X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0675093304000

Well Details

Well ID: 0675093304000
Loading map...
Location: 00/04-33-067-09W5/0
Location Alias: 00/04-33-67-09 W5M
Location Alias 2: 00/04-33-067-09 W5/00
Country: Canada
Province: Alberta
Township: 067
Meridian: 5
Range: 09
Section: 33
County/Municipality: Big Lakes County
Well Name: 1976082 SWANH 4-33-67-9
Operator Name: Razor Energy Corp.
License Number: 0029039
License Date: 1965-09-24
License Status: Suspension
Spud Date: 1965-11-13
Final Drill Date: 1965-12-03
Well Total Depth: 2385.10 m
Surface Hole Latitude: 54.837792
Surface Hole Longitude: -115.320203

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1965-09-24 Obtained License
1965-12-03 Finished Drilling
1965-12-03 Well Mode changed to Drilled and Cased
1965-12-04 Production Casing Operation Performed
1965-12-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-12-11 Perforation Treatment Performed - Selective Jet Perforations
1965-12-13 Well Began Production
1965-12-13 Well Fluid changed to Crude Oil
1965-12-13 Well Mode changed to Pumping
1969-03-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1971-03-16 Perforation Treatment Performed - Selective Jet Perforations
1971-03-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-10-01 Well Fluid changed to Crude Oil
1980-10-01 Well Mode changed to Suspended
1987-11-01 Well Fluid changed to Crude Oil
1987-11-01 Well Mode changed to Pumping
1988-01-14 Well Fluid changed to Crude Oil
1988-01-14 Well Mode changed to Suspended
1988-06-13 Well Log Performed
1988-06-16 Well Log Performed
1988-07-13 Well Log Performed
1988-10-13 Well Began Injection
1988-10-13 Well Fluid changed to Water
1988-10-13 Well Type changed to Injection
1992-11-01 Perforation Treatment Performed - Cement Squeeze
1992-11-06 Well Log Performed
1992-11-07 Perforation Treatment Performed - Jet Perforation
1992-11-11 Perforation Treatment Performed - Jet Perforation
1992-11-11 Well Log Performed
1993-02-22 Well Log Performed
1996-08-31 Well Fluid changed to Water
1996-08-31 Well Mode changed to Suspended
1996-08-31 Well Type changed to Injection
1996-09-14 Perforation Treatment Performed - Jet Perforation
1996-09-14 Well Log Performed
1996-09-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-09-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-09-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-09-19 Plug Back Performed
1996-09-19 Well Fluid changed to Water
1996-09-19 Well Mode changed to Abandoned Zone
1996-09-19 Well Type changed to Injection
1996-09-24 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1965-12-11 Selective Jet Perforations 2337.50 2337.80 0
1971-03-16 Selective Jet Perforations 2355.50 2355.80 0
1971-03-17 Acid Treatment 2352.80 2355.80 0
1992-11-01 Cement Squeeze 2337.50 2355.80 0
1992-11-07 Perforation 2349.40 2356.40 13
1992-11-07 Perforation 2358.00 2361.00 13
1992-11-07 Perforation 2362.80 2372.00 13
1992-11-11 Perforation 2363.00 2372.00 13
1996-09-14 Perforation 2351.80 2356.40 13
1996-09-14 Perforation 2362.80 2370.00 13
1996-09-15 Acid Treatment 2351.80 2356.40 0
1965-12-11 Selective Jet Perforations 2338.70 2339.00 0
1996-09-15 Acid Treatment 2362.80 2370.70 0
1996-09-18 Acid Treatment 2349.40 2372.00 0
1996-09-19 Packing Device Capped w/Cement 2326.00 2334.00 0
1965-12-11 Selective Jet Perforations 2339.30 2339.60 0
1965-12-11 Selective Jet Perforations 2340.30 2340.90 0
1965-12-11 Selective Jet Perforations 2342.40 2342.40 0
1965-12-11 Acid Treatment 2337.50 2342.40 0
1969-03-16 Acid Treatment 2337.50 2342.40 0
1971-03-16 Selective Jet Perforations 2352.80 2353.10 0
1971-03-16 Selective Jet Perforations 2353.40 2355.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 6578 0.0 0.0 0.0
1968 8068 0.0 0.0 0.0
1969 8411 0.0 0.0 0.0
1970 7243 0.0 0.0 0.0
1971 7691 0.0 0.0 0.0
1972 8213 0.0 0.0 0.0
1973 7326 0.0 0.0 0.0
1974 8297 0.0 0.0 0.0
1975 8497 0.0 0.0 0.0
1976 8342 0.0 0.0 0.0
1977 7894 0.0 0.0 0.0
1978 8120 0.0 0.0 0.0
1979 7487 0.0 0.0 0.0
1987 1464 0.0 0.0 0.0
1988 312 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0

For data sources see[5]

References