X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0674231106000

Well Details

Well ID: 0674231106000
Loading map...
Location: 00/06-11-067-23W4/0
Location Alias: 00/06-11-67-23 W4M
Location Alias 2: 00/06-11-067-23 W4/00
Country: Canada
Province: Alberta
Township: 067
Meridian: 4
Range: 23
Section: 11
County/Municipality: Athabasca County
Well Name: SPL BAPTI 6-11-67-23
Operator Name: Spur Petroleum Ltd.
License Number: 0151627
License Date: 1992-02-06
License Status: Abandoned
Spud Date: 1993-02-03
Final Drill Date: 1993-02-05
Well Total Depth: 607.00 m
Surface Hole Latitude: 54.781292
Surface Hole Longitude: -113.404201

For data sources see[1][2]

Well History

Date Event
1992-02-06 Obtained License
1993-02-04 Surface Casing Operation Performed
1993-02-05 Finished Drilling
1993-02-05 Well Log Performed
1993-02-06 Drill Stem Test Performed
1993-02-06 Production Casing Operation Performed
1993-02-06 Rig Released
1993-02-06 Well Mode changed to Drilled and Cased
1994-01-20 Perforation Treatment Performed - Jet Perforation
1994-01-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-03-01 Perforation Treatment Performed - Jet Perforation
2003-02-08 Well Began Production
2003-02-08 Well Fluid changed to Gas
2003-02-08 Well Mode changed to Flowing
2005-01-23 Well Fluid changed to Gas
2005-01-23 Well Mode changed to Suspended
2006-03-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-03-14 Plug Back Performed
2006-03-14 Well Fluid changed to Gas
2006-03-14 Well Mode changed to Abandoned Zone
2006-03-15 Perforation Treatment Performed - Jet Perforation
2006-03-15 Well Log Performed
2006-03-16 Perforation Treatment Performed - Fractured
2007-01-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-01-11 Plug Back Performed
2007-01-11 Well Log Performed
2007-01-12 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-01-20 Perforation 593.00 596.50 13
1994-01-22 Acid Treatment 593.00 596.50 0
1996-03-01 Perforation 600.00 601.00 13
2006-03-14 Packing Device Capped w/Cement 582.00 590.00 0
2006-03-15 Perforation 235.00 239.00 17
2006-03-15 Perforation 205.50 209.50 17
2006-03-15 Perforation 214.50 218.50 17
2006-03-16 Fracture 205.50 218.50 0
2007-01-11 Packing Device Capped w/Cement 194.00 202.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2003 4365 0.0 0.0 0.0

For data sources see[5]

References