X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0675101412020

Well Details

Well ID: 0675101412020
Loading map...
Location: 02/12-14-067-10W5/0
Location Alias: 02/12-14-67-10 W5M
Location Alias 2: 02/12-14-067-10 W5/00
Country: Canada
Province: Alberta
Township: 067
Meridian: 5
Range: 10
Section: 14
County/Municipality: Big Lakes County
Well Name: CNRL UNIT SWANH 12-14-67-10
Operator Name: Canadian Natural Resources Limited
License Number: 0047581
License Date: 1973-10-10
License Status: Issued
Spud Date: 1973-11-11
Final Drill Date: 1974-01-06
Well Total Depth: 2624.30 m
Surface Hole Latitude: 54.797589
Surface Hole Longitude: -115.415892

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1973-10-10 Obtained License
1973-11-11 Direction Drilling Operation Performed - 98
1974-01-06 Finished Drilling
1974-01-06 Well Mode changed to Drilled and Cased
1974-01-09 Production Casing Operation Performed
1974-01-26 Perforation Treatment Performed - Jet Perforation
1974-01-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-02-06 Well Began Production
1974-02-06 Well Fluid changed to Crude Oil
1974-02-06 Well Mode changed to Flowing
1977-04-04 Perforation Treatment Performed - Cement Squeeze
1977-04-06 Perforation Treatment Performed - Jet Perforation
1977-05-04 Perforation Treatment Performed - Jet Perforation
1977-05-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-05-10 Well Log Performed
1977-05-13 Well Fluid changed to Crude Oil
1977-05-13 Well Mode changed to Pumping
1979-10-10 Perforation Treatment Performed - Cement Squeeze
1979-10-13 Perforation Treatment Performed - Cement Plug
1984-04-30 Well Fluid changed to Crude Oil
1984-04-30 Well Mode changed to Suspended
1987-07-22 Well Log Performed
1988-02-08 Well Log Performed
1988-02-09 Perforation Treatment Performed - Jet Perforation
1988-02-09 Well Log Performed
1988-02-11 Perforation Treatment Performed - Acid Wash - No Pressure
1988-03-17 Well Fluid changed to Crude Oil
1988-03-17 Well Mode changed to Pumping
1995-02-06 Perforation Treatment Performed - Jet Perforation
1995-02-06 Well Log Performed
1995-02-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-03-16 Well Began Injection
1995-03-16 Well Fluid changed to Water
1995-03-16 Well Type changed to Injection
1995-04-03 Well Log Performed
2004-07-27 Perforation Treatment Performed - Jet Perforation
2004-07-30 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-08-21 Well Fluid changed to Crude Oil
2004-08-21 Well Mode changed to Pumping
2018-12-31 Well Fluid changed to Crude Oil
2018-12-31 Well Mode changed to Suspended
2020-03-01 Well Fluid changed to Crude Oil
2020-03-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1973-11-11 1174.10 Conversion

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1974-01-26 Perforation 2523.10 2526.80 3
1977-04-06 Perforation 2517.60 2519.50 7
1977-05-04 Perforation 2523.70 2526.80 3
1977-05-04 Perforation 2517.60 2519.50 7
1977-05-10 Acid Treatment 2517.60 2526.80 0
1979-10-10 Cement Squeeze 2517.60 2526.80 0
1979-10-13 Cement Plug 12.00 73.00 0
1988-02-09 Perforation 2536.50 2544.50 13
1988-02-09 Perforation 2554.00 2556.00 13
1988-02-09 Perforation 2557.00 2562.00 13
1988-02-09 Perforation 2574.00 2577.00 13
1974-01-26 Perforation 2531.10 2539.00 3
1988-02-09 Perforation 2578.00 2583.00 13
1988-02-09 Perforation 2583.00 2588.00 13
1988-02-11 Acid Wash 2536.50 2588.00 0
1995-02-06 Perforation 2520.70 2523.80 13
1995-02-06 Perforation 2525.80 2528.10 13
1995-02-06 Perforation 2529.80 2534.40 13
1995-02-08 Acid Treatment 2520.70 2588.00 0
2004-07-27 Perforation 2518.00 2520.00 13
2004-07-30 Acid Treatment 2518.00 2520.00 0
1974-01-26 Perforation 2557.30 2559.10 3
1974-01-26 Perforation 2578.60 2579.80 3
1974-01-26 Perforation 2582.30 2584.10 3
1974-01-26 Perforation 2604.80 2606.00 3
1974-01-28 Acid Treatment 2523.10 2606.00 0
1977-04-04 Cement Squeeze 2523.10 2606.00 0
1977-04-06 Perforation 2521.30 2526.80 7

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1974 7374 0.0 0.0 0.0
1975 8401 0.0 0.0 0.0
1978 5554 0.0 0.0 0.0
1988 6992 0.0 0.0 0.0
1989 7933 0.0 0.0 0.0
1990 8602 0.0 0.0 0.0
1991 2066 0.0 0.0 0.0
1992 8120 0.0 0.0 0.0
1993 8590 0.0 0.0 0.0
1994 8388 0.0 0.0 0.0
1995 533 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 1381 0.0 0.0 0.0
2005 6912 0.0 0.0 0.0
2006 7706 0.0 0.0 0.0
2007 7947 0.0 0.0 0.0
2008 8004 0.0 0.0 0.0
2009 8671 0.0 0.0 0.0
2010 8076 0.0 0.0 0.0
2011 8406 0.0 0.0 0.0
2012 8423 0.0 0.0 0.0
2013 8079 0.0 0.0 0.0
2014 5006 0.0 0.0 0.0
2015 8017 0.0 0.0 0.0
2016 5695 0.0 0.0 0.0
2017 7560 0.0 0.0 0.0
2018 3644 0.0 0.0 0.0
2020 304 0.0 0.0 0.0

For data sources see[6]

References