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2011-03-10 | 2583.50 | Deviate (5 - 79 degrees) |
| 2011-03-16 | 2902.30 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2011-04-06 | Open Hole/Barefoot Completion | 4547.00 | 4549.50 | 0 |
| 2011-06-22 | Multi-Stage Fracture | 3950.00 | 3950.80 | 0 |
| 2011-06-23 | Multi-Stage Fracture | 3867.20 | 3868.00 | 0 |
| 2011-06-23 | Multi-Stage Fracture | 3798.10 | 3798.90 | 0 |
| 2011-06-23 | Multi-Stage Fracture | 3727.40 | 3728.20 | 0 |
| 2011-06-23 | Multi-Stage Fracture | 3645.10 | 3645.90 | 0 |
| 2011-06-23 | Multi-Stage Fracture | 3576.00 | 3576.80 | 0 |
| 2011-06-23 | Multi-Stage Fracture | 3495.00 | 3495.80 | 0 |
| 2011-06-23 | Multi-Stage Fracture | 3414.10 | 3414.90 | 0 |
| 2011-06-23 | Multi-Stage Fracture | 3344.40 | 3345.20 | 0 |
| 2011-06-23 | Multi-Stage Fracture | 3262.70 | 3263.50 | 0 |
| 2011-06-22 | Multi-Stage Fracture | 4537.70 | 4539.00 | 0 |
| 2011-06-23 | Multi-Stage Fracture | 3194.10 | 3194.90 | 0 |
| 2011-06-23 | Multi-Stage Fracture | 3112.30 | 3113.10 | 0 |
| 2011-06-23 | Multi-Stage Fracture | 3042.80 | 3043.60 | 0 |
| 2011-06-23 | Multi-Stage Fracture | 2972.20 | 2973.00 | 0 |
| 2014-11-22 | Packing Device Capped w/Cement | 2832.00 | 2840.00 | 0 |
| 2014-11-26 | Packing Device Capped w/Cement | 2786.60 | 2794.60 | 0 |
| 2011-06-22 | Multi-Stage Fracture | 4474.50 | 4475.30 | 0 |
| 2011-06-22 | Multi-Stage Fracture | 4404.40 | 4405.20 | 0 |
| 2011-06-22 | Multi-Stage Fracture | 4322.00 | 4322.80 | 0 |
| 2011-06-22 | Multi-Stage Fracture | 4251.80 | 4252.60 | 0 |
| 2011-06-22 | Multi-Stage Fracture | 4169.40 | 4170.20 | 0 |
| 2011-06-22 | Multi-Stage Fracture | 4101.20 | 4102.00 | 0 |
| 2011-06-22 | Multi-Stage Fracture | 4019.70 | 4020.50 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2012 | 4789 | 0.0 | 0.0 | 0.0 |
| 2013 | 5226 | 0.0 | 0.0 | 0.0 |
| 2014 | 2872 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2012-08-07 | No Incident Encountered | 0.00 | 0.00 |
| 2014-11-26 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]