X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0674262706004

Well Details

Well ID: 0674262706004
Loading map...
Location: 00/06-27-067-26W4/4
Location Alias: 00/06-27-67-26 W4M
Location Alias 2: 00/06-27-067-26 W4/04
Country: Canada
Province: Alberta
Township: 067
Meridian: 4
Range: 26
Section: 27
County/Municipality: Municipal District of Lesser Slave River No. 124
Well Name: CNRL BIG BEND 6-27-67-26
Operator Name: Canadian Natural Resources Limited
License Number: 0076842
License Date: 1979-07-11
License Status: Suspension
Spud Date: 1979-08-13
Final Drill Date: 1979-08-20
Well Total Depth: 860.00 m
Surface Hole Latitude: 54.826391
Surface Hole Longitude: -113.885356

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-07-11 Obtained License
1979-08-20 Finished Drilling
1979-08-20 Lost Circulation Occurred
1979-08-20 Well Mode changed to Drilled and Cased
1979-08-21 Drill Stem Test Performed
1979-08-22 Drill Stem Test Performed
1979-08-24 Production Casing Operation Performed
1979-10-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-10-03 Perforation Treatment Performed - Cement Squeeze
1979-10-03 Perforation Treatment Performed - Jet Perforation
1979-10-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-10-04 Perforation Treatment Performed - Cement Squeeze
1979-10-04 Perforation Treatment Performed - Jet Perforation
1979-10-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-10-11 Perforation Treatment Performed - Cement Squeeze
1979-10-11 Perforation Treatment Performed - Jet Perforation
1979-10-13 Perforation Treatment Performed - Jet Perforation
1979-10-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-10-17 Perforation Treatment Performed - Cement Squeeze
1979-10-23 Perforation Treatment Performed - Jet Perforation
1979-10-24 Perforation Treatment Performed - Jet Perforation
1979-10-25 Perforation Treatment Performed - Jet Perforation
1979-10-26 Perforation Treatment Performed - Jet Perforation
2007-02-02 Well Log Performed
2008-01-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-01-24 Plug Back Performed
2008-02-04 Well Log Performed
2008-02-05 Perforation Treatment Performed - Jet Perforation
2008-02-20 Well Began Production
2008-02-20 Well Fluid changed to Gas
2008-02-20 Well Mode changed to Flowing
2009-04-01 Well Fluid changed to Gas
2009-04-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-10-03 Perforation 618.00 618.30 7
1979-10-13 Perforation 608.00 608.50 13
1979-10-17 Acid Treatment 608.00 608.50 0
1979-10-17 Cement Squeeze 608.00 608.50 0
1979-10-23 Perforation 632.50 633.00 13
1979-10-24 Perforation 603.00 603.50 13
1979-10-25 Perforation 612.00 614.00 13
1979-10-26 Perforation 590.50 591.50 13
2008-01-24 Packing Device Capped w/Cement 622.00 630.00 0
2008-02-05 Perforation 599.50 601.50 17
2008-02-05 Perforation 606.00 608.00 17
1979-10-03 Acid Treatment 618.00 618.30 0
1979-10-03 Cement Squeeze 618.00 618.30 0
1979-10-04 Perforation 593.30 593.60 13
1979-10-04 Acid Treatment 593.30 593.60 0
1979-10-04 Cement Squeeze 593.30 593.60 0
1979-10-11 Perforation 634.00 634.30 13
1979-10-11 Acid Treatment 634.00 634.30 0
1979-10-11 Cement Squeeze 634.00 634.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2008 4726 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1979-08-20 Lost Circulation 860.00 860.00

For data sources see[6]

References