X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0674171915000

Well Details

Well ID: 0674171915000
Loading map...
Location: 00/15-19-067-17W4/0
Location Alias: 00/15-19-67-17 W4M
Location Alias 2: 00/15-19-067-17 W4/00
Country: Canada
Province: Alberta
Township: 067
Meridian: 4
Range: 17
Section: 19
County/Municipality: Athabasca County
Well Name: SASKOIL ATMORE 15-19-67-17
Operator Name: CNOOC Petroleum North America ULC
License Number: 0080684
License Date: 1980-01-28
License Status: RecCertified
Spud Date: 1980-03-24
Final Drill Date: 1980-03-27
Well Total Depth: 575.00 m
Surface Hole Latitude: 54.816949
Surface Hole Longitude: -112.580730

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-01-28 Obtained License
1980-03-27 Finished Drilling
1980-03-27 Well Mode changed to Drilled and Cased
1980-03-28 Production Casing Operation Performed
1980-04-03 Perforation Treatment Performed - Jet Perforation
1980-04-14 Well Began Production
1980-04-14 Well Fluid changed to Gas
1980-04-14 Well Mode changed to Flowing
1980-05-14 Perforation Treatment Performed - Jet Perforation
1980-05-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-06-13 Perforation Treatment Performed - Cement Squeeze
1980-07-07 Perforation Treatment Performed - Jet Perforation
1980-07-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-10-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-10-13 Plug Back Performed
1993-10-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-10-14 Perforation Treatment Performed - Jet Perforation
1993-10-14 Perforation Treatment Performed - Remedial Casing
1993-10-14 Well Fluid changed to Gas
1993-10-14 Well Mode changed to Abandoned
1993-11-01 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-04-03 Perforation 508.00 512.00 13
1993-10-14 Remedial Casing Cementing 187.20 187.50 0
1980-05-14 Perforation 518.00 521.00 13
1980-05-15 Acid Treatment 508.00 521.00 0
1980-06-13 Cement Squeeze 518.00 521.00 0
1980-07-07 Perforation 508.00 512.00 13
1980-07-08 Acid Treatment 508.00 512.00 0
1993-10-13 Packing Device Capped w/Cement 487.00 495.00 0
1993-10-14 Perforation 187.20 187.50 24
1993-10-14 Acid Treatment 187.20 187.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 688 0.0 0.0 0.0
1981 7289 0.0 0.0 0.0
1982 8455 0.0 0.0 0.0
1983 8406 0.0 0.0 0.0
1984 8364 0.0 0.0 0.0
1985 8021 0.0 0.0 0.0
1986 8441 0.0 0.0 0.0
1987 7094 0.0 0.0 0.0
1988 6993 0.0 0.0 0.0
1989 955 0.0 0.0 0.0

For data sources see[5]

References