If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0675011505000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.797889,"lon":-114.074976,"icon":""}]} |
| Location: 00/05-15-067-01W5/0 | |
| Location Alias: 00/05-15-67-01 W5M | |
| Location Alias 2: 00/05-15-067-01 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 067 | |
| Meridian: 5 | |
| Range: 01 | |
| Section: 15 | |
| County/Municipality: Municipal District of Lesser Slave River No. 124 | |
| Well Name: DOMINION SUNBEAM NO. 1 | |
| Operator Name: Canadian Natural Resources Limited | |
| License Number: 0006467 | |
| License Date: 1953-05-20 | |
| License Status: Abandoned | |
| Spud Date: 1953-06-13 | |
| Final Drill Date: 1953-07-21 | |
| Well Total Depth: 1552.30 m | |
| Surface Hole Latitude: 54.797889 | |
| Surface Hole Longitude: -114.074976 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1953-05-20 | Obtained License |
| 1953-06-22 | Drill Stem Test Performed |
| 1953-06-23 | Drill Stem Test Performed |
| 1953-06-24 | Drill Stem Test Performed |
| 1953-06-25 | Drill Stem Test Performed |
| 1953-06-27 | Drill Stem Test Performed |
| 1953-06-29 | Drill Stem Test Performed |
| 1953-07-02 | Drill Stem Test Performed |
| 1953-07-03 | Drill Stem Test Performed |
| 1953-07-05 | Drill Stem Test Performed |
| 1953-07-11 | Drill Stem Test Performed |
| 1953-07-21 | Finished Drilling |
| 1953-07-23 | Production Casing Operation Performed |
| 1953-07-25 | Well Mode changed to Drilled and Cased |
| 1972-02-10 | Perforation Treatment Performed - Jet Perforation |
| 1972-02-12 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1972-06-15 | Well Began Production |
| 1972-06-15 | Well Fluid changed to Gas |
| 1972-06-15 | Well Mode changed to Flowing |
| 1974-07-23 | Perforation Treatment Performed - Jet Perforation |
| 1974-07-24 | Perforation Treatment Performed - Cement Squeeze |
| 1974-07-24 | Perforation Treatment Performed - Jet Perforation |
| 1974-07-25 | Perforation Treatment Performed - Cement Squeeze |
| 1974-07-27 | Perforation Treatment Performed - Jet Perforation |
| 1974-07-30 | Well Fluid changed to Gas |
| 1974-07-30 | Well Mode changed to Suspended |
| 1995-07-11 | Well Fluid changed to Gas |
| 1995-07-11 | Well Mode changed to Closed |
| 1999-06-22 | Well Fluid changed to Gas |
| 1999-06-22 | Well Mode changed to Suspended |
| 2000-07-17 | Perforation Treatment Performed - Jet Perforation |
| 2000-07-17 | Well Log Performed |
| 2010-10-25 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2010-10-25 | Plug Back Performed |
| 2010-10-25 | Well Fluid changed to Gas |
| 2010-10-25 | Well Mode changed to Abandoned Zone |
| 2010-10-26 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2010-10-26 | Perforation Treatment Performed - Cement Squeeze |
| 2010-10-26 | Plug Back Performed |
| 2010-11-02 | Perforation Treatment Performed - Jet Perforation |
| 2010-11-02 | Well Log Performed |
| 2010-11-04 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2010-11-05 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2010-11-05 | Perforation Treatment Performed - Remedial Casing |
| 2010-12-01 | Well Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1972-02-10 | Perforation | 779.70 | 781.80 | 7 |
| 2010-10-26 | Cement Squeeze | 581.00 | 584.60 | 0 |
| 2010-10-26 | Packing Device Capped w/Cement | 567.00 | 576.00 | 0 |
| 2010-11-02 | Perforation | 209.90 | 210.90 | 13 |
| 2010-11-04 | Packing Device Capped w/Cement | 533.50 | 541.50 | 0 |
| 2010-11-05 | Remedial Casing Cementing | 209.90 | 210.90 | 0 |
| 2010-11-05 | Packing Device Capped w/Cement | 195.50 | 204.50 | 0 |
| 1972-02-12 | Acid Treatment | 779.70 | 781.80 | 0 |
| 1974-07-23 | Perforation | 597.40 | 598.00 | 7 |
| 1974-07-24 | Perforation | 548.60 | 549.20 | 7 |
| 1974-07-24 | Cement Squeeze | 597.40 | 598.00 | 0 |
| 1974-07-25 | Cement Squeeze | 548.60 | 549.20 | 0 |
| 1974-07-27 | Perforation | 581.60 | 584.60 | 7 |
| 2000-07-17 | Perforation | 779.70 | 781.70 | 14 |
| 2010-10-25 | Packing Device Capped w/Cement | 762.00 | 770.00 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1972 | 5013 | 0.0 | 0.0 | 0.0 |
| 1973 | 8026 | 0.0 | 0.0 | 0.0 |
| 1974 | 4562 | 0.0 | 0.0 | 0.0 |
For data sources see[5]