If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0674230811000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.785665,"lon":-113.479128,"icon":""}]} |
Location: 00/11-08-067-23W4/0 | |
Location Alias: 00/11-08-67-23 W4M | |
Location Alias 2: 00/11-08-067-23 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 067 | |
Meridian: 4 | |
Range: 23 | |
Section: 08 | |
County/Municipality: Athabasca County | |
Well Name: CNRL BAPTISTE 11-8-67-23 | |
Operator Name: Canadian Natural Resources Limited | |
License Number: 0061433 | |
License Date: 1976-12-02 | |
License Status: Suspension | |
Spud Date: 1977-02-10 | |
Final Drill Date: 1977-02-15 | |
Well Total Depth: 621.80 m | |
Surface Hole Latitude: 54.785665 | |
Surface Hole Longitude: -113.479128 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1976-12-02 | Obtained License |
1977-02-11 | Water Flow Occurred |
1977-02-15 | Drill Stem Test Performed |
1977-02-15 | Finished Drilling |
1977-02-16 | Drill Stem Test Performed |
1977-02-17 | Drill Stem Test Performed |
1977-02-21 | Drill Stem Test Performed |
1977-02-22 | Production Casing Operation Performed |
1977-03-26 | Perforation Treatment Performed - Jet Perforation |
1977-03-30 | Well Mode changed to Drilled and Cased |
2012-03-09 | Well Log Performed |
2012-03-10 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2012-03-10 | Perforation Treatment Performed - Jet Perforation |
2012-03-10 | Plug Back Performed |
2012-03-10 | Well Log Performed |
2012-03-10 | Well Mode changed to Abandoned Zone |
2012-03-11 | Perforation Treatment Performed - Remedial Casing |
2012-09-09 | Well Log Performed |
2012-09-11 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2012-09-11 | Perforation Treatment Performed - Jet Perforation |
2012-09-11 | Well Log Performed |
2012-09-13 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2012-09-13 | Perforation Treatment Performed - Remedial Casing |
2013-10-20 | Well Log Performed |
2013-10-22 | Perforation Treatment Performed - Jet Perforation |
2013-10-22 | Well Log Performed |
2013-10-23 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2013-10-23 | Perforation Treatment Performed - Remedial Casing |
2014-10-03 | Well Log Performed |
2014-10-07 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2014-10-07 | Perforation Treatment Performed - Jet Perforation |
2014-10-07 | Well Log Performed |
2014-10-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2014-10-08 | Perforation Treatment Performed - Remedial Casing |
2016-12-01 | Well Log Performed |
2016-12-03 | Perforation Treatment Performed - Jet Perforation |
2016-12-03 | Well Log Performed |
2016-12-04 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2016-12-04 | Perforation Treatment Performed - Remedial Casing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1977-03-26 | Perforation | 453.80 | 455.40 | 13 |
2012-09-13 | Packing Device Capped w/Cement | 216.00 | 224.00 | 0 |
2013-10-22 | Perforation | 228.00 | 229.00 | 17 |
2013-10-22 | Perforation | 232.00 | 235.00 | 17 |
2013-10-23 | Remedial Casing Cementing | 228.00 | 235.00 | 0 |
2013-10-23 | Packing Device Capped w/Cement | 215.00 | 223.00 | 0 |
2014-10-07 | Packing Device Capped w/Cement | 267.00 | 275.00 | 0 |
2014-10-07 | Perforation | 227.00 | 230.00 | 17 |
2014-10-08 | Remedial Casing Cementing | 227.00 | 230.00 | 0 |
2014-10-08 | Packing Device Capped w/Cement | 214.00 | 222.00 | 0 |
2016-12-03 | Perforation | 234.00 | 236.00 | 17 |
2012-03-10 | Packing Device Capped w/Cement | 440.00 | 448.00 | 0 |
2016-12-04 | Remedial Casing Cementing | 234.00 | 236.00 | 0 |
2016-12-04 | Packing Device Capped w/Cement | 207.00 | 218.00 | 0 |
2012-03-10 | Perforation | 399.00 | 402.00 | 13 |
2012-03-10 | Packing Device Capped w/Cement | 387.00 | 395.00 | 0 |
2012-03-10 | Perforation | 283.00 | 286.00 | 13 |
2012-03-11 | Remedial Casing Cementing | 283.00 | 286.00 | 0 |
2012-09-11 | Packing Device Capped w/Cement | 268.00 | 276.00 | 0 |
2012-09-11 | Perforation | 229.00 | 232.00 | 13 |
2012-09-13 | Remedial Casing Cementing | 229.00 | 232.00 | 0 |
For data sources see[4]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1977-02-11 | Water Flow | 108.20 | 0.00 |
2012-09-14 | No Incident Encountered | 0.00 | 0.00 |
2013-10-23 | No Incident Encountered | 0.00 | 0.00 |
2015-09-16 | No Incident Encountered | 0.00 | 0.00 |
2017-05-27 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[5]