X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0675093110000

Well Details

Well ID: 0675093110000
Loading map...
Location: 00/10-31-067-09W5/0
Location Alias: 00/10-31-67-09 W5M
Location Alias 2: 00/10-31-067-09 W5/00
Country: Canada
Province: Alberta
Township: 067
Meridian: 5
Range: 09
Section: 31
County/Municipality: Big Lakes County
Well Name: 1976082 SWANH 10-31-67-9
Operator Name: Razor Energy Corp.
License Number: 0025180
License Date: 1963-11-20
License Status: Issued
Spud Date: 1963-11-27
Final Drill Date: 1963-12-18
Well Total Depth: 2333.50 m
Surface Hole Latitude: 54.845423
Surface Hole Longitude: -115.358644

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1963-11-20 Obtained License
1963-12-18 Finished Drilling
1963-12-18 Well Mode changed to Drilled and Cased
1963-12-19 Production Casing Operation Performed
1964-01-09 Perforation Treatment Performed - Bullet Perforation
1964-01-10 Perforation Treatment Performed - Acid Wash - No Pressure
1964-01-23 Well Began Production
1964-01-23 Well Fluid changed to Crude Oil
1964-01-23 Well Mode changed to Flowing
1968-03-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-06-18 Well Fluid changed to Crude Oil
1973-06-18 Well Mode changed to Pumping
2010-03-03 Perforation Treatment Performed - Jet Perforation
2010-03-04 Well Log Performed
2010-03-06 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1964-01-09 Bullet Perforation 2284.20 2284.80 0
2010-03-03 Perforation 2316.40 2318.20 13
2010-03-03 Perforation 2310.30 2314.80 13
2010-03-03 Perforation 2306.00 2308.10 13
2010-03-03 Perforation 2289.20 2295.60 13
2010-03-03 Perforation 2287.10 2287.70 13
2010-03-03 Perforation 2283.50 2285.30 13
2010-03-06 Acid Treatment 2283.50 2318.20 0
1964-01-09 Bullet Perforation 2285.40 2290.30 0
1964-01-09 Bullet Perforation 2290.90 2292.10 0
1964-01-09 Bullet Perforation 2293.30 2293.90 0
1964-01-09 Bullet Perforation 2294.50 2295.10 0
1964-01-09 Bullet Perforation 2307.60 2307.90 0
1964-01-09 Bullet Perforation 2310.70 2311.00 0
1964-01-10 Acid Wash 2284.20 2311.00 0
1968-03-15 Acid Treatment 2284.20 2311.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 7594 0.0 0.0 0.0
1968 6046 0.0 0.0 0.0
1969 8314 0.0 0.0 0.0
1970 8466 0.0 0.0 0.0
1971 8640 0.0 0.0 0.0
1972 8396 0.0 0.0 0.0
1973 8659 0.0 0.0 0.0
1974 8668 0.0 0.0 0.0
1975 8566 0.0 0.0 0.0
1976 8757 0.0 0.0 0.0
1977 8682 0.0 0.0 0.0
1978 8554 0.0 0.0 0.0
1979 8176 0.0 0.0 0.0
1980 8391 0.0 0.0 0.0
1981 7602 0.0 0.0 0.0
1982 8252 0.0 0.0 0.0
1983 8091 0.0 0.0 0.0
1984 8506 0.0 0.0 0.0
1985 8391 0.0 0.0 0.0
1986 8588 0.0 0.0 0.0
1987 8427 0.0 0.0 0.0
1988 8189 0.0 0.0 0.0
1989 8248 0.0 0.0 0.0
1990 8628 0.0 0.0 0.0
1991 8050 0.0 0.0 0.0
1992 8663 0.0 0.0 0.0
1993 8609 0.0 0.0 0.0
1994 8759 0.0 0.0 0.0
1995 8706 0.0 0.0 0.0
1996 8632 0.0 0.0 0.0
1997 8611 0.0 0.0 0.0
1998 8632 0.0 0.0 0.0
1999 8331 0.0 0.0 0.0
2000 8573 0.0 0.0 0.0
2001 8723 0.0 0.0 0.0
2002 8752 0.0 0.0 0.0
2003 8645 0.0 0.0 0.0
2004 6601 0.0 0.0 0.0
2005 4921 0.0 0.0 0.0
2006 1896 0.0 0.0 0.0
2007 7740 0.0 0.0 0.0
2008 8622 0.0 0.0 0.0
2009 8526 0.0 0.0 0.0
2010 8225 0.0 0.0 0.0
2011 7706 0.0 0.0 0.0
2012 7356 0.0 0.0 0.0
2013 3065 0.0 0.0 0.0
2014 6741 0.0 0.0 0.0
2015 7952 0.0 0.0 0.0
2016 6500 0.0 0.0 0.0
2017 8615 0.0 0.0 0.0
2018 8564 0.0 0.0 0.0
2019 8176 0.0 0.0 0.0
2020 2159 0.0 0.0 0.0

For data sources see[5]

References