If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0675082105000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.806146,"lon":-115.144259,"icon":""}]} |
Location: 00/05-21-067-08W5/0 | |
Location Alias: 00/05-21-67-08 W5M | |
Location Alias 2: 00/05-21-067-08 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 067 | |
Meridian: 5 | |
Range: 08 | |
Section: 21 | |
County/Municipality: Big Lakes County | |
Well Name: ASPENLEAF 13-15 HZ SWANH 5-21-67-8 | |
Operator Name: Aspenleaf Energy Limited | |
License Number: 0437631 | |
License Date: 2011-10-13 | |
License Status: Suspension | |
Spud Date: 2011-12-19 | |
Final Drill Date: 2012-01-10 | |
Well Total Depth: 4010.00 m | |
Surface Hole Latitude: 54.806146 | |
Surface Hole Longitude: -115.144259 |
Date | Event |
---|---|
2011-10-13 | Obtained License |
2011-12-20 | Surface Casing Operation Performed |
2011-12-29 | Well Log Performed |
2012-01-01 | Direction Drilling Operation Performed - Horizontal |
2012-01-04 | Intermediate Casing Operation Performed |
2012-01-10 | Finished Drilling |
2012-01-10 | Well Log Performed |
2012-01-10 | Well Mode changed to Drilled and Cased |
2012-01-11 | Well Log Performed |
2012-01-12 | Liner Casing Operation Performed |
2012-01-12 | Perforation Treatment Performed - Open-Hole Completion |
2012-01-13 | Rig Released |
2012-01-13 | Well Log Performed |
2012-02-13 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-02-14 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-02-15 | Well Began Production |
2012-02-15 | Well Fluid changed to Crude Oil |
2012-02-15 | Well Mode changed to Pumping |
2016-08-31 | Well Fluid changed to Crude Oil |
2016-08-31 | Well Mode changed to Suspended |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2012-01-01 | 1973.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-01-12 | Open Hole/Barefoot Completion | 4008.00 | 4010.00 | 0 |
2012-02-13 | Multi-Stage Fracture | 3569.20 | 3570.40 | 0 |
2012-02-13 | Multi-Stage Fracture | 3514.40 | 3515.20 | 0 |
2012-02-13 | Multi-Stage Fracture | 3460.90 | 3462.00 | 0 |
2012-02-13 | Multi-Stage Fracture | 3418.00 | 3418.80 | 0 |
2012-02-13 | Multi-Stage Fracture | 3363.70 | 3364.80 | 0 |
2012-02-13 | Multi-Stage Fracture | 3308.80 | 3309.60 | 0 |
2012-02-13 | Multi-Stage Fracture | 3254.30 | 3255.40 | 0 |
2012-02-13 | Multi-Stage Fracture | 3199.60 | 3200.40 | 0 |
2012-02-13 | Multi-Stage Fracture | 3157.40 | 3158.50 | 0 |
2012-02-13 | Multi-Stage Fracture | 3102.60 | 3103.40 | 0 |
2012-02-13 | Multi-Stage Fracture | 3985.40 | 3986.70 | 0 |
2012-02-13 | Multi-Stage Fracture | 3048.60 | 3049.80 | 0 |
2012-02-13 | Multi-Stage Fracture | 2994.10 | 2994.90 | 0 |
2012-02-13 | Multi-Stage Fracture | 2941.90 | 2943.10 | 0 |
2012-02-13 | Multi-Stage Fracture | 2889.40 | 2890.20 | 0 |
2012-02-13 | Multi-Stage Fracture | 2838.10 | 2838.90 | 0 |
2012-02-13 | Multi-Stage Fracture | 2787.50 | 2788.30 | 0 |
2012-02-13 | Multi-Stage Fracture | 2736.60 | 2737.40 | 0 |
2012-02-13 | Multi-Stage Fracture | 2686.00 | 2686.80 | 0 |
2012-02-14 | Multi-Stage Fracture | 2634.60 | 2635.40 | 0 |
2012-02-14 | Multi-Stage Fracture | 2581.70 | 2582.50 | 0 |
2012-02-13 | Multi-Stage Fracture | 3937.90 | 3938.70 | 0 |
2012-02-14 | Multi-Stage Fracture | 2529.00 | 2529.80 | 0 |
2012-02-14 | Multi-Stage Fracture | 2475.80 | 2476.60 | 0 |
2012-02-13 | Multi-Stage Fracture | 3884.00 | 3885.10 | 0 |
2012-02-13 | Multi-Stage Fracture | 3829.30 | 3830.10 | 0 |
2012-02-13 | Multi-Stage Fracture | 3775.00 | 3776.20 | 0 |
2012-02-13 | Multi-Stage Fracture | 3720.40 | 3721.20 | 0 |
2012-02-13 | Multi-Stage Fracture | 3678.00 | 3679.10 | 0 |
2012-02-13 | Multi-Stage Fracture | 3623.40 | 3624.20 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 7095 | 0.0 | 0.0 | 0.0 |
2013 | 8553 | 0.0 | 0.0 | 0.0 |
2014 | 7776 | 0.0 | 0.0 | 0.0 |
For data sources see[6]