X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0675030110002

Well Details

Well ID: 0675030110002
Loading map...
Location: 00/10-01-067-03W5/2
Location Alias: 00/10-01-67-03 W5M
Location Alias 2: 00/10-01-067-03 W5/02
Country: Canada
Province: Alberta
Township: 067
Meridian: 5
Range: 03
Section: 01
County/Municipality: Woodlands County
Well Name: CNRL AKUINU 10-1-67-3
Operator Name: Canadian Natural Resources Limited
License Number: 0163362
License Date: 1993-12-17
License Status: Suspension
Spud Date: 1994-01-17
Final Drill Date: 1994-01-21
Well Total Depth: 812.00 m
Surface Hole Latitude: 54.771252
Surface Hole Longitude: -114.318409

For data sources see[1][2]

Well History

Date Event
1993-12-17 Obtained License
1994-01-17 Well Log Performed
1994-01-19 Surface Casing Operation Performed
1994-01-21 Finished Drilling
1994-01-21 Lost Circulation Occurred
1994-01-21 Well Mode changed to Drilled and Cased
1994-01-23 Plug Back Performed
1994-01-24 Kick Occurred
1994-01-24 Well Log Performed
1994-01-25 Drill Stem Test Performed
1994-01-26 Drill Stem Test Performed
1994-01-27 Production Casing Operation Performed
1994-01-27 Rig Released
1994-02-06 Well Log Performed
1994-02-07 Perforation Treatment Performed - Jet Perforation
1994-02-09 Well Log Performed
1994-02-10 Perforation Treatment Performed - Jet Perforation
1994-02-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-02-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-02-12 Well Log Performed
1997-02-13 Perforation Treatment Performed - Jet Perforation
2000-12-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-12-07 Perforation Treatment Performed - Jet Perforation
2000-12-07 Plug Back Performed
2000-12-07 Well Log Performed
2000-12-07 Well Mode changed to Drilled and Cased
2000-12-08 Perforation Treatment Performed - Jet Perforation
2000-12-08 Well Log Performed
2000-12-08 Well Mode changed to Drilled and Cased
2001-01-01 Well Began Production
2001-01-01 Well Fluid changed to Gas
2001-01-01 Well Mode changed to Flowing
2015-03-31 Well Fluid changed to Gas
2015-03-31 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-02-07 Perforation 779.00 780.00 13
2000-12-08 Perforation 577.00 577.80 17
1994-02-07 Perforation 771.00 773.50 13
1994-02-10 Perforation 772.50 775.00 13
1994-02-12 Acid Treatment 771.00 775.00 0
1997-02-12 Packing Device Capped w/Cement 761.00 769.00 0
1997-02-13 Perforation 754.00 756.20 17
2000-12-07 Packing Device Capped w/Cement 744.00 752.00 0
2000-12-07 Perforation 591.80 592.40 17
2000-12-07 Perforation 594.50 596.50 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2001 8303 0.0 0.0 0.0
2002 8759 0.0 0.0 0.0
2003 8759 0.0 0.0 0.0
2004 8783 0.0 0.0 0.0
2005 8615 0.0 0.0 0.0
2006 8183 0.0 0.0 0.0
2007 5495 0.0 0.0 0.0
2008 5696 0.0 0.0 0.0
2009 6756 0.0 0.0 0.0
2010 8711 0.0 0.0 0.0
2011 7878 0.0 0.0 0.0
2012 8239 0.0 0.0 0.0
2013 8009 0.0 0.0 0.0
2014 8469 0.0 0.0 0.0
2015 1340 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1994-01-21 Lost Circulation 812.00 812.00
1994-01-24 Kick 812.00 812.00

For data sources see[6]

References