X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0674193206000

Well Details

Well ID: 0674193206000
Loading map...
Location: 00/06-32-067-19W4/0
Location Alias: 00/06-32-67-19 W4M
Location Alias 2: 00/06-32-067-19 W4/00
Country: Canada
Province: Alberta
Township: 067
Meridian: 4
Range: 19
Section: 32
County/Municipality: Athabasca County
Well Name: ALLIED ET AL PROSPERITY 6-32-67-19
Operator Name: Cavalier Energy Limited
License Number: 0042504
License Date: 1972-05-12
License Status: Re-Entered
Spud Date: 1972-05-14
Final Drill Date: 1972-05-20
Well Total Depth: 571.80 m
Surface Hole Latitude: 54.838524
Surface Hole Longitude: -112.869152

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1972-05-12 Obtained License
1972-05-20 Finished Drilling
1972-05-21 Production Casing Operation Performed
1972-05-29 Perforation Treatment Performed - Jet Perforation
1972-05-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-05-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-06-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-06-09 Well Mode changed to Drilled and Cased
1975-06-11 Perforation Treatment Performed - Jet Perforation
1976-05-01 Well Began Production
1976-05-01 Well Fluid changed to Gas
1976-05-01 Well Mode changed to Flowing
1979-03-25 Perforation Treatment Performed - Cement Squeeze
1979-03-26 Perforation Treatment Performed - Jet Perforation
1979-03-26 Well Fluid changed to Gas
1979-03-26 Well Mode changed to Suspended
1981-02-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1981-02-22 Perforation Treatment Performed - Jet Perforation
1981-02-22 Well Fluid changed to Gas
1981-02-22 Well Mode changed to Abandoned Zone
1992-09-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-09-23 Plug Back Performed
1992-09-23 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1972-05-29 Perforation 537.40 540.70 7
1981-02-22 Perforation 392.10 393.50 13
1981-02-22 Perforation 394.10 395.00 13
1992-09-23 Packing Device Capped w/Cement 375.00 383.00 0
1972-05-30 Acid Treatment 537.40 540.70 0
1972-05-31 Acid Treatment 537.40 540.70 0
1972-06-02 Acid Treatment 537.40 540.70 0
1975-06-11 Perforation 388.60 390.10 10
1979-03-25 Cement Squeeze 388.60 390.10 0
1979-03-26 Perforation 537.40 540.70 7
1981-02-21 Packing Device Capped w/Cement 513.00 522.00 0
1981-02-22 Perforation 388.60 390.10 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 4784 0.0 0.0 0.0
1977 7914 0.0 0.0 0.0
1978 7523 0.0 0.0 0.0
1979 1944 0.0 0.0 0.0

For data sources see[5]

References