X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0675100710000

Well Details

Well ID: 0675100710000
Loading map...
Location: 00/10-07-067-10W5/0
Location Alias: 00/10-07-67-10 W5M
Location Alias 2: 00/10-07-067-10 W5/00
Country: Canada
Province: Alberta
Township: 067
Meridian: 5
Range: 10
Section: 07
County/Municipality: Big Lakes County
Well Name: SABRE ENERGY SWANH 10-7-67-10
Operator Name: Sabre Energy Ltd.
License Number: 0019581
License Date: 1960-08-23
License Status: RecCertified
Spud Date: 1961-01-07
Final Drill Date: 1961-02-04
Well Total Depth: 2624.30 m
Surface Hole Latitude: 54.786833
Surface Hole Longitude: -115.510843

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1960-08-23 Obtained License
1961-02-04 Finished Drilling
1961-02-04 Well Mode changed to Drilled and Cased
1961-02-05 Production Casing Operation Performed
1961-02-09 Perforation Treatment Performed - Jet Perforation
1961-02-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-02-11 Well Began Production
1961-02-11 Well Fluid changed to Crude Oil
1961-02-11 Well Mode changed to Flowing
1962-09-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-09-05 Perforation Treatment Performed - Jet Perforation
1963-03-21 Perforation Treatment Performed - Jet Perforation
1963-03-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-08-23 Well Began Injection
1963-08-23 Well Fluid changed to Water
1963-08-23 Well Type changed to Injection
1989-07-11 Well Log Performed
1989-07-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-07-12 Plug Back Performed
1990-11-29 Perforation Treatment Performed - Cement Plug
1990-11-29 Plug Back Performed
1990-11-29 Well Fluid changed to Water
1990-11-29 Well Mode changed to Abandoned
1990-11-29 Well Type changed to Injection
1990-12-01 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1961-02-09 Perforation 2607.90 2610.00 13
1989-07-12 Packing Device Capped w/Cement 2502.00 2510.00 0
1990-11-29 Cement Plug 245.00 350.00 0
1961-02-10 Acid Treatment 2607.90 2610.00 0
1962-09-05 Perforation 2572.50 2575.60 7
1962-09-05 Acid Treatment 2572.50 2610.00 0
1963-03-21 Perforation 2602.70 2606.00 7
1963-03-21 Perforation 2592.90 2594.80 7
1963-03-21 Perforation 2560.60 2572.50 7
1963-03-21 Perforation 2548.40 2560.60 7
1963-03-22 Acid Treatment 2548.40 2610.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 0 0.0 0.0 0.0
1970 0 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0

For data sources see[5]

References