X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0674171611000

Well Details

Well ID: 0674171611000
Loading map...
Location: 00/11-16-067-17W4/0
Location Alias: 00/11-16-67-17 W4M
Location Alias 2: 00/11-16-067-17 W4/00
Country: Canada
Province: Alberta
Township: 067
Meridian: 4
Range: 17
Section: 16
County/Municipality: Athabasca County
Well Name: DOME PROVO DAKIN 11-16-67-17
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0019384
License Date: 1960-07-15
License Status: RecCertified
Spud Date: 1960-07-18
Final Drill Date: 1960-07-22
Well Total Depth: 570.00 m
Surface Hole Latitude: 54.800601
Surface Hole Longitude: -112.538851

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1960-07-15 Obtained License
1960-07-22 Drill Stem Test Performed
1960-07-22 Finished Drilling
1960-07-23 Production Casing Operation Performed
1960-08-19 Perforation Treatment Performed - Bullet Perforation
1960-08-20 Perforation Treatment Performed - Bullet Perforation
1960-09-30 Well Mode changed to Drilled and Cased
1969-11-29 Perforation Treatment Performed - Acid Wash - No Pressure
1976-03-15 Well Began Production
1976-03-15 Well Fluid changed to Gas
1976-03-15 Well Mode changed to Flowing
1992-05-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-05-24 Plug Back Performed
1992-05-24 Well Log Performed
1992-05-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-05-25 Perforation Treatment Performed - Jet Perforation
1992-05-25 Plug Back Performed
1992-05-25 Well Fluid changed to Gas
1992-05-25 Well Mode changed to Abandoned Zone
1994-11-27 Well Abandoned
1994-11-27 Well Fluid changed to Gas
1994-11-27 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1960-08-19 Bullet Perforation 541.60 543.80 13
1960-08-20 Bullet Perforation 541.60 542.50 13
1969-11-29 Acid Wash 541.60 543.80 0
1992-05-24 Packing Device Capped w/Cement 521.00 529.00 0
1992-05-25 Perforation 398.10 399.30 20
1992-05-25 Packing Device Capped w/Cement 377.00 385.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 6042 0.0 0.0 0.0
1977 8467 0.0 0.0 0.0
1978 7000 0.0 0.0 0.0
1979 7417 0.0 0.0 0.0
1980 8151 0.0 0.0 0.0
1981 8458 0.0 0.0 0.0
1982 8175 0.0 0.0 0.0
1983 8377 0.0 0.0 0.0
1984 8211 0.0 0.0 0.0
1985 6969 0.0 0.0 0.0
1986 7636 0.0 0.0 0.0
1987 5501 0.0 0.0 0.0
1988 7069 0.0 0.0 0.0
1989 7509 0.0 0.0 0.0
1990 7458 0.0 0.0 0.0
1991 5542 0.0 0.0 0.0

For data sources see[5]

References