X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0675102404000

Well Details

Well ID: 0675102404000
Loading map...
Location: 00/04-24-067-10W5/0
Location Alias: 00/04-24-67-10 W5M
Location Alias 2: 00/04-24-067-10 W5/00
Country: Canada
Province: Alberta
Township: 067
Meridian: 5
Range: 10
Section: 24
County/Municipality: Big Lakes County
Well Name: CNRL SWANH 4-24-67-10
Operator Name: Canadian Natural Resources Limited
License Number: 0021626
License Date: 1961-11-03
License Status: Suspension
Spud Date: 1961-11-08
Final Drill Date: 1961-11-23
Well Total Depth: 2449.40 m
Surface Hole Latitude: 54.808290
Surface Hole Longitude: -115.396311

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1961-11-03 Obtained License
1961-11-23 Finished Drilling
1961-11-23 Well Mode changed to Drilled and Cased
1961-11-24 Perforation Treatment Performed - Permeator Perforation
1961-11-24 Production Casing Operation Performed
1961-12-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-12-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-12-17 Well Began Production
1961-12-17 Well Fluid changed to Crude Oil
1961-12-17 Well Mode changed to Flowing
1977-03-24 Well Fluid changed to Crude Oil
1977-03-24 Well Mode changed to Pumping
1984-09-08 Well Log Performed
1984-09-11 Well Log Performed
1984-09-12 Perforation Treatment Performed - Jet Perforation
1984-09-13 Perforation Treatment Performed - Fractured
1985-02-01 Well Fluid changed to Crude Oil
1985-02-01 Well Mode changed to Suspended
2000-07-07 Perforation Treatment Performed - Jet Perforation
2000-07-12 Well Log Performed
2000-07-15 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-07-15 Perforation Treatment Performed - Cement Squeeze
2000-07-18 Well Log Performed
2000-07-19 Perforation Treatment Performed - Jet Perforation
2000-07-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-07-22 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-07-25 Well Log Performed
2000-07-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-07-26 Plug Back Performed
2000-07-26 Well Fluid changed to Crude Oil
2000-07-26 Well Log Performed
2000-07-26 Well Mode changed to Abandoned Zone
2001-04-05 Well Log Performed
2001-04-06 Perforation Treatment Performed - Jet Perforation
2001-04-17 Well Log Performed
2001-04-19 Perforation Treatment Performed - Jet Perforation
2001-05-05 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1961-11-24 Permeator Perforation 2392.10 2405.80 0
2000-07-15 Cement Squeeze 2392.00 2437.80 0
2000-07-19 Perforation 2434.30 2437.80 20
2000-07-20 Packing Device Capped w/Cement 2444.00 2447.00 0
2000-07-22 Acid Treatment 2434.30 2437.80 0
2000-07-26 Packing Device Capped w/Cement 2379.00 2387.00 0
2001-04-06 Perforation 1315.00 1316.00 17
2001-04-06 Perforation 1399.00 1400.00 17
2001-04-19 Perforation 1390.00 1390.10 2
2001-04-19 Perforation 1387.00 1393.00 17
2001-05-05 Fracture 1315.00 1393.00 0
1961-11-24 Permeator Perforation 2415.20 2418.30 0
1961-11-24 Permeator Perforation 2423.20 2426.20 0
1961-12-09 Acid Treatment 2392.10 2426.20 0
1961-12-10 Acid Treatment 2392.10 2426.20 0
1984-09-12 Perforation 2392.00 2407.00 13
1984-09-13 Fracture 2392.00 2407.00 0
2000-07-07 Perforation 2434.30 2437.80 20
2000-07-15 Acid Treatment 2392.00 2437.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1975 24 0.0 0.0 0.0
1977 1794 0.0 0.0 0.0
1978 6856 0.0 0.0 0.0
1983 2154 0.0 0.0 0.0
1984 1193 0.0 0.0 0.0
1985 812 0.0 0.0 0.0

For data sources see[5]

References