X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0676082101000

Well Details

Well ID: 0676082101000
Loading map...
Location: 00/01-21-067-08W6/0
Location Alias: 00/01-21-67-08 W6M
Location Alias 2: 00/01-21-067-08 W6/00
Country: Canada
Province: Alberta
Township: 067
Meridian: 6
Range: 08
Section: 21
County/Municipality: Municipal District of Greenview No. 16
Well Name: RIMFIRE HZ WAPITI 1-21-67-8
Operator Name: Rimfire Energy Inc.
License Number: 0425310
License Date: 2010-10-29
License Status: Issued
Spud Date: 2010-11-25
Final Drill Date: 2010-12-08
Well Total Depth: 2562.00 m
Surface Hole Latitude: 54.811225
Surface Hole Longitude: -119.169349

For data sources see[1][2]

Well History

Date Event
2010-10-29 Obtained License
2010-11-26 Surface Casing Operation Performed
2010-11-28 Direction Drilling Operation Performed - Horizontal
2010-12-01 Intermediate Casing Operation Performed
2010-12-02 Well Log Performed
2010-12-08 Finished Drilling
2010-12-08 Liner Casing Operation Performed
2010-12-08 Well Log Performed
2010-12-08 Well Mode changed to Drilled and Cased
2010-12-13 Rig Released
2010-12-16 Well Log Performed
2010-12-22 Perforation Treatment Performed - Open-Hole Completion
2011-03-07 Perforation Treatment Performed - Multi-Stage Fracture
2011-03-09 Perforation Treatment Performed - Multi-Stage Fracture
2011-03-14 Perforation Treatment Performed - Multi-Stage Fracture
2011-03-15 Well Began Production
2011-03-15 Well Fluid changed to Crude Oil
2011-03-15 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-11-28 888.10 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-12-22 Open Hole/Barefoot Completion 2538.70 2562.00 0
2011-03-14 Multi-Stage Fracture 1734.50 1734.60 0
2011-03-14 Multi-Stage Fracture 1645.50 1645.60 0
2011-03-14 Multi-Stage Fracture 1543.50 1543.60 0
2011-03-14 Multi-Stage Fracture 1441.50 1441.60 0
2011-03-07 Multi-Stage Fracture 2538.00 2538.10 0
2011-03-07 Multi-Stage Fracture 2474.00 2474.10 0
2011-03-07 Multi-Stage Fracture 2372.00 2372.10 0
2011-03-07 Multi-Stage Fracture 2270.00 2270.10 0
2011-03-07 Multi-Stage Fracture 2167.90 2168.00 0
2011-03-07 Multi-Stage Fracture 2065.90 2066.00 0
2011-03-09 Multi-Stage Fracture 1963.80 1963.90 0
2011-03-09 Multi-Stage Fracture 1849.20 1849.30 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 3490 0.0 0.0 0.0
2012 6987 0.0 0.0 0.0
2013 6687 0.0 0.0 0.0
2014 4394 0.0 0.0 0.0
2015 6624 0.0 0.0 0.0
2016 7069 0.0 0.0 0.0
2017 7019 0.0 0.0 0.0
2018 6960 0.0 0.0 0.0
2019 8220 0.0 0.0 0.0
2020 2033 0.0 0.0 0.0

For data sources see[6]

References