X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0675103010000

Well Details

Well ID: 0675103010000
Loading map...
Location: 00/10-30-067-10W5/0
Location Alias: 00/10-30-67-10 W5M
Location Alias 2: 00/10-30-067-10 W5/00
Country: Canada
Province: Alberta
Township: 067
Meridian: 5
Range: 10
Section: 30
County/Municipality: Big Lakes County
Well Name: CNRL SWANH 10-30-67-10
Operator Name: Canadian Natural Resources Limited
License Number: 0014468
License Date: 1957-12-19
License Status: Issued
Spud Date: 1958-01-04
Final Drill Date: 1958-02-10
Well Total Depth: 2610.00 m
Surface Hole Latitude: 54.830641
Surface Hole Longitude: -115.510944

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1957-12-19 Obtained License
1958-01-26 Drill Stem Test Performed
1958-02-10 Finished Drilling
1958-02-15 Production Casing Operation Performed
1958-04-18 Well Mode changed to Drilled and Cased
1958-10-29 Perforation Treatment Performed - Open-Hole Completion
1958-10-30 Perforation Treatment Performed - Bullet Perforation
1958-10-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1958-11-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1958-12-23 Well Began Production
1958-12-23 Well Fluid changed to Crude Oil
1958-12-23 Well Mode changed to Flowing
1971-02-06 Perforation Treatment Performed - Jet Perforation
1971-02-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1971-02-11 Well Fluid changed to Crude Oil
1971-02-11 Well Mode changed to Pumping
1975-02-21 Well Began Injection
1975-02-21 Well Fluid changed to Solvent
1975-02-21 Well Type changed to Injection
1977-03-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-08-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-01-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-02-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-02-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-03-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-03-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-04-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-05-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-06-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-06-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-10-07 Well Log Performed
1985-07-10 Well Log Performed
1985-07-12 Perforation Treatment Performed - Fractured
1985-07-16 Well Log Performed
1985-09-13 Well Log Performed
1986-06-10 Well Log Performed
1988-10-13 Well Log Performed
1989-09-28 Well Log Performed
1990-01-09 Well Log Performed
1990-01-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-01-11 Perforation Treatment Performed - Jet Perforation
1990-01-11 Well Log Performed
1990-01-17 Well Log Performed
1993-06-22 Well Log Performed
2008-07-02 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1958-10-29 Open Hole/Barefoot Completion 2593.80 2607.00 0
1958-10-31 Acid Treatment 2593.80 2607.00 0
1958-11-03 Acid Treatment 2514.60 2574.60 0
1971-02-06 Perforation 2586.20 2587.10 7
1971-02-06 Perforation 2515.50 2520.10 7
1971-02-07 Acid Treatment 2515.50 2587.10 0
1977-03-23 Acid Treatment 2514.60 2607.00 0
1977-08-08 Acid Treatment 2514.60 2607.00 0
1978-01-21 Acid Treatment 2514.60 2607.00 0
1978-02-12 Acid Treatment 2514.60 2607.00 0
1978-02-19 Acid Treatment 2514.60 2607.00 0
1958-10-30 Bullet Perforation 2514.60 2527.40 7
1978-03-16 Acid Treatment 2514.60 2607.00 0
1978-03-31 Acid Treatment 2514.60 2607.00 0
1978-04-30 Acid Treatment 2514.60 2607.00 0
1978-05-14 Acid Treatment 2514.60 2607.00 0
1978-06-04 Acid Treatment 2514.60 2607.00 0
1978-06-25 Acid Treatment 2514.60 2607.00 0
1985-07-12 Fracture 2528.90 2574.60 0
1990-01-11 Perforation 2543.50 2545.40 13
1990-01-11 Perforation 2547.20 2547.80 13
1990-01-11 Perforation 2550.30 2555.70 13
1958-10-30 Bullet Perforation 2528.90 2530.10 7
1990-01-11 Perforation 2560.30 2566.40 13
1990-01-11 Acid Treatment 2543.50 2566.40 0
1958-10-30 Bullet Perforation 2535.30 2539.90 7
1958-10-30 Bullet Perforation 2543.60 2545.40 7
1958-10-30 Bullet Perforation 2547.20 2547.80 7
1958-10-30 Bullet Perforation 2550.30 2555.70 7
1958-10-30 Bullet Perforation 2560.30 2566.40 7
1958-10-30 Bullet Perforation 2573.10 2574.60 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1967 1670 0.0 0.0 0.0
1968 6160 0.0 0.0 0.0
1969 8653 0.0 0.0 0.0
1970 7806 0.0 0.0 0.0
1971 7975 0.0 0.0 0.0
1972 6386 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[5]

References