If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0675011707000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.797675,"lon":-114.115121,"icon":""}]} |
| Location: 00/07-17-067-01W5/0 | |
| Location Alias: 00/07-17-67-01 W5M | |
| Location Alias 2: 00/07-17-067-01 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 067 | |
| Meridian: 5 | |
| Range: 01 | |
| Section: 17 | |
| County/Municipality: Municipal District of Lesser Slave River No. 124 | |
| Well Name: CNRL BIG BEND 7-17-67-1 | |
| Operator Name: Canadian Natural Resources Limited | |
| License Number: 0156617 | |
| License Date: 1993-02-19 | |
| License Status: Abandoned | |
| Spud Date: 1993-02-22 | |
| Final Drill Date: 1993-02-25 | |
| Well Total Depth: 786.00 m | |
| Surface Hole Latitude: 54.797675 | |
| Surface Hole Longitude: -114.115121 |
| Date | Event |
|---|---|
| 1993-02-19 | Obtained License |
| 1993-02-23 | Surface Casing Operation Performed |
| 1993-02-25 | Finished Drilling |
| 1993-02-25 | Well Log Performed |
| 1993-02-25 | Well Mode changed to Drilled and Cased |
| 1993-02-26 | Well Log Performed |
| 1993-02-27 | Drill Stem Test Performed |
| 1993-02-28 | Production Casing Operation Performed |
| 1993-02-28 | Rig Released |
| 1993-03-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1993-03-06 | Perforation Treatment Performed - Jet Perforation |
| 1993-03-06 | Well Log Performed |
| 1993-03-08 | Perforation Treatment Performed - Jet Perforation |
| 1993-03-08 | Well Log Performed |
| 1993-03-09 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1993-03-09 | Perforation Treatment Performed - Jet Perforation |
| 1993-03-09 | Well Log Performed |
| 1993-03-10 | Perforation Treatment Performed - Fractured |
| 1993-03-10 | Well Log Performed |
| 1993-03-11 | Perforation Treatment Performed - Jet Perforation |
| 1993-03-11 | Well Log Performed |
| 1993-06-01 | Well Began Production |
| 1993-06-01 | Well Fluid changed to Gas |
| 1993-06-01 | Well Mode changed to Flowing |
| 1994-07-29 | Perforation Treatment Performed - Jet Perforation |
| 1994-07-29 | Well Log Performed |
| 1999-01-31 | Well Fluid changed to Gas |
| 1999-01-31 | Well Mode changed to Suspended |
| 2005-10-04 | Well Log Performed |
| 2005-10-06 | Perforation Treatment Performed - Jet Perforation |
| 2006-10-15 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2006-10-15 | Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem |
| 2006-10-15 | Plug Back Performed |
| 2006-10-15 | Well Fluid changed to Gas |
| 2006-10-15 | Well Mode changed to Abandoned Zone |
| 2006-10-16 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2006-10-16 | Plug Back Performed |
| 2006-10-17 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2006-10-17 | Plug Back Performed |
| 2006-10-17 | Well Log Performed |
| 2006-10-25 | Perforation Treatment Performed - Jet Perforation |
| 2006-10-25 | Well Log Performed |
| 2006-10-26 | Perforation Treatment Performed - Cement Plug |
| 2006-10-26 | Perforation Treatment Performed - Remedial Casing |
| 2007-06-01 | Well Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1993-03-06 | Perforation | 767.00 | 768.00 | 13 |
| 2005-10-06 | Perforation | 560.00 | 560.80 | 17 |
| 2005-10-06 | Perforation | 555.00 | 556.00 | 17 |
| 2006-10-15 | Packing Dev Cpd w/Res-Gyp Cem | 758.50 | 761.50 | 0 |
| 2006-10-15 | Packing Device Capped w/Cement | 737.00 | 745.00 | 0 |
| 2006-10-16 | Packing Device Capped w/Cement | 567.00 | 575.00 | 0 |
| 2006-10-16 | Packing Device Capped w/Cement | 582.00 | 590.00 | 0 |
| 2006-10-16 | Packing Device Capped w/Cement | 551.00 | 559.00 | 0 |
| 2006-10-17 | Packing Device Capped w/Cement | 542.00 | 550.00 | 0 |
| 2006-10-25 | Perforation | 242.00 | 245.00 | 13 |
| 2006-10-26 | Remedial Casing Cementing | 242.00 | 245.00 | 0 |
| 1993-03-06 | Acid Treatment | 767.00 | 768.00 | 0 |
| 2006-10-26 | Cement Plug | 126.00 | 245.00 | 0 |
| 1993-03-08 | Perforation | 763.00 | 764.00 | 13 |
| 1993-03-09 | Packing Device Capped w/Cement | 765.00 | 766.00 | 0 |
| 1993-03-09 | Perforation | 756.00 | 758.00 | 13 |
| 1993-03-10 | Fracture | 756.00 | 758.00 | 0 |
| 1993-03-11 | Perforation | 580.50 | 582.00 | 13 |
| 1993-03-11 | Perforation | 756.00 | 758.00 | 13 |
| 1994-07-29 | Perforation | 596.50 | 598.50 | 13 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1993 | 3707 | 0.0 | 0.0 | 0.0 |
| 1994 | 4821 | 0.0 | 0.0 | 0.0 |
For data sources see[5]