X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0676092706002

Well Details

Well ID: 0676092706002
Loading map...
Location: 00/06-27-067-09W6/2
Location Alias: 00/06-27-67-09 W6M
Location Alias 2: 00/06-27-067-09 W6/02
Country: Canada
Province: Alberta
Township: 067
Meridian: 6
Range: 09
Section: 27
County/Municipality: Municipal District of Greenview No. 16
Well Name: AMOCO ET AL STONY CREEK 6-27-67-9
Operator Name: Plains Midstream Canada ULC
License Number: 0075909
License Date: 1979-05-28
License Status: Re-Entered
Spud Date: 1979-06-20
Final Drill Date: 1979-09-02
Well Total Depth: 2777.00 m
Surface Hole Latitude: 54.826056
Surface Hole Longitude: -119.289764

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-05-28 Obtained License
1979-08-06 Drill Stem Test Performed
1979-08-18 Drill Stem Test Performed
1979-08-19 Drill Stem Test Performed
1979-09-02 Finished Drilling
1979-09-05 Liner Casing Operation Performed
1979-09-29 Perforation Treatment Performed - Jet Perforation
1979-11-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1979-11-10 Perforation Treatment Performed - Jet Perforation
1979-11-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-02-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-02-08 Perforation Treatment Performed - Jet Perforation
1980-02-10 Perforation Treatment Performed - Fractured
1980-02-15 Perforation Treatment Performed - Jet Perforation
1980-02-17 Perforation Treatment Performed - Fractured
1980-02-18 Perforation Treatment Performed - Fractured
1980-06-26 Perforation Treatment Performed - Casing Patch (Over Perfs)
1980-06-27 Perforation Treatment Performed - Casing Patch (Over Perfs)
1980-07-03 Perforation Treatment Performed - Jet Perforation
1980-07-04 Perforation Treatment Performed - Fractured
1980-10-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-10-20 Perforation Treatment Performed - Jet Perforation
1980-10-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-11-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-11-22 Perforation Treatment Performed - Jet Perforation
1980-11-23 Perforation Treatment Performed - Fractured
1982-10-12 Perforation Treatment Performed - Cement Squeeze
1982-10-14 Perforation Treatment Performed - Jet Perforation
1982-10-16 Perforation Treatment Performed - Cement Squeeze
1982-10-19 Perforation Treatment Performed - Jet Perforation
1982-10-25 Perforation Treatment Performed - Fractured
1982-11-25 Perforation Treatment Performed - Jet Perforation
1982-11-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-11-28 Perforation Treatment Performed - Fractured
1983-06-20 Well Mode changed to Drilled and Cased
1984-01-13 Perforation Treatment Performed - Fractured
1984-02-01 Well Began Production
1984-02-01 Well Fluid changed to Gas
1984-02-01 Well Mode changed to Flowing
1984-03-01 Well Fluid changed to Gas
1984-03-01 Well Mode changed to Suspended
1985-09-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-09-15 Plug Back Performed
1985-09-21 Well Log Performed
1985-09-25 Well Log Performed
1985-09-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-09-26 Plug Back Performed
1985-09-26 Well Fluid changed to Gas
1985-09-26 Well Mode changed to Abandoned Zone
1985-09-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-10-04 Perforation Treatment Performed - Jet Perforation
1985-10-05 Perforation Treatment Performed - Fractured
1985-11-15 Well Log Performed
1985-12-11 Well Log Performed
1990-12-10 Well Log Performed
1990-12-11 Well Log Performed
1990-12-12 Perforation Treatment Performed - Jet Perforation
1990-12-13 Perforation Treatment Performed - Cement Squeeze
1990-12-18 Perforation Treatment Performed - Jet Perforation
1991-02-24 Perforation Treatment Performed - Fractured
1991-03-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-03-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-03-24 Well Abandoned
1996-03-02 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-09-29 Perforation 2606.00 2635.00 13
1980-02-15 Perforation 1120.00 1130.00 13
1980-02-17 Fracture 1109.00 1130.00 0
1980-02-18 Fracture 1109.00 1130.00 0
1980-06-26 Casing Patch 1118.20 1131.90 0
1980-06-27 Casing Patch 1107.40 1113.60 0
1980-07-03 Perforation 2470.00 2477.00 13
1980-07-03 Perforation 2484.00 2499.00 13
1980-07-04 Fracture 2470.00 2499.00 0
1980-10-19 Packing Device Capped w/Cement 2460.00 2460.00 0
1980-10-20 Perforation 2163.50 2169.00 13
1979-11-08 Packing Device Capped w/Cement 2595.00 2595.00 0
1980-10-22 Acid Treatment 2163.50 2169.00 0
1980-11-22 Packing Device Capped w/Cement 2155.00 2155.00 0
1980-11-22 Perforation 2040.00 2049.00 0
1980-11-23 Fracture 2040.00 2049.00 0
1982-10-12 Cement Squeeze 2040.00 2049.00 0
1982-10-14 Perforation 2163.50 2169.00 13
1982-10-16 Cement Squeeze 2163.50 2169.00 0
1982-10-19 Perforation 2470.00 2477.00 13
1982-10-19 Perforation 2484.00 2499.00 13
1982-10-25 Fracture 2470.00 2499.00 0
1979-11-10 Perforation 2535.00 2544.00 13
1982-11-25 Perforation 2173.00 2177.00 13
1982-11-25 Perforation 2163.50 2169.00 13
1982-11-26 Acid Treatment 2163.50 2177.00 0
1982-11-28 Fracture 2163.50 2177.00 0
1984-01-13 Fracture 2163.50 2177.00 0
1985-09-15 Packing Device Capped w/Cement 2427.00 2435.00 0
1985-09-26 Packing Device Capped w/Cement 2149.00 2157.00 0
1985-09-28 Packing Device Capped w/Cement 1106.00 1200.00 0
1985-10-04 Perforation 2104.00 2117.00 0
1985-10-05 Fracture 2104.00 2117.00 0
1979-11-11 Acid Treatment 2535.00 2544.00 0
1990-12-12 Perforation 2125.50 2126.50 20
1990-12-13 Cement Squeeze 2104.00 2126.50 0
1990-12-18 Perforation 2104.00 2117.00 39
1991-02-24 Fracture 2104.00 2117.00 0
1991-03-23 Packing Device Capped w/Cement 2087.00 2095.00 0
1991-03-24 Packing Device Capped w/Cement 2022.00 2030.00 0
1991-03-24 Packing Device Capped w/Cement 1091.00 1099.00 0
1980-02-08 Packing Device Capped w/Cement 2531.00 2531.00 0
1980-02-08 Perforation 1109.00 1112.00 13
1980-02-08 Perforation 1120.00 1130.00 0
1980-02-10 Fracture 1109.00 1130.00 0
1980-02-15 Perforation 1109.00 1112.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 1426 0.0 0.0 0.0

For data sources see[5]

References