X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0675180410000

Well Details

Well ID: 0675180410000
Loading map...
Location: 00/10-04-067-18W5/0
Location Alias: 00/10-04-67-18 W5M
Location Alias 2: 00/10-04-067-18 W5/00
Country: Canada
Province: Alberta
Township: 067
Meridian: 5
Range: 18
Section: 04
County/Municipality: Municipal District of Greenview No. 16
Well Name: ACCEL HOLDINGS GOOSER 10-4-67-18
Operator Name: ACCEL Canada Holdings Limited
License Number: 0024562
License Date: 1963-07-23
License Status: Abandoned
Spud Date: 1963-07-28
Final Drill Date: 1963-09-03
Well Total Depth: 2871.80 m
Surface Hole Latitude: 54.772187
Surface Hole Longitude: -116.679700

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1963-07-23 Obtained License
1963-08-05 Drill Stem Test Performed
1963-08-28 Drill Stem Test Performed
1963-09-03 Finished Drilling
1963-09-03 Well Mode changed to Drilled and Cased
1963-09-06 Production Casing Operation Performed
1963-09-09 Perforation Treatment Performed - Jet Perforation
1963-09-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-09-10 Well Began Production
1963-09-10 Well Fluid changed to Crude Oil
1963-09-10 Well Mode changed to Flowing
1975-05-27 Well Fluid changed to Crude Oil
1975-05-27 Well Mode changed to Pumping
1977-02-02 Perforation Treatment Performed - Jet Perforation
1977-02-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-02-04 Perforation Treatment Performed - Acid Wash - No Pressure
1977-02-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-02-09 Perforation Treatment Performed - Jet Perforation
1977-02-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-06-26 Well Log Performed
1980-02-14 Perforation Treatment Performed - Jet Perforation
1980-02-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-04-10 Perforation Treatment Performed - Cement Squeeze
1981-03-03 Perforation Treatment Performed - Jet Perforation
1982-08-11 Perforation Treatment Performed - Cement Squeeze
1982-08-20 Perforation Treatment Performed - Jet Perforation
1982-08-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-08-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-09-08 Perforation Treatment Performed - Cement Squeeze
1986-10-30 Perforation Treatment Performed - Jet Perforation
1986-11-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-04-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-09-26 Well Log Performed
1993-06-01 Well Fluid changed to Crude Oil
1993-06-01 Well Mode changed to Suspended
2005-07-31 Well Log Performed
2006-02-07 Perforation Treatment Performed - Jet Perforation
2006-02-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-02-09 Perforation Treatment Performed - Remedial Casing
2006-02-09 Plug Back Performed
2006-02-09 Well Fluid changed to Crude Oil
2006-02-09 Well Mode changed to Abandoned Zone
2006-02-10 Perforation Treatment Performed - Jet Perforation
2006-02-10 Well Log Performed
2006-02-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-02-11 Perforation Treatment Performed - Cement Plug
2006-02-11 Perforation Treatment Performed - Remedial Casing
2006-06-15 Well Abandoned
2006-06-15 Well Fluid changed to Crude Oil
2006-06-15 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1963-09-09 Perforation 2827.90 2831.00 7
1980-02-14 Perforation 2815.10 2821.20 13
1980-02-16 Acid Treatment 2809.00 2846.20 0
1980-04-10 Cement Squeeze 2809.00 2821.20 0
1981-03-03 Perforation 2831.00 2832.80 13
1981-03-03 Perforation 2834.50 2835.00 13
1981-03-03 Perforation 2835.90 2836.30 13
1981-03-03 Perforation 2844.00 2844.60 13
1982-08-11 Cement Squeeze 2809.00 2821.20 0
1982-08-20 Perforation 2808.70 2811.80 7
1982-08-20 Perforation 2838.90 2840.10 7
1963-09-10 Acid Treatment 2827.90 2831.00 0
1982-08-20 Perforation 2841.30 2842.00 7
1982-08-20 Perforation 2848.10 2849.90 7
1982-08-20 Perforation 2850.80 2851.40 7
1982-08-25 Acid Treatment 2808.70 2851.40 0
1982-08-31 Acid Treatment 2808.70 2851.40 0
1982-09-08 Cement Squeeze 2808.70 2811.80 0
1986-10-30 Perforation 2808.00 2812.00 13
1986-10-30 Perforation 2815.00 2825.00 13
1986-11-05 Acid Treatment 2808.00 2825.00 0
1988-04-09 Acid Treatment 2808.00 2851.40 0
1977-02-02 Perforation 2827.90 2831.00 13
2006-02-07 Perforation 1284.00 1288.00 2
2006-02-09 Packing Device Capped w/Cement 2752.00 2760.00 0
2006-02-09 Remedial Casing Cementing 1284.00 1288.00 0
2006-02-10 Perforation 449.00 450.00 17
2006-02-11 Cement Plug 1204.00 1302.00 0
2006-02-11 Remedial Casing Cementing 449.00 450.00 0
2006-02-11 Packing Device Capped w/Cement 412.40 444.40 0
1977-02-02 Perforation 2809.00 2810.30 13
1977-02-04 Acid Wash 2809.00 2810.30 0
1977-02-04 Acid Treatment 2809.00 2810.30 0
1977-02-05 Acid Treatment 2809.00 2831.00 0
1977-02-09 Perforation 2844.40 2846.20 13
1977-02-10 Acid Treatment 2844.40 2846.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 6191 0.0 0.0 0.0
1968 4067 0.0 0.0 0.0
1969 7372 0.0 0.0 0.0
1970 7192 0.0 0.0 0.0
1971 7804 0.0 0.0 0.0
1972 8300 0.0 0.0 0.0
1973 7955 0.0 0.0 0.0
1974 4174 0.0 0.0 0.0
1975 7657 0.0 0.0 0.0
1976 6263 0.0 0.0 0.0
1977 3370 0.0 0.0 0.0
1978 5169 0.0 0.0 0.0
1979 4205 0.0 0.0 0.0
1980 2990 0.0 0.0 0.0
1981 3029 0.0 0.0 0.0
1982 3011 0.0 0.0 0.0
1986 884 0.0 0.0 0.0
1987 6921 0.0 0.0 0.0
1988 7278 0.0 0.0 0.0
1989 630 0.0 0.0 0.0
1990 785 0.0 0.0 0.0
1991 7214 0.0 0.0 0.0
1992 2473 0.0 0.0 0.0

For data sources see[5]

References