X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0675112510000

Well Details

Well ID: 0675112510000
Loading map...
Location: 00/10-25-067-11W5/0
Location Alias: 00/10-25-67-11 W5M
Location Alias 2: 00/10-25-067-11 W5/00
Country: Canada
Province: Alberta
Township: 067
Meridian: 5
Range: 11
Section: 25
County/Municipality: Big Lakes County
Well Name: CNRL SWANH 10-25-67-11
Operator Name: Canadian Natural Resources Limited
License Number: 0016417
License Date: 1958-12-15
License Status: Issued
Spud Date: 1959-01-09
Final Drill Date: 1959-02-09
Well Total Depth: 2678.60 m
Surface Hole Latitude: 54.830542
Surface Hole Longitude: -115.536704

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1958-12-15 Obtained License
1959-02-09 Finished Drilling
1959-02-09 Well Mode changed to Drilled and Cased
1959-02-14 Production Casing Operation Performed
1959-02-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1959-02-27 Perforation Treatment Performed - Jet Perforation
1959-02-27 Perforation Treatment Performed - Open-Hole Completion
1959-03-09 Well Began Production
1959-03-09 Well Fluid changed to Crude Oil
1959-03-09 Well Mode changed to Flowing
1970-01-31 Perforation Treatment Performed - Acid Wash - No Pressure
1970-01-31 Perforation Treatment Performed - Jet Perforation
1970-02-24 Well Began Injection
1970-02-24 Well Fluid changed to Solvent
1970-02-24 Well Type changed to Injection
1973-02-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-02-11 Perforation Treatment Performed - Acid Wash - No Pressure
1977-03-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-08-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-12-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-01-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-02-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-02-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-03-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-03-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-04-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-05-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-06-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-06-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-10-06 Well Log Performed
1985-07-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-07-09 Well Log Performed
1985-11-25 Well Log Performed
1986-06-25 Well Log Performed
1993-06-04 Well Log Performed
1995-07-20 Perforation Treatment Performed - Jet Perforation
1995-07-20 Well Log Performed
1995-07-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-10-30 Well Log Performed
2017-04-30 Well Fluid changed to Solvent
2017-04-30 Well Mode changed to Suspended
2017-04-30 Well Type changed to Injection
2017-09-01 Well Fluid changed to Solvent
2017-09-01 Well Type changed to Injection
2018-03-31 Well Fluid changed to Solvent
2018-03-31 Well Mode changed to Suspended
2018-03-31 Well Type changed to Injection
2018-11-08 Well Fluid changed to Solvent
2018-11-08 Well Type changed to Injection
2020-01-31 Well Fluid changed to Solvent
2020-01-31 Well Mode changed to Suspended
2020-01-31 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1959-02-27 Open Hole/Barefoot Completion 2635.00 2678.60 0
1977-03-23 Acid Treatment 2591.40 2678.60 0
1977-08-08 Acid Treatment 2598.10 2678.60 0
1977-12-07 Acid Treatment 2598.10 2678.60 0
1978-01-21 Acid Treatment 2598.10 2678.60 0
1978-02-12 Acid Treatment 2598.10 2678.60 0
1978-02-19 Acid Treatment 2598.10 2678.60 0
1978-03-16 Acid Treatment 2598.10 2678.60 0
1978-03-31 Acid Treatment 2598.10 2678.60 0
1978-04-30 Acid Treatment 2598.10 2678.60 0
1978-05-14 Acid Treatment 2598.10 2678.60 0
1959-02-27 Perforation 2598.10 2610.30 7
1978-06-04 Acid Treatment 2598.10 2678.60 0
1978-06-25 Acid Treatment 2598.10 2678.60 0
1985-07-07 Acid Treatment 2598.10 2631.00 0
1995-07-20 Perforation 2601.50 2605.70 13
1995-07-20 Perforation 2615.20 2617.60 13
1995-07-20 Perforation 2619.10 2621.30 13
1995-07-20 Perforation 2624.90 2626.20 13
1995-07-22 Acid Treatment 2602.00 2631.00 0
1959-02-27 Perforation 2615.80 2631.00 7
1959-02-27 Acid Treatment 2598.10 2678.60 0
1970-01-31 Perforation 2591.40 2597.50 7
1970-01-31 Acid Wash 2591.40 2597.50 0
1973-02-11 Acid Wash 2598.10 2678.60 0
1973-02-11 Acid Treatment 2613.70 2678.60 0
1973-02-11 Acid Treatment 2598.10 2678.60 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1967 6072 0.0 0.0 0.0
1968 3166 0.0 0.0 0.0
1970 0 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0

For data sources see[5]

References