If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0674231307002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.795989,"lon":-113.369489,"icon":""}]} |
Location: 00/07-13-067-23W4/2 | |
Location Alias: 00/07-13-67-23 W4M | |
Location Alias 2: 00/07-13-067-23 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 067 | |
Meridian: 4 | |
Range: 23 | |
Section: 13 | |
County/Municipality: Athabasca County | |
Well Name: AMOCO BAPTISTE 7-13-67-23 | |
Operator Name: ARC Resources Ltd. | |
License Number: 0054265 | |
License Date: 1975-07-17 | |
License Status: RecCertified | |
Spud Date: 1975-09-20 | |
Final Drill Date: 1975-09-24 | |
Well Total Depth: 620.60 m | |
Surface Hole Latitude: 54.795989 | |
Surface Hole Longitude: -113.369489 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1975-07-17 | Obtained License |
1975-09-22 | Well Log Performed |
1975-09-24 | Finished Drilling |
1975-09-24 | Lost Circulation Occurred |
1975-09-27 | Production Casing Operation Performed |
1975-10-10 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1975-10-10 | Perforation Treatment Performed - Jet Perforation |
1979-02-24 | Perforation Treatment Performed - Cement Squeeze |
1979-02-28 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1979-03-01 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1979-03-01 | Perforation Treatment Performed - Jet Perforation |
1979-03-02 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1987-02-27 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1987-02-27 | Perforation Treatment Performed - Jet Perforation |
1987-02-27 | Plug Back Performed |
1987-02-28 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1987-03-01 | Well Mode changed to Drilled and Cased |
1995-02-24 | Well Began Production |
1995-02-24 | Well Fluid changed to Gas |
1995-02-24 | Well Mode changed to Flowing |
1997-10-01 | Well Fluid changed to Gas |
1997-10-01 | Well Mode changed to Suspended |
1998-05-19 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1998-05-19 | Plug Back Performed |
1998-05-19 | Well Fluid changed to Gas |
1998-05-19 | Well Mode changed to Abandoned Zone |
1998-05-21 | Perforation Treatment Performed - Jet Perforation |
1998-05-21 | Well Log Performed |
1998-05-25 | Perforation Treatment Performed - Cement Plug |
1998-05-25 | Perforation Treatment Performed - Remedial Casing |
1998-06-05 | Well Log Performed |
1998-08-10 | Well Abandoned |
1998-08-10 | Well Fluid changed to Gas |
1998-08-10 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1975-10-10 | Perforation | 588.90 | 590.40 | 7 |
1987-02-27 | Packing Device Capped w/Cement | 577.00 | 585.00 | 0 |
1987-02-27 | Perforation | 510.80 | 513.30 | 13 |
1987-02-28 | Acid Treatment | 503.30 | 513.30 | 0 |
1998-05-19 | Packing Device Capped w/Cement | 483.00 | 491.00 | 0 |
1998-05-21 | Perforation | 350.00 | 351.00 | 14 |
1998-05-25 | Remedial Casing Cementing | 350.00 | 351.00 | 0 |
1998-05-25 | Cement Plug | 303.00 | 351.00 | 0 |
1975-10-10 | Perforation | 594.40 | 595.60 | 7 |
1975-10-10 | Acid Treatment | 588.90 | 595.60 | 0 |
1979-02-24 | Cement Squeeze | 594.40 | 595.60 | 0 |
1979-02-28 | Acid Treatment | 588.90 | 590.40 | 0 |
1979-03-01 | Perforation | 511.80 | 512.40 | 6 |
1979-03-01 | Perforation | 503.30 | 505.10 | 6 |
1979-03-01 | Acid Treatment | 503.30 | 512.40 | 0 |
1979-03-02 | Acid Treatment | 503.30 | 512.40 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1995 | 3131 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1975-09-24 | Lost Circulation | 620.60 | 620.60 |
For data sources see[6]