X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0674173011000

Well Details

Well ID: 0674173011000
Loading map...
Location: 00/11-30-067-17W4/0
Location Alias: 00/11-30-67-17 W4M
Location Alias 2: 00/11-30-067-17 W4/00
Country: Canada
Province: Alberta
Township: 067
Meridian: 4
Range: 17
Section: 30
County/Municipality: Athabasca County
Well Name: SUPTST ATMORE 11-30-67-17
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0051087
License Date: 1974-09-09
License Status: RecCertified
Spud Date: 1974-09-26
Final Drill Date: 1974-09-29
Well Total Depth: 500.50 m
Surface Hole Latitude: 54.830187
Surface Hole Longitude: -112.589640

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1974-09-09 Obtained License
1974-09-29 Finished Drilling
1974-09-29 Well Mode changed to Drilled and Cased
1974-09-30 Lost Circulation Occurred
1974-10-01 Production Casing Operation Performed
1974-10-29 Perforation Treatment Performed - Jet Perforation
1976-03-15 Well Began Production
1976-03-15 Well Fluid changed to Gas
1976-03-15 Well Mode changed to Flowing
1989-08-20 Well Log Performed
1989-08-21 Perforation Treatment Performed - Jet Perforation
1989-09-07 Well Fluid changed to Gas
1989-09-07 Well Mode changed to Flowing
1997-07-31 Well Fluid changed to Gas
1997-07-31 Well Mode changed to Suspended
2003-02-11 Perforation Treatment Performed - Cement Squeeze
2003-02-11 Plug Back Performed
2003-02-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-02-14 Plug Back Performed
2003-02-14 Well Fluid changed to Gas
2003-02-14 Well Mode changed to Abandoned Zone
2003-07-30 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1974-10-29 Perforation 493.20 496.20 7
1989-08-21 Perforation 348.40 349.90 13
1989-08-21 Perforation 353.00 354.80 13
2003-02-11 Cement Squeeze 348.00 355.00 0
2003-02-14 Packing Device Capped w/Cement 474.00 482.00 0
2003-02-14 Packing Device Capped w/Cement 332.00 340.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 6012 0.0 0.0 0.0
1977 8598 0.0 0.0 0.0
1978 7420 0.0 0.0 0.0
1979 8015 0.0 0.0 0.0
1980 8493 0.0 0.0 0.0
1981 7827 0.0 0.0 0.0
1982 8261 0.0 0.0 0.0
1983 8441 0.0 0.0 0.0
1984 8215 0.0 0.0 0.0
1985 7002 0.0 0.0 0.0
1986 7629 0.0 0.0 0.0
1987 6165 0.0 0.0 0.0
1988 7291 0.0 0.0 0.0
1989 7323 0.0 0.0 0.0
1990 7710 0.0 0.0 0.0
1991 7634 0.0 0.0 0.0
1992 7155 0.0 0.0 0.0
1993 97 0.0 0.0 0.0
1994 699 0.0 0.0 0.0
1995 3466 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1974-09-30 Lost Circulation 500.50 500.50

For data sources see[6]

References