If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0675082109000 | Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. To navigate, press the arrow keys. |
Location: 00/09-21-067-08W5/0 | |
Location Alias: 00/09-21-67-08 W5M | |
Location Alias 2: 00/09-21-067-08 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 067 | |
Meridian: 5 | |
Range: 08 | |
Section: 21 | |
County/Municipality: Big Lakes County | |
Well Name: ASPENLEAF 16-28 HZ SWANH 9-21-67-8 | |
Operator Name: Aspenleaf Energy Limited | |
License Number: 0435686 | |
License Date: 2011-08-03 | |
License Status: Amended | |
Spud Date: 2011-08-30 | |
Final Drill Date: 2011-09-18 | |
Well Total Depth: 4010.00 m | |
Surface Hole Latitude: 54.832697 | |
Surface Hole Longitude: -115.149965 |
Date | Event |
---|---|
2011-08-03 | Obtained License |
2011-09-01 | Surface Casing Operation Performed |
2011-09-05 | Direction Drilling Operation Performed - Horizontal |
2011-09-05 | Well Log Performed |
2011-09-07 | Well Log Performed |
2011-09-08 | Intermediate Casing Operation Performed |
2011-09-18 | Finished Drilling |
2011-09-18 | Well Log Performed |
2011-09-18 | Well Mode changed to Drilled and Cased |
2011-09-20 | Well Log Performed |
2011-09-21 | Well Log Performed |
2011-09-22 | Rig Released |
2011-09-22 | Well Log Performed |
2012-01-01 | Well Began Production |
2012-01-01 | Well Fluid changed to Crude Oil |
2012-01-01 | Well Mode changed to Pumping |
2012-01-11 | Liner Casing Operation Performed |
2012-01-11 | Perforation Treatment Performed - Open-Hole Completion |
2012-01-14 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-01-15 | Perforation Treatment Performed - Multi-Stage Fracture |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-09-05 | 1995.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-01-11 | Open Hole/Barefoot Completion | 4006.00 | 4010.00 | 0 |
2012-01-14 | Multi-Stage Fracture | 3399.20 | 3400.30 | 0 |
2012-01-14 | Multi-Stage Fracture | 3333.70 | 3334.50 | 0 |
2012-01-15 | Multi-Stage Fracture | 3268.90 | 3270.00 | 0 |
2012-01-15 | Multi-Stage Fracture | 3215.30 | 3216.10 | 0 |
2012-01-15 | Multi-Stage Fracture | 3150.30 | 3151.50 | 0 |
2012-01-15 | Multi-Stage Fracture | 3086.00 | 3086.80 | 0 |
2012-01-15 | Multi-Stage Fracture | 3021.30 | 3022.40 | 0 |
2012-01-15 | Multi-Stage Fracture | 2956.10 | 2956.90 | 0 |
2012-01-15 | Multi-Stage Fracture | 2892.80 | 2893.60 | 0 |
2012-01-15 | Multi-Stage Fracture | 2830.70 | 2831.50 | 0 |
2012-01-14 | Multi-Stage Fracture | 3984.00 | 3985.30 | 0 |
2012-01-15 | Multi-Stage Fracture | 2766.80 | 2767.60 | 0 |
2012-01-15 | Multi-Stage Fracture | 2703.60 | 2704.40 | 0 |
2012-01-15 | Multi-Stage Fracture | 2640.20 | 2641.00 | 0 |
2012-01-15 | Multi-Stage Fracture | 2577.10 | 2577.90 | 0 |
2012-01-15 | Multi-Stage Fracture | 2514.70 | 2515.50 | 0 |
2012-01-15 | Multi-Stage Fracture | 2453.10 | 2453.90 | 0 |
2012-01-14 | Multi-Stage Fracture | 3843.10 | 3843.90 | 0 |
2012-01-14 | Multi-Stage Fracture | 3778.50 | 3779.60 | 0 |
2012-01-14 | Multi-Stage Fracture | 3712.90 | 3713.70 | 0 |
2012-01-14 | Multi-Stage Fracture | 3647.70 | 3648.90 | 0 |
2012-01-14 | Multi-Stage Fracture | 3582.80 | 3583.60 | 0 |
2012-01-14 | Multi-Stage Fracture | 3517.60 | 3518.70 | 0 |
2012-01-14 | Multi-Stage Fracture | 3464.70 | 3465.50 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 7404 | 0.0 | 0.0 | 0.0 |
2013 | 8173 | 0.0 | 0.0 | 0.0 |
2014 | 7748 | 0.0 | 0.0 | 0.0 |
2015 | 8251 | 0.0 | 0.0 | 0.0 |
2016 | 7068 | 0.0 | 0.0 | 0.0 |
2017 | 8486 | 0.0 | 0.0 | 0.0 |
2018 | 6908 | 0.0 | 0.0 | 0.0 |
2019 | 7522 | 0.0 | 0.0 | 0.0 |
2020 | 1505 | 0.0 | 0.0 | 0.0 |
For data sources see[6]